Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment B, Project Budget, (Attachment B) which is attached to and made a part of this Agreement. A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project. B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission. C. Attachment B shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs. D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis. E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage funding, the Local Government shall only in those instances be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B to be paid by the Local Government. F. The budget in Attachment B will clearly state all items subject to fixed price funding, specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State. G. When the Local Government bears the responsibility for paying cost overruns , the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being due. H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government. I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost. J. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement. K. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project. L. The State will not pay interest on any funds provided by the Local Government. M. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project. N. If the Local Government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments. O. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, in a form and containing all items required by the State, no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs. P. Upon completion of the Project, the State will perform a final accounting of the Project costs for all items of work with specified percentage funding. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party. Q. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. R. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 2 contracts
Samples: Advance Funding Agreement, Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $438,048 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 2 contracts
Samples: Advance Funding Agreement, Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 2 contracts
Samples: Advance Funding Agreement, Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $2,812,180 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the AFA-AFA_NonFed_LongGen Rev. 11/20/2017 DocuSign Envelope ID: D6380878-8E75-4C22-B8A3-F1C916410510 DocuSign Envelope ID: 94DB315D-2075-44AB-B623-3F1AE3611A58 Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas AFA-AFA_NonFed_LongGen Rev. 11/20/2017 DocuSign Envelope ID: D6380878-8E75-4C22-B8A3-F1C916410510 DocuSign Envelope ID: 94DB315D-2075-44AB-B623-3F1AE3611A58 Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 2 contracts
Samples: Advance Funding Agreement, Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage funding, the Local Government shall only in those instances be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B C and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The budget in Attachment B C will clearly state all items subject to fixed price funding, specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being due.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. C. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. The State will not pay interest on any funds provided by the Local Government.
M. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. If the Local Government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, in a form and containing all items required by the State, no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. Upon completion of the Project, the State will perform a final accounting of the Project costs for all items of work with specified percentage funding. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 2 contracts
Samples: Advance Funding Agreement, Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment B, Project Budget, (Attachment B) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage funding, the Local Government shall only in those instances be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B to be paid by the Local Government.
F. The budget in Attachment B will clearly state all items subject to fixed price funding, specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being due.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior X. Xxxxx to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. The State will not pay interest on any funds provided by the Local Government.
M. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. If the Local Government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, in a form and containing all items required by the State, no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. Upon completion of the Project, the State will perform a final accounting of the Project costs for all items of work with specified percentage funding. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $1,111,333 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior X. Xxxxx to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $1,902,225 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $1,111,333 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and AFA NonFed LongGen Rev. 11/20/2017 DocuSign Envelope ID: 95CA36C1-67D2-4B52-8303-B61A3546E16D design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior X. Xxxxx to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form AFA NonFed LongGen Rev. 11/20/2017 DocuSign Envelope ID: 95CA36C1-67D2-4B52-8303-B61A3546E16D and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment BC-1, Project Budget, (Attachment B) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is $1,902,225 as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include AFA-AFA_NonFed_LongGen Rev. 11/20/2017 DocuSign Envelope ID: 5762DFF2-1EAD-44D4-A046-6FA3FB79AD1B but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior X. Xxxxx to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.. AFA-AFA_NonFed_LongGen Rev. 11/20/2017 DocuSign Envelope ID: 5762DFF2-1EAD-44D4-A046-6FA3FB79AD1B
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment B, Project Budget, (Attachment B) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage funding, the Local Government shall only in those instances be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B to be paid by the Local Government.
F. The budget in Attachment B will clearly state all items subject to fixed price funding, specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When the Local Government bears the responsibility for paying cost overruns , the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being due.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. The State will not pay interest on any funds provided by the Local Government.
M. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. If the Local Government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, in a form and containing all items required by the State, no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. Upon completion of the Project, the State will perform a final accounting of the Project costs for all items of work with specified percentage funding. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is as shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage fundingWhere Special Approval has been granted by the State under 43 TAC §15.52, the Local Government shall only in those instances that instance be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The If the Project has been approved for a specified percentage or a periodic payment non- standard funding or payment arrangement under 43 TAC §15.52, the budget in Attachment B C will clearly state all items subject to fixed price funding, the specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When Special Approval has been granted by the State so that the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being duethose amounts.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior X. Xxxxx to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. I. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
K. J. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. K. The State will not pay interest on any funds provided by the Local Government.
M. L. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. M. If the Local Government government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. N. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, invoice in a form and containing all items required by the State, State no more frequently than monthly monthly, and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. O. Upon completion of the Project, where Special Approval has been granted by the State under 43 TAC 15.52, the State will perform a final accounting of the Project costs for all items of work with specified percentage fundingcosts. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. P. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Q. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement
Project Sources and Uses of Funds. The total estimated cost of the Project is shown in Attachment BC, Project Budget, (Attachment BC) which is attached to and made a part of this Agreement.
A. If the Local Government will perform any work under this Agreement for which reimbursement will be provided by or through the State, the Local Government must complete training. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled “Local Government Project Procedures and Qualification for the Texas Department of Transportation” and retains qualification in accordance with applicable TxDOT procedures. Upon request, the Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not continuously designated in writing a qualified individual to work actively on or to directly oversee the Project.
B. The expected cash contributions from the State, the Local Government, or other parties are shown in Attachment B. C. The State will pay for only those Project costs that have been approved by the Texas Transportation Commission.
C. Attachment B C shows, by major cost categories, the cost estimates and the party responsible for performing the work for each category. These categories may include but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other local project costs.
D. The State will be responsible for securing the State share of the funding required for the development and construction of the local Project. If the Local Government is due funds for expenses incurred, these funds will be reimbursed to the Local Government on a cost basis.
E. The Local Government will be responsible for all non-State participation costs associated with the Project, unless otherwise provided for in this Agreement or approved otherwise in an amendment to this Agreement. For items of work subject to specified percentage funding, the Local Government shall only in those instances be responsible for all Project costs that are greater than the maximum State participation specified in Attachment B C and for overruns in excess of the amount specified in Attachment B C to be paid by the Local Government.
F. The budget in Attachment B C will clearly state all items subject to fixed price funding, specified percentage funding or the periodic payment schedule, when periodic payments have been approved by the State.
G. When the Local Government bears the responsibility for paying cost overruns overruns, the Local Government shall make payment to the State within thirty (30) days from the receipt of the State’s written notification of additional funds being due.
H. When fixed price funding is used, the Local Government is responsible for the fixed price amount specified in Attachment B. C. Fixed prices are not subject to adjustment unless (1) differing site conditions are encountered; (2) further definition of the Local Government’s requested scope of work identifies greatly differing costs from those estimated; (3) work requested by the Local Government is determined to be ineligible for federal participation; or (4) the adjustment is mutually agreed to by the State and the Local Government.
I. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment B. C. At a minimum, this amount shall equal the Local Government’s funding share for the estimated cost of preliminary engineering performed or reviewed by the State for the Project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State’s estimated construction oversight and construction cost.
J. The State will not execute the contract for the construction of the Project until the required funding has been made available by the Local Government in accordance with this Agreement.
. K. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Finance Division. The funds shall be deposited and managed by the State and may only be applied by the State to the Project.
L. The State will not pay interest on any funds provided by the Local Government.
M. If a waiver for the collection of indirect costs for a service project has been granted under 43 TAC §15.56, the State will not charge the Local Government for the indirect costs the State incurs on the local Project, unless this Agreement is terminated at the request of the Local Government prior to completion of the Project.
N. If the Local Government is an Economically Disadvantaged County (EDC) and if the State has approved adjustments to the standard financing arrangement, this Agreement reflects those adjustments.
O. Where the Local Government is authorized to perform services under this Agreement and be reimbursed by the State, the Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice, in a form and containing all items required by the State, no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred the State may refuse to reimburse the Local Government for those costs.
P. Upon completion of the Project, the State will perform a final accounting of the Project costs for all items of work with specified percentage funding. Any funds due by the Local Government or the State for these work items will be promptly paid by the owing party.
Q. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this Agreement or indirectly through a subcontract under this Agreement. Acceptance of funds directly under this Agreement or indirectly through a subcontract under this Agreement acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit.
R. Payment under this Agreement beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this Agreement shall be terminated immediately with no liability to either party.
Appears in 1 contract
Samples: Advance Funding Agreement