Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE: (a) Remove all logs as described under Section 45, "Log Removal." (b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE. (c) Block roads and skid trails to vehicular traffic as directed by STATE. (d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE: (1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities. (2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities. (3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities. (4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials." (5) Close the road at Point A within 14 days after completion of log hauling activities on this road. (6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. (7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities. (8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed burning by STATE.STATE according to the specifications in Exhibit G.
(76) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A Complete slash piling within 14 30 calendar days after completion of log hauling activities yarding operations on this roadthe timber sale area, or by October 1, 2003, whichever comes first.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend up to 16 hours to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 16 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 30 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 30 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 Within 10 days after completion of log hauling activities on this road.
(6) Upon completion of a each setting, an excavator or all slash and debris within reach of landings by log loader shall pull debris from within reach of a landing and pile the debris be piled in the center of the landing. Debris Material suitable for firewood shall be separated into individual piles accessible to for firewood cutterscutting. Debris Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 15 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III .
(R/We) and placed Expend up to 15 hours with a log loader piling slash in Windy Creek according to instructions given Phellinus pockets as required by the Roseburg Oregon Department section titled, “Slash Disposal,” within 14 calendar days after completion of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usedyarding activities. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(75) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 6) Remove right-of-way logs from a road segment prior to subgrade approval.
(7) Clear all logging slash from Recreational Trails as described in Section 64, “Protection of Recreational Trails” within 14 days after yarding has been completed.
(8) Complete all barriers and road block as described in Section 64, “Protection of Recreational Trails” within 14 days after yarding has been completed. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 2½ hours with a log loader or excavator placing retrieving large woody debris in Windy Creeksuitable for firewood from landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 14 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 30 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(67) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(78) Within 14 days after completion of yarding activities, restore the ATV trail to its pre-logging condition.
(9) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D J and as directed by STATE.
(c) Block roads In Areas 4 and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek5, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities on a timber sale area.
(72) Remove all trash from a timber sale area within 30 calendar days after completion of yarding activities.
(3) Remove all equipment and materials from a timber sale area within 30 calendar days after completion of yarding activities. See Section 23, "Removal of Equipment and Materials."
(4) Begin slash piling within 14 calendar days after completion of yarding operations on Areas 4 and/or 5.
(5) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend up to 10 hours with a log loader to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 6 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell snags as required by the contract and as directed by STATE, within 14 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities, but prior to March 15, 2005.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 6667. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend up to 16 hours to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 16 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained .
(e) For the purpose of reserve tree protection from Area III (R/W) and placed in Windy Creek according fire, expend up to instructions given 24 hours with track-mounted excavator piling slash as directed by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usedSTATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation Construct fire trails as required by the section titled, “Snag CreationFire Trails,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 30 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road roads at Point A Points A, C, G, and E within 14 days after completion of log hauling activities on this roadthese roads.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block Expend 25 hours of shovel time to block roads and skid trails roads to vehicular traffic as directed by STATE.
(d) Expend up to 40 5 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(74) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 5) Remove right-of-way logs from a road segment prior to subgrade approval.
(6) All felling and yarding on Area II must be conducted between September 1, 2003, and December 31, 2004. FIRE CONTROL AND SLASH DISPOSAL Section 6665. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as specified in Exhibit E or as directed by STATE.
(d) Expend up to 40 5 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(5) Close the road at Point A within Within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a each setting, an excavator or all slash and debris within reach of landings by log loader shall pull debris from within reach of a landing and pile the debris be piled in the center of the landing. Debris Material suitable for firewood shall be separated into individual piles accessible to for firewood cutterscutting. Debris Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads roads, unauthorized OHV trails, and skid trails to vehicular traffic as directed by STATE.STATE and described in Exhibit G.
(d) Expend up to 40 20 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III .
(R/We) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not Remove all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usedtrash. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A Complete slash piling (Section 68) within 14 30 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(65) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections section titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval.
(8) Clear all logging slash from OHV trails as described in the section titled, "Protection of Recreational Trails" within 14 days after yarding has been completed. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 16 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements snag creation, as required by the section titled, “FellingSnag Creation,” within 14 30 calendar days after completion of yarding activities.
(2) Complete snag creation Construct fire trails, as required by the section titled, “Snag CreationFire Trails,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A D within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment 7) Complete all felling requirements, as required by the section titled, “Felling,” prior to subgrade approvalMarch 15, 2005.
(8) Complete project work by October 1, 2003. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not Remove all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usedtrash. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activitiesactivities and prior to March 15, 2005.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A E within 14 days after completion of log hauling activities on this road.
(65) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval.
(8) Begin trail cleaning and tread restoration on hiking trail within 7 days after yarding is completed in Area II and complete it within 14 days.
(9) Once operating commences in Area II, it must be completed if operations are occurring in any of the timber sale areas.
(10) Complete project work by November 1, 2003. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours 1/4 hour with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from .
(e) Complete felling and yarding on Area III (R/W) and placed in Windy Creek according prior to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour felling Area II to provide for each hour not usedgenetic substitute trees. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 6) Remove right-of-way logs from a road segment prior to subgrade approval.
(7) Complete the requirements in the section titled, "Felling for Down Wood," within 30 days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D G and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with In Areas 1 and 2, upon completion of each setting, all slash and debris within reach of landings by a log loader or excavator placing large woody shall be piled in the center of the landing. Material suitable for firewood shall be separated into individual piles accessible for firewood cutting. Other debris in Windy Creekshall be piled so as to facilitate pile burning, as directed by STATE.
(e) In Areas 3, 4, 5, 6, A, B, C, D, E, and F, upon completion of each setting, all slash and debris shall be dispersed within the timber sale area to a depth not to exceed one and a half feet. Large wood will Debris shall not be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can left lodged against standing trees. Material suitable for firewood shall be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour separated into individual piles accessible for each hour not usedfirewood cutting. In addition, PURCHASER shall complete the following requirements on a timber sale area within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling yarding activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(75) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling yarding activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(5) In Areas 1, 2, 3, 4, and 6A, upon completion of a setting, all slash and debris shall be dispersed within the timber sale area to a depth not to exceed one and a half feet. Debris shall not be left lodged against standing trees. Material suitable for firewood cutting shall be piled separately from other slash, as directed by STATE.
(6) Upon In Areas 5, 6B, and 7, upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval.
(9) Dirt roads and road segments 7A to 7B shall be ripped and/or “crunched” concurrently with slash piling within 14 days of completion of log hauling operations on a timber sale area. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours 1/4 hour per landing with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend up to 8 hours with a log loader to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 8 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell snags as required by the contract and as directed by STATE, within 14 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Agreement
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell snags as required by the contract and as directed by STATE, within 14 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 7 calendar days after completion of log hauling yarding activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(56) Close the road at Point A B within 14 7 days after completion of log hauling activities on this road.
(67) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) 8) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 7 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend 12 hours of shovel time to block roads and skid trails roads to vehicular traffic as directed by STATE.
(d) Expend up to 40 8 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A Clear all logging slash from Recreational Trails as described in "Protection of Recreational Trails" within 14 days after completion of log hauling activities on this roadyarding has been completed.
(6) Upon completion Complete all barriers and road blocks as described in "Protection of a setting, an excavator or log loader shall pull debris from Recreational Trails" within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE14 days after yarding has been completed.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block Expend up to 16 hours with a log loader to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 16 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements Fell snags, as required by the section titledcontract and as directed by STATE, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation all felling requirements, as required by the section titled, “Snag CreationFelling,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A Complete slash treatment within 14 30 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up Skid roads exceeding 15 percent grade must be waterbarred immediately following completion of use. Other sloping skid trails must be waterbarred prior to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according moving yarding operations to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usednext setting. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 30 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(64) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(75) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 6) Remove right-of-way logs from a road segment prior to subgrade approval.
(7) Close roads between 1A to 1B, 1C to 1D, 1E to 1F, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, and 3A to 3B within 30 days after completion of log hauling activities on these roads and annually between October 1 and May 31. FIRE CONTROL AND SLASH DISPOSAL Section 6665. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A Complete slash piling within 14 30 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D B and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 8 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” Fell trees selected for down wood requirement within 14 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements, as required by the section titled, “Felling,” within 30 calendar days after completion of yarding activities.
(3) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Construct fire trails, as required by the section titled, “Fire Trails,” within 30 calendar days after completion of yarding activities.
(5) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling yarding activities.
(46) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(67) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) 8) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D H and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a settingsetting in Area 10, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(72) Complete tree topping, as required by the section titled, “Tree Topping,” within 30 calendar days after completion of yarding activities on Area 10.
(3) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(4) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(5) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(6) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block Expend up to 10 hours with a log loader to block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 10 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities, but no later than March 15, 2005.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling yarding activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(64) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(75) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 6) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Agreement
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D G and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up In Areas 1 and 2, place debris from yarding (tops, limbs, cull logs, etc.) in a stable location approved by STATE prior to 40 hours with moving to another landing area. Debris shall not be left lodged against standing trees. Debris piles shall be dispersed within the timber sale units to a log loader or excavator placing large woody debris in Windy Creekdepth not to exceed one and a half feet. Material suitable for firewood cutting shall be piled separately from other slash, as directed by STATE.
(e) In Areas 3, 4, 5, and 6, place debris from yarding in the center of the landing prior to moving to another landing area to facilitate pile burning. Large wood will Material suitable for firewood cutting shall be obtained piled separately from Area III (R/W) and placed in Windy Creek according to instructions given other slash, as directed by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not usedSTATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling yarding activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(54) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roadeach individual timber sale area.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(75) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 2½ hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on landings, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Close Begin slash piling patch cuts in Area III, within 14 calendar days after completion of yarding operations on the road at Point A within timber sale area.
(7) Within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a each setting, an excavator or all slash and debris within reach of landings by log loader shall pull debris from within reach of a landing and pile the debris be piled in the center of the landing. Debris Material suitable for firewood shall be separated into individual piles accessible to for firewood cutterscutting. Debris Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) 8) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 9) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D J and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a settingsetting in Areas 2, 6, 11, and 12, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(72) Complete tree topping, as required by the section titled, “Tree Topping,” within 30 calendar days after completion of yarding activities on Area 6.
(3) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(4) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(5) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(6) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activitiesactivities on a major road section. Major road sections are:
(A) Areas 1, 2, and 3 access.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees B) Areas 4, 5, and contractors of PURCHASER 6 access.
(C) Areas 7 and the employees of such contractors to do likewise. STATE may8 access.
(D) Areas 10, at any time during the contract period11, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary12 access.
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this roadroad by constructing a tank trap as directed by STATE.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.according to the specifications in Exhibit F.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 16 hours with a log loader or excavator placing retrieving large woody debris in Windy Creekfrom landing slash and stacking it on the landing, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities, and on or before March 15, 2006.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 10 calendar days after completion of log hauling yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A Complete slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area and on or before October 1, 2006.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) 7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road roads at Point A Points E and F within 14 days after completion of log hauling activities on this roadthese roads.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area prior to moving to a new timber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 Within 10 days after completion of log hauling activities on this road.
(6) Upon completion of a each setting, an excavator or all slash and debris within reach of landings by log loader shall pull debris from within reach of a landing and pile the debris be piled in the center of the landing. Debris Material suitable for firewood shall be separated into individual piles accessible to for firewood cutterscutting. Debris Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(76) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 30 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 14 calendar days after completion of yarding activities.
(2) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(23) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(34) Remove all trash from the timber sale area within 14 30 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Close the road at Point A Begin slash piling within 14 calendar days after completion of log hauling activities yarding operations on this roada timber sale area.
(67) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) 8) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) 9) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each timber sale area setting prior to moving to a new timber sale areasetting, unless otherwise approved in writing by STATE:
(a) Remove all logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Expend up to 40 hours with a log loader or excavator placing large woody debris in Windy Creek, as directed by STATE. Large wood will be obtained from Area III (R/W) and placed in Windy Creek according to instructions given by the Roseburg Oregon Department of Fish and Wildlife district biologist who can be reached at (000) 000-0000. If, during the time of this contract, STATE determines that not all the hours are needed, PURCHASER shall pay STATE $100.00 per hour for each hour not used. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Complete snag creation as required by the section titled, “Snag Creation,” within 14 calendar days after completion of yarding activities.
(3) Fell trees selected for down wood requirement within 14 calendar days after completion of yarding activities.
(4) Remove all trash from the timber sale area within 14 30 calendar days after completion of log hauling activities.
(45) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(6) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(7) Complete road maintenance requirements of the sections titled, “Access” and “Road Maintenance,” within 14 calendar days after completion of log hauling activities.
(8) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL Section 66. Precautions Against Fire. It is recognized that the activities of PURCHASER under this contract may cause extraordinary fire risk on the areas of operations. PURCHASER agrees to use the highest degree of care to prevent forest fires from starting on or from spreading to the areas of operations. PURCHASER shall require the employees and contractors of PURCHASER and the employees of such contractors to do likewise. STATE may, at any time during the contract period, require PURCHASER to prepare a Fire Plan for the areas of operations. The plan shall set forth the resources and required actions to be taken by PURCHASER and contractors of PURCHASER for the prevention and suppression of fire on the areas of operations. The plan shall meet with the approval of STATE and may be revised as necessary.DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract