Prepare Draft DAP Narrative Clause Samples
Prepare Draft DAP Narrative. Consultant shall prepare a Draft DAP Narrative. The narrative must reference and address all of the reports, technical memoranda and plans/drawings that are listed below. Plans and drawings must be attached as appendices to the Draft DAP Narrative in the DAP submittal package. • Description of the purpose, need, and design solution for the Project; • Summary of existing conditions, (i.e., Project location, highway classification, lanes, ADT, posted speed, roadside inventory, and other design standards pertinent to the Project); • Outline of Project constraints such as topography, geology, hydrology, environmental, permits, ROW, utilities and cost (NOTE: these may be executive summaries prepared by Consultant for other deliverables associated with this Project); • Traffic analysis results; • Environmental impacts and mitigation measures; (Provided by Agency) • Environmental permitting requirements; (Provided by Agency) • Survey Control Data; • List of utility conflicts and utility contact information; • Signage and striping requirements; • Drainage needs (if any); • Constructability Recommendations; • Level 1 Hazardous Materials Corridor Study; • Local permit needs; • Construction cost estimate; • Draft Mobility Considerations Checklist and Work Zone Decision Tree; • Temporary traffic control requirements; and • Schedule to PS&E and construction bid letting. • Draft DAP Narrative submitted with Task 10.4 submittal Task 10.2 Prepare Design Exception Requests - (CONTINGENCY TASK-See Section F) Consultant shall prepare up to (X) draft Design Exception Requests for the Project. The Design Exception Requests must be prepared using the standard Design Exception Request form defined in the Highway Design Manual. The Agency will provide comments on the draft Design Exception Requests within ten (10) business days of the submittal to Agency. The final Design Exception Requests for the Project must be submitted no later than ten (10) business days after receipt of comments from Agency. The Agency will coordinate approval of the Design Exception Requests.
