Common use of PROJECT FINANCING AND EXPENSES SCHEME Clause in Contracts

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 a.) Acquisition Expenses $ 220,500 Fee Simple $ 220,500 Easement $ 0 b.)Planning and Implementation: $ 7,500 Appraisal $ 3,500 Title Work $ 2,550 Closing costs $ 1,000 Environmental Assessments $ 450 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

AutoNDA by SimpleDocs

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,603,144 a.) Acquisition Expenses $ 220,500 1,237,805 Fee Simple $ 220,500 0 Easement $ 0 1,237,805 b.)Planning and Implementation: $ 7,500 0 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,071,000 a.) Acquisition Expenses $ 220,500 934,000 Fee Simple $ 220,500 934,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 31,900 Appraisal $ 3,500 1,900 Title Work $ 2,550 0 Closing costs $ 1,000 28,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 118,175 a.) Acquisition Expenses $ 220,500 110,811 Fee Simple $ 220,500 110,811 Easement $ 0 b.)Planning and Implementation: $ 7,500 7,364 Appraisal $ 3,500 1,650 Title Work $ 2,550 0 Closing costs $ 1,000 2,564 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,150

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 484,500 a.) Acquisition Expenses $ 220,500 470,000 Fee Simple $ 220,500 470,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 14,500 Appraisal $ 3,500 3,000 Title Work $ 2,550 8,000 Closing costs $ 1,000 Environmental Assessments $ 450 2,500 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 25,500 a.) Acquisition Expenses $ 220,500 18,000 Fee Simple $ 220,500 18,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 2,500 Appraisal $ 3,500 500 Title Work $ 2,550 1,000 Closing costs $ 1,000 250 Environmental Assessments $ 450 750 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 5,000 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,046,625 a.) Acquisition Expenses $ 220,500 1,987,500 Fee Simple $ 220,500 1,987,500 Easement $ 0 b.)Planning and Implementation: $ 7,500 14,125 Appraisal $ 3,500 4,225 Title Work $ 2,550 500 Closing costs $ 1,000 500 Environmental Assessments $ 450 2,000 Design $ 0 Other Eligible Planning Costs $ 06,900

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 545,335 a.) Acquisition Expenses $ 220,500 470,000 Fee Simple $ 220,500 470,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 13,250 Appraisal $ 3,500 Title Work $ 2,550 0 Closing costs $ 1,000 3,000 Environmental Assessments $ 450 2,750 Design $ 0 Other Eligible Planning Costs $ 04,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 359,000 a.) Acquisition Expenses $ 220,500 300,000 Fee Simple $ 220,500 300,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 12,500 Appraisal $ 3,500 3,000 Title Work $ 2,550 2,000 Closing costs $ 1,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 6,500 c.)Site Improvements: $ 46,500 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 379,866 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 35,000 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 2,000 Design $ 0 Other Eligible Planning Costs $ 033,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 850,099 a.) Acquisition Expenses $ 220,500 835,000 Fee Simple $ 220,500 835,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 15,099 Appraisal $ 3,500 4,000 Title Work $ 2,550 500 Closing costs $ 1,000 7,349 Environmental Assessments $ 450 500 Design $ 0 Other Eligible Planning Costs $ 02,750

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 175,190 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 5,100 Appraisal $ 3,500 0 Title Work $ 2,550 3,100 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 509,026 a.) Acquisition Expenses $ 220,500 280,000 Fee Simple $ 220,500 280,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 29,500 Appraisal $ 3,500 5,000 Title Work $ 2,550 700 Closing costs $ 1,000 800 Environmental Assessments $ 450 10,000 Design $ 0 Other Eligible Planning Costs $ 013,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,327,884 a.) Acquisition Expenses $ 220,500 2,048,000 Fee Simple $ 220,500 2,048,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 15,500 Appraisal $ 3,500 2,500 Title Work $ 2,550 5,000 Closing costs $ 1,000 500 Environmental Assessments $ 450 2,500 Design $ 0 Other Eligible Planning Costs $ 05,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 430,400 a.) Acquisition Expenses $ 220,500 390,000 Fee Simple $ 220,500 390,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 20,400 Appraisal $ 3,500 3,600 Title Work $ 2,550 5,000 Closing costs $ 1,000 600 Environmental Assessments $ 450 1,200 Design $ 0 Other Eligible Planning Costs $ 010,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 259,648 a.) Acquisition Expenses $ 220,500 214,257 Fee Simple $ 220,500 214,257 Easement $ 0 b.)Planning and Implementation: $ 7,500 18,504 Appraisal $ 3,500 4,800 Title Work $ 2,550 250 Closing costs $ 1,000 250 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 013,204 c.)Site Improvements: $ 23,450

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 808,750 a.) Acquisition Expenses $ 220,500 731,250 Fee Simple $ 220,500 0 Easement $ 0 731,250 b.)Planning and Implementation: $ 7,500 77,500 Appraisal $ 3,500 9,000 Title Work $ 2,550 500 Closing costs $ 1,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 067,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 119,950 a.) Acquisition Expenses $ 220,500 80,000 Fee Simple $ 220,500 80,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 38,350 Appraisal $ 3,500 4,500 Title Work $ 2,550 1,500 Closing costs $ 1,000 250 Environmental Assessments $ 450 9,600 Design $ 0 22,500 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 86,000 a.) Acquisition Expenses $ 220,500 80,000 Fee Simple $ 220,500 80,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 4,000 Appraisal $ 3,500 3,000 Title Work $ 2,550 500 Closing costs $ 1,000 500 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,756,260 a.) Acquisition Expenses $ 220,500 1,738,260 Fee Simple $ 220,500 1,738,260 Easement $ 0 b.)Planning and Implementation: $ 7,500 15,500 Appraisal $ 3,500 3,000 Title Work $ 2,550 4,000 Closing costs $ 1,000 2,500 Environmental Assessments $ 450 4,000 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 295,258 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 23,700 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 2,700 Design $ 0 15,000 Other Eligible Planning Costs $ 06,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,193,000 a.) Acquisition Expenses $ 220,500 222,500 Fee Simple $ 220,500 222,500 Easement $ 0 b.)Planning and Implementation: $ 7,500 57,000 Appraisal $ 3,500 15,000 Title Work $ 2,550 15,000 Closing costs $ 1,000 3,000 Environmental Assessments $ 450 6,000 Design $ 0 Other Eligible Planning Costs $ 018,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,222,920 a.) Acquisition Expenses $ 220,500 2,200,000 Fee Simple $ 220,500 2,200,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 22,920 Appraisal $ 3,500 7,000 Title Work $ 2,550 0 Closing costs $ 1,000 7,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 08,920

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 750,000 a.) Acquisition Expenses $ 220,500 720,000 Fee Simple $ 220,500 720,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 30,000 Appraisal $ 3,500 5,000 Title Work $ 2,550 1,500 Closing costs $ 1,000 Environmental Assessments $ 450 12,500 Design $ 0 10,000 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 248,704 a.) Acquisition Expenses $ 220,500 236,773 Fee Simple $ 220,500 236,773 Easement $ 0 b.)Planning and Implementation: $ 7,500 11,931 Appraisal $ 3,500 3,000 Title Work $ 2,550 982 Closing costs $ 1,000 424 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 07,525

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,704,244 a.) Acquisition Expenses $ 220,500 2,582,744 Fee Simple $ 220,500 0 Easement $ 0 2,582,744 b.)Planning and Implementation: $ 7,500 30,000 Appraisal $ 3,500 0 Title Work $ 2,550 7,500 Closing costs $ 1,000 5,500 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 017,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 449,357 a.) Acquisition Expenses $ 220,500 439,757 Fee Simple $ 220,500 439,757 Easement $ 0 b.)Planning and Implementation: $ 7,500 9,600 Appraisal $ 3,500 3,000 Title Work $ 2,550 1,200 Closing costs $ 1,000 1,400 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 04,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 3,408,000 a.) Acquisition Expenses $ 220,500 3,355,000 Fee Simple $ 220,500 3,355,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 52,000 Appraisal $ 3,500 6,000 Title Work $ 2,550 10,000 Closing costs $ 1,000 Environmental Assessments $ 450 5,000 Design $ 0 Other Eligible Planning Costs $ 30,000 c.) Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 613,000 a.) Acquisition Expenses $ 220,500 586,000 Fee Simple $ 220,500 586,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 13,000 Appraisal $ 3,500 8,100 Title Work $ 2,550 600 Closing costs $ 1,000 0 Environmental Assessments $ 450 4,300 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 14,000 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 189,625 a.) Acquisition Expenses $ 220,500 182,875 Fee Simple $ 220,500 182,875 Easement $ 0 b.)Planning and Implementation: $ 7,500 6,750 Appraisal $ 3,500 1,750 Title Work $ 2,550 2,000 Closing costs $ 1,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 4,511,800 a.) Acquisition Expenses $ 220,500 4,500,000 Fee Simple $ 220,500 4,500,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 10,000 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 10,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0 c.) Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 844,148 a.) Acquisition Expenses $ 220,500 184,448 Fee Simple $ 220,500 184,448 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 104,200 Appraisal $ 3,500 3,000 Title Work $ 2,550 5,000 Closing costs $ 1,000 2,500 Environmental Assessments $ 450 15,000 Design $ 0 47,200 Other Eligible Planning Costs $ 031,500 c.)Site Improvements: $ 495,000 d.)Permits, Advertising, Legal: $ 1,500 e.)Contingencies: $ 59,000 ====================

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 357,500 a.) Acquisition Expenses $ 220,500 330,000 Fee Simple $ 220,500 0 Easement $ 0 330,000 b.)Planning and Implementation: $ 7,500 24,500 Appraisal $ 3,500 19,500 Title Work $ 2,550 1,000 Closing costs $ 1,000 200 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,800

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 438,250 a.) Acquisition Expenses $ 220,500 407,750 Fee Simple $ 220,500 407,750 Easement $ 0 b.)Planning and Implementation: $ 7,500 30,500 Appraisal $ 3,500 5,000 Title Work $ 2,550 1,500 Closing costs $ 1,000 1,500 Environmental Assessments $ 450 12,500 Design $ 0 10,000 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 426,225 a.) Acquisition Expenses $ 220,500 382,500 Fee Simple $ 220,500 382,500 Easement $ 0 b.)Planning and Implementation: $ 7,500 9,985 Appraisal $ 3,500 1,800 Title Work $ 2,550 700 Closing costs $ 1,000 4,385 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,100 c.)Site Improvements: $ 33,740

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 616,500 a.) Acquisition Expenses $ 220,500 550,000 Fee Simple $ 220,500 550,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 26,500 Appraisal $ 3,500 10,000 Title Work $ 2,550 1,500 Closing costs $ 1,000 5,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 010,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,573,825 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 42,500 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 42,500 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 350,000 a.) Acquisition Expenses $ 220,500 300,000 Fee Simple $ 220,500 300,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 5,000 Appraisal $ 3,500 1,000 Title Work $ 2,550 1,000 Closing costs $ 1,000 3,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 00 c.)Site Improvements: $ 42,000 d.)Permits, Advertising, Legal: $ 3,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 398,803 a.) Acquisition Expenses $ 220,500 386,522 Fee Simple $ 220,500 386,522 Easement $ 0 b.)Planning and Implementation: $ 7,500 12,031 Appraisal $ 3,500 6,003 Title Work $ 2,550 1,455 Closing costs $ 1,000 2,073 Environmental Assessments $ 450 0 Design $ 0 2,500 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 626,000 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 146,000 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 75,900 Other Eligible Planning Costs $ 070,100 c.)Site Improvements: $ 399,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 288,500 a.) Acquisition Expenses $ 220,500 270,000 Fee Simple $ 220,500 270,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 18,500 Appraisal $ 3,500 Title Work $ 2,550 2,500 Closing costs $ 1,000 2,500 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 010,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 418,600 a.) Acquisition Expenses $ 220,500 48,600 Fee Simple $ 220,500 0 Easement $ 0 48,600 b.)Planning and Implementation: $ 7,500 87,700 Appraisal $ 3,500 4,500 Title Work $ 2,550 1,500 Closing costs $ 1,000 0 Environmental Assessments $ 450 7,100 Design $ 0 60,800 Other Eligible Planning Costs $ 013,800

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 432,583 a.) Acquisition Expenses $ 220,500 375,390 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning 375,390 b.) Planning and Implementation: $ 7,500 8,781 Appraisal $ 3,500 1,500 Title Work $ 2,550 0 Closing costs $ 1,000 500 Environmental Assessments $ 450 0 Design $ 0 4,281 Other Eligible Planning Costs $ 02,500 c.)Site Improvements: $ 40,412 d.)Permits, Advertising, Legal: $ 3,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 537,792 a.) Acquisition Expenses $ 220,500 2 Fee Simple $ 220,500 1 Easement $ 0 1 b.)Planning and Implementation: $ 7,500 111,000 Appraisal $ 3,500 0 Title Work $ 2,550 1,000 Closing costs $ 1,000 4,000 Environmental Assessments $ 450 0 Design $ 0 49,000 Other Eligible Planning Costs $ 057,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,046,922 a.) Acquisition Expenses $ 220,500 1,033,422 Fee Simple $ 220,500 1,033,422 Easement $ 0 b.)Planning and Implementation: $ 7,500 13,500 Appraisal $ 3,500 2,000 Title Work $ 2,550 4,000 Closing costs $ 1,000 500 Environmental Assessments $ 450 2,000 Design $ 0 Other Eligible Planning Costs $ 05,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 158,050 a.) Acquisition Expenses $ 220,500 120,000 Fee Simple $ 220,500 120,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 Appraisal $ 3,500 1,900 Title Work $ 2,550 0 Closing costs $ 1,000 3,600 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,040,627 a.) Acquisition Expenses $ 220,500 179,000 Fee Simple $ 220,500 155,000 Easement $ 0 b.)Planning 24,000 b.) Planning and Implementation: $ 7,500 269,000 Appraisal $ 3,500 7,500 Title Work $ 2,550 2,500 Closing costs $ 1,000 2,500 Environmental Assessments $ 450 5,000 Design $ 0 249,000 Other Eligible Planning Costs $ 02,500 c.) Site Improvements: $ 1,518,027 d.) Permits, Advertising, Legal: $ 0 e.)Contingencies: $ 74,600 ====================

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,960,428 a.) Acquisition Expenses $ 220,500 1,602,367 Fee Simple $ 220,500 1,602,367 Easement $ 0 b.)Planning and Implementation: $ 7,500 16,240 Appraisal $ 3,500 Title Work $ 2,550 1,000 Closing costs $ 1,000 1,500 Environmental Assessments $ 450 4,000 Design $ 0 Other Eligible Planning Costs $ 06,240

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 236,923 a.) Acquisition Expenses $ 220,500 157,000 Fee Simple $ 220,500 157,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 4,123 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 4,123 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 00 c.)Site Improvements: $ 75,800

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 678,000 a.) Acquisition Expenses $ 220,500 655,000 Fee Simple $ 220,500 655,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 12,500 Appraisal $ 3,500 7,000 Title Work $ 2,550 800 Closing costs $ 1,000 1,200 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,500

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 491,035 a.) Acquisition Expenses $ 220,500 458,000 Fee Simple $ 220,500 458,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 17,035 Appraisal $ 3,500 3,900 Title Work $ 2,550 4,180 Closing costs $ 1,000 1,320 Environmental Assessments $ 450 4,000 Design $ 0 Other Eligible Planning Costs $ 03,635

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 191,000 a.) Acquisition Expenses $ 220,500 104,400 Fee Simple $ 220,500 104,400 Easement $ 0 b.)Planning and Implementation: $ 7,500 54,500 Appraisal $ 3,500 7,000 Title Work $ 2,550 4,000 Closing costs $ 1,000 4,500 Environmental Assessments $ 450 8,000 Design $ 0 14,000 Other Eligible Planning Costs $ 017,000 c.)Site Improvements: $ 17,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 5,389,044 a.) Acquisition Expenses $ 220,500 5,374,044 Fee Simple $ 220,500 5,374,044 Easement $ 0 b.)Planning and Implementation: $ 7,500 11,500 Appraisal $ 3,500 Title Work $ 2,550 2,000 Closing costs $ 1,000 2,000 Environmental Assessments $ 450 2,000 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,525,800 a.) Acquisition Expenses $ 220,500 1,520,000 Fee Simple $ 220,500 1,520,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 5,800 Appraisal $ 3,500 2,000 Title Work $ 2,550 2,800 Closing costs $ 1,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 0 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 229,089 a.) Acquisition Expenses $ 220,500 93,000 Fee Simple $ 220,500 93,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 2,581 Appraisal $ 3,500 2,250 Title Work $ 2,550 125 Closing costs $ 1,000 206 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 00 c.)Site Improvements: $ 133,508

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 39,889 a.) Acquisition Expenses $ 220,500 32,489 Fee Simple $ 220,500 32,489 Easement $ 0 b.)Planning and Implementation: $ 7,500 7,400 Appraisal $ 3,500 2,500 Title Work $ 2,550 1,200 Closing costs $ 1,000 400 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,300

Appears in 1 contract

Samples: Project Grant Agreement

AutoNDA by SimpleDocs

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 444,000 a.) Acquisition Expenses $ 220,500 430,000 Fee Simple $ 220,500 430,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 8,000 Appraisal $ 3,500 3,850 Title Work $ 2,550 350 Closing costs $ 1,000 2,000 Environmental Assessments $ 450 1,800 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 6,000 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 345,340 a.) Acquisition Expenses $ 220,500 320,000 Fee Simple $ 220,500 320,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 25,340 Appraisal $ 3,500 9,000 Title Work $ 2,550 1,000 Closing costs $ 1,000 6,000 Environmental Assessments $ 450 6,340 Design $ 0 3,000 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,016,700 a.) Acquisition Expenses $ 220,500 990,700 Fee Simple $ 220,500 990,700 Easement $ 0 b.)Planning and Implementation: $ 7,500 21,500 Appraisal $ 3,500 6,500 Title Work $ 2,550 8,000 Closing costs $ 1,000 2,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 05,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 37,178 a.) Acquisition Expenses $ 220,500 30,000 Fee Simple $ 220,500 30,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 6,000 Appraisal $ 3,500 2,500 Title Work $ 2,550 400 Closing costs $ 1,000 900 Environmental Assessments $ 450 2,200 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 2,129,002 a.) Acquisition Expenses $ 220,500 1,847,613 Fee Simple $ 220,500 1,847,613 Easement $ 0 b.)Planning and Implementation: $ 7,500 41,242 Appraisal $ 3,500 3,000 Title Work $ 2,550 1,100 Closing costs $ 1,000 1,250 Environmental Assessments $ 450 20,500 Design $ 0 Other Eligible Planning Costs $ 015,392

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 144,543 a.) Acquisition Expenses $ 220,500 126,953 Fee Simple $ 220,500 126,953 Easement $ 0 b.)Planning and Implementation: $ 7,500 17,590 Appraisal $ 3,500 Title Work $ 2,550 2,350 Closing costs $ 1,000 3,920 Environmental Assessments $ 450 1,500 Design $ 0 Other Eligible Planning Costs $ 06,320

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 107,000 a.) Acquisition Expenses $ 220,500 107,000 Fee Simple $ 220,500 60,000 Easement $ 0 b.)Planning 47,000 b.) Planning and Implementation: $ 7,500 0 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,332,121 a.) Acquisition Expenses $ 220,500 709,250 Fee Simple $ 220,500 494,250 Easement $ 0 b.)Planning 215,000 b.) Planning and Implementation: $ 7,500 90,100 Appraisal $ 3,500 39,000 Title Work $ 2,550 600 Closing costs $ 1,000 6,000 Environmental Assessments $ 450 4,500 Design $ 0 40,000 Other Eligible Planning Costs $ 00 c.)Site Improvements: $ 480,271 d.)Permits, Advertising, Legal: $ 2,500 e.)Contingencies: $ 50,000 ====================

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 572,616 a.) Acquisition Expenses $ 220,500 500,000 Fee Simple $ 220,500 500,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 14,060 Appraisal $ 3,500 Title Work $ 2,550 500 Closing costs $ 1,000 200 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 09,860

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 141,500 a.) Acquisition Expenses $ 220,500 141,500 Fee Simple $ 220,500 141,500 Easement $ 0 b.)Planning and Implementation: $ 7,500 0 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 108,596 a.) Acquisition Expenses $ 220,500 92,200 Fee Simple $ 220,500 74,300 Easement $ 0 17,900 b.)Planning and Implementation: $ 7,500 13,500 Appraisal $ 3,500 3,000 Title Work $ 2,550 4,000 Closing costs $ 1,000 1,500 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 05,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 430,100 a.) Acquisition Expenses $ 220,500 365,000 Fee Simple $ 220,500 365,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 35,900 Appraisal $ 3,500 4,100 Title Work $ 2,550 5,000 Closing costs $ 1,000 600 Environmental Assessments $ 450 1,200 Design $ 0 Other Eligible Planning Costs $ 025,000 c.)Site Improvements: $ 19,200

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,905,000 a.) Acquisition Expenses $ 220,500 1,860,000 Fee Simple $ 220,500 1,860,000 Easement $ 0 b.)Planning 0 b.) Planning and Implementation: $ 7,500 45,000 Appraisal $ 3,500 3,200 Title Work $ 2,550 9,200 Closing costs $ 1,000 13,000 Environmental Assessments $ 450 2,600 Design $ 0 Other Eligible Planning Costs $ 17,000 c.) Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 287,688 a.) Acquisition Expenses $ 220,500 268,776 Fee Simple $ 220,500 268,776 Easement $ 0 b.)Planning and Implementation: $ 7,500 7,314 Appraisal $ 3,500 1,500 Title Work $ 2,550 0 Closing costs $ 1,000 1,924 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 03,890

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 689,432 a.) Acquisition Expenses $ 220,500 625,000 Fee Simple $ 220,500 625,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 14,432 Appraisal $ 3,500 2,000 Title Work $ 2,550 6,800 Closing costs $ 1,000 Environmental Assessments $ 450 2,000 Design $ 0 Other Eligible Planning Costs $ 02,632 c.)Site Improvements: $ 30,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,872,700 a.) Acquisition Expenses $ 220,500 1,847,000 Fee Simple $ 220,500 1,847,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 22,200 Appraisal $ 3,500 7,500 Title Work $ 2,550 500 Closing costs $ 1,000 5,000 Environmental Assessments $ 450 3,100 Design $ 0 Other Eligible Planning Costs $ 6,100 c.) Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 3,384,230 a.) Acquisition Expenses $ 220,500 3,311,535 Fee Simple $ 220,500 3,311,535 Easement $ 0 b.)Planning and Implementation: $ 7,500 23,000 Appraisal $ 3,500 2,500 Title Work $ 2,550 1,000 Closing costs $ 1,000 5,000 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 14,500 c.)Site Improvements: $ 44,695 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 194,764 a.) Acquisition Expenses $ 220,500 156,639 Fee Simple $ 220,500 156,639 Easement $ 0 b.)Planning and Implementation: $ 7,500 12,200 Appraisal $ 3,500 1,500 Title Work $ 2,550 0 Closing costs $ 1,000 3,000 Environmental Assessments $ 450 1,200 Design $ 0 Other Eligible Planning Costs $ 06,500 c.)Site Improvements: $ 19,925

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 5,022,603 a.) Acquisition Expenses $ 220,500 3,744,074 Fee Simple $ 220,500 3,744,074 Easement $ 0 b.)Planning and Implementation: $ 7,500 168,000 Appraisal $ 3,500 15,000 Title Work $ 2,550 20,000 Closing costs $ 1,000 8,000 Environmental Assessments $ 450 20,000 Design $ 0 80,000 Other Eligible Planning Costs $ 025,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 114,250 a.) Acquisition Expenses $ 220,500 100,000 Fee Simple $ 220,500 100,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 11,750 Appraisal $ 3,500 3,750 Title Work $ 2,550 2,500 Closing costs $ 1,000 500 Environmental Assessments $ 450 1,500 Design $ 0 Other Eligible Planning Costs $ 3,500 c.)Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,076,405 a.) Acquisition Expenses $ 220,500 988,905 Fee Simple $ 220,500 898,905 Easement $ 0 90,000 b.)Planning and Implementation: $ 7,500 67,500 Appraisal $ 3,500 7,500 Title Work $ 2,550 0 Closing costs $ 1,000 45,000 Environmental Assessments $ 450 7,500 Design $ 0 Other Eligible Planning Costs $ 7,500 c.)Site Improvements: $ 20,000 d.)Permits, Advertising, Legal: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,205,700 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 0 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 310,992 a.) Acquisition Expenses $ 220,500 0 Fee Simple $ 220,500 0 Easement $ 0 b.)Planning and Implementation: $ 7,500 37,738 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 0 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 037,738

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 317,973 a.) Acquisition Expenses $ 220,500 310,000 Fee Simple $ 220,500 310,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 7,473 Appraisal $ 3,500 4,500 Title Work $ 2,550 500 Closing costs $ 1,000 2,123 Environmental Assessments $ 450 350 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 926,396 a.) Acquisition Expenses $ 220,500 842,000 Fee Simple $ 220,500 842,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 30,896 Appraisal $ 3,500 17,000 Title Work $ 2,550 3,628 Closing costs $ 1,000 4,268 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 06,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 22,600 a.) Acquisition Expenses $ 220,500 19,750 Fee Simple $ 220,500 19,750 Easement $ 0 b.)Planning and Implementation: $ 7,500 2,850 Appraisal $ 3,500 1,500 Title Work $ 2,550 500 Closing costs $ 1,000 700 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0150

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 274,612 a.) Acquisition Expenses $ 220,500 105,000 Fee Simple $ 220,500 105,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 13,000 Appraisal $ 3,500 4,000 Title Work $ 2,550 1,500 Closing costs $ 1,000 1,500 Environmental Assessments $ 450 3,000 Design $ 0 Other Eligible Planning Costs $ 03,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 481,450 a.) Acquisition Expenses $ 220,500 52,875 Fee Simple $ 220,500 0 Easement $ 0 52,875 b.)Planning and Implementation: $ 7,500 12,350 Appraisal $ 3,500 1,900 Title Work $ 2,550 0 Closing costs $ 1,000 3,600 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 06,850

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 75,600 a.) Acquisition Expenses $ 220,500 73,800 Fee Simple $ 220,500 73,800 Easement $ 0 b.)Planning and Implementation: $ 7,500 1,800 Appraisal $ 3,500 0 Title Work $ 2,550 0 Closing costs $ 1,000 1,400 Environmental Assessments $ 450 400 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,921,541 a.) Acquisition Expenses $ 220,500 1,466,700 Fee Simple $ 220,500 1,050,000 Easement $ 0 416,700 b.)Planning and Implementation: $ 7,500 56,168 Appraisal $ 3,500 33,000 Title Work $ 2,550 0 Closing costs $ 1,000 15,729 Environmental Assessments $ 450 7,439 Design $ 0 Other Eligible Planning Costs $ 00 c.)Site Improvements: $ 381,500 d.)Permits, Advertising, Legal: $ 17,173

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 732,774 a.) Acquisition Expenses $ 220,500 708,380 Fee Simple $ 220,500 0 Easement $ 0 708,380 b.)Planning and Implementation: $ 7,500 11,300 Appraisal $ 3,500 3,300 Title Work $ 2,550 0 Closing costs $ 1,000 2,500 Environmental Assessments $ 450 1,500 Design $ 0 Other Eligible Planning Costs $ 04,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 768,300 a.) Acquisition Expenses $ 220,500 540,000 Fee Simple $ 220,500 540,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 12,800 Appraisal $ 3,500 800 Title Work $ 2,550 0 Closing costs $ 1,000 500 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 011,500 c.)Site Improvements: $ 210,000 d.)Permits, Advertising, Legal: $ 500 e.)Contingencies: $ 5,000 ====================

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 314,750 a.) Acquisition Expenses $ 220,500 300,000 Fee Simple $ 220,500 300,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 14,750 Appraisal $ 3,500 3,750 Title Work $ 2,550 2,000 Closing costs $ 1,000 0 Environmental Assessments $ 450 9,000 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 576,985 a.) Acquisition Expenses $ 220,500 444,000 Fee Simple $ 220,500 444,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 17,220 Appraisal $ 3,500 1,900 Title Work $ 2,550 0 Closing costs $ 1,000 13,320 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 02,000

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 1,676,500 a.) Acquisition Expenses $ 220,500 1,660,000 Fee Simple $ 220,500 1,660,000 Easement $ 0 b.)Planning and Implementation: $ 7,500 16,500 Appraisal $ 3,500 4,500 Title Work $ 2,550 5,300 Closing costs $ 1,000 6,700 Environmental Assessments $ 450 0 Design $ 0 Other Eligible Planning Costs $ 0 c.)Site Improvements: $ 0

Appears in 1 contract

Samples: Project Grant Agreement

PROJECT FINANCING AND EXPENSES SCHEME. The Recipient further designates the Project's estimated financial resources and estimated costs certified to the OPWC under this Agreement for the Project as defined and described in Appendix A of this Agreement to consist of the following components: 1.1 PROJECT ESTIMATED COSTS: Total dollars $ 234,950 123,201 a.) Acquisition Expenses $ 220,500 101,160 Fee Simple $ 220,500 64,460 Easement $ 0 36,700 b.)Planning and Implementation: $ 7,500 15,578 Appraisal $ 3,500 4,500 Title Work $ 2,550 1,328 Closing costs $ 1,000 1,250 Environmental Assessments $ 450 8,500 Design $ 0 Other Eligible Planning Costs $ 0

Appears in 1 contract

Samples: Project Grant Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!