Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE: (a) Remove all logs, as described under Section 45, "Log Removal." (b) Construct cross-drainage ditches or waterbars as specified in Exhibit H and as directed by STATE. (c) Block roads and skid trails to vehicular traffic as directed by STATE. (d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE: (1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities. (2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area. (3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities. (4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials." (5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(d2) Complete snag creation, as required by the section titled, “Snag Creation,” within 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 10 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities.
(7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H G and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, 4 and 5 shall each be considered a timber sale area5.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(5) Close the road at Point 3A within 10 days after completion of log hauling activities on this road.
(6) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H B and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete snag creation, as required by the section titled, “Snag Creation,” within 21 calendar days after completion of yarding activities.
(d2) Remove all trash from the timber sale area within 21 calendar days after completion of log hauling activities.
(3) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 14 calendar days after completion of log hauling activities.
(6) Remove right-of-way logs from a road segment prior to subgrade approval.
(7) Haul right-of-way logs to an approved scaling location within 14 days after yarding has been completed. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H B and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(d2) Remove all trash from the timber sale area within 30 calendar days after completion of log hauling activities.
(3) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(5) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H B and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Skid roads exceeding 15 percent grade must be waterbarred immediately following completion of use, and other sloping skid trails must be waterbarred prior to moving yarding operations to the next setting (see Exhibit B).
(e) Upon completion of a setting, PURCHASER shall use an excavator or log loader shall to pull in debris from within reach of a landing and pile the debris in the center of the landing. Debris Material suitable for firewood shall be separated into individual piles accessible piled in a manner which facilities firewood cutting. Other debris shall be dispersed within the timber sale area to a depth not exceeding one and one-half feet. Slash and firewood cutters. Debris shall be piled so as to facilitate pile burning, in stable locations as directed by STATESTATE and shall not be left lodged against standing trees. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(42) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(53) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting timber sale area prior to moving to a new settingtimber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of Expend up to 9 hours with a setting, an excavator or log loader shall pull retrieving large woody debris from within reach of a landing slash and pile stacking it on the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burninglandings, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Within 14 days after completion of each setting, all slash and debris within reach of landings by log loader shall be piled in the center of the landing. Material suitable for firewood shall be separated into individual piles accessible for firewood cutting. Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 14 calendar days after completion of log hauling activities.
(6) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H B and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris shall be piled so as to facilitate pile burning, as directed by STATE.
(5) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area.
(6) Close and vacate all "Non-Project" roads within 14 days after completion of slash piling.
(7) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling Complete snag creation as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale areaactivities.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Within 10 days after completion of each setting, all slash and debris within reach of landings by log loader shall be piled in the center of the landing. Material suitable for firewood shall be separated into individual piles accessible for firewood cutting. Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(6) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H G and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion In Areas 1, 3, and 4: All slash and debris within reach of a setting, an excavator or landings by log loader shall pull debris from within reach of a landing and pile the debris be piled in the center of the landing. Debris Materials suitable for firewood shall be separated into individual piles accessible to for firewood cutterscutting. Debris Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(e) Skid roads exceeding 15 percent grade must be waterbarred immediately following completion of use, and other sloping skid trails must be waterbarred prior to moving yarding operations to the next setting. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 30 calendar days after completion of yarding activitiesactivities in Areas 1, 3, and 4.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(43) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Begin slash piling within 14 calendar days after completion of yarding operations on Areas 1, 3, and 4.
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting timber sale area prior to moving to a new settingtimber sale area, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing specified in Exhibit F and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Fell trees selected for down wood requirement within 30 calendar days after completion of yarding activities.
(2) Complete all felling requirements, requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from Complete snag creation as required by the timber sale area section titled, “Snag Creation,” within 30 calendar days after completion of yarding activities.
(4) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(5) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 14 calendar days after completion of log hauling activities.
(7) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE.
(d) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling Complete snag creation, as required by the section titled, “Snag Creation,” within 14 30 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale areaactivities.
(3) Remove all trash from the timber sale area within 30 14 calendar days after completion of yarding log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Within 10 days after completion of each setting, all slash and debris within reach of landings by log loader shall be piled in the center of the landing. Material suitable for firewood shall be separated into individual piles accessible for firewood cutting. Other debris shall be piled so as to facilitate pile burning, as directed by STATE.
(6) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(d2) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(3) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 calendar days after completion of log hauling activities.
(6) Remove right-of-way logs from a road segment prior to subgrade approval. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H F and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(d2) Complete snag creation as required by the section titled, “Snag Creation,” within 30 calendar days after completion of yarding activities.
(3) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(56) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 14 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H E and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(d2) Remove all trash from the timber sale area within 14 calendar days after completion of log hauling activities.
(3) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(4) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 7 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract
Progressive Operations. PURCHASER shall complete the following requirements on each setting prior to moving to a new setting, unless otherwise approved in writing by STATE:
(a) Remove all logs, logs as described under Section 45, "Log Removal."
(b) Construct cross-drainage ditches or waterbars as specified in Exhibit H D and as directed by STATE.
(c) Block roads and skid trails to vehicular traffic as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Remove all trash from the timber sale area within 14 calendar days after completion of yarding activities.
(d2) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(3) Close the road at Point A within 14 days after completion of log hauling activities on this road.
(4) Upon completion of a setting, an excavator or log loader shall pull debris from within reach of a landing and pile the debris in the center of the landing. Debris suitable for firewood shall be separated into individual piles accessible to firewood cutters. Debris shall be piled so as to facilitate pile burning, as directed by STATE. In addition, PURCHASER shall complete the following requirements within the following time frames, unless otherwise approved in writing by STATE:
(1) Complete all felling requirements, as required by the section titled, “Felling,” within 14 calendar days after completion of yarding activities.
(2) Begin slash piling within 14 calendar days after completion of yarding operations on a timber sale area. Areas 1, 2, 3A, 4A, and 5 shall each be considered a timber sale area.
(3) Remove all trash from the timber sale area within 30 calendar days after completion of yarding activities.
(4) Remove all equipment and materials from the timber sale area within 30 calendar days after completion of log hauling activities. See Section 23, "Removal of Equipment and Materials."
(5) Complete road maintenance requirements of the sections titled, “Access,” and “Road Maintenance,” within 30 14 calendar days after completion of log hauling activities. FIRE CONTROL AND SLASH DISPOSAL
Appears in 1 contract
Samples: Timber Sale Contract