PROPOSAL DELIVERABLES Sample Clauses

PROPOSAL DELIVERABLES. EPC Contractor shall provide six (6) original copies in hard copy and one electronic copy of the Lump Sum Proposal along with as a minimum the following materials as support: 1. P&ID’s 2. General Electrical One Lines 3. General Arrangements (Plans & Sections) 4. Labor Survey 5. Level 1 Schedule 6. Equipment List and Quotes 7. Site visit report 8. Price breakdown 9. Basis of Estimate - Methodology The above referenced materials to be generated utilizing Delta-T’s Schedule “A” Design Package PDA 2, site specific package, to be provided by Northern Ethanol pursuant to contract with Delta-T. “Mechanical Completion” of the Plant will occur when each of the following conditions have been met with respect to the Plant equipment: (i) EPC Contractor has completed the construction of the Plant in accordance with the EPC Contract, excepting only minor items that do not materially affect the mechanical, electrical, or structural integrity of the Plant or the safe, reliable and efficient operation of the Plant equipment for its intended purpose; including, without limitation: (1) the setting of the Plant equipment on foundations; (2) the inter-connection of all Plant equipment as required by way of piping, wiring, controls, and safety systems; and (3) ensuring that: (A) all Plant equipment related to its related operating systems are individually cleaned, leak checked, and lubricated; (B) all Equipment is checked out; (C) all ground checks are made; (D) all piping supplied by EPC Contractor is tested and flushed clean as required by Applicable Legal Requirements and flushed; (E) the switchyards are complete; (F) all electrical circuits have been point-to-point checked to verify that such Equipment and operating systems have been correctly installed so as to respond to simulated test signals equivalent to actual signals received during operation; provided that such obligation shall not extend to electrical circuits after the termination points to any Owner-furnished equipment or other equipment not free issued to the EPC Contractor; (G) the Equipment can reasonably be expected to operate without damage to the Plant, Sarnia Hydro Distribution’s power grid, the City of Sarnia’s water and sewage system: (H) the Plant is ready for start-up and initial process equipment testing; (I) all of the Facilities necessary for the safe operation of the Plant have been completed and are ready for initial operation; and (J) training of Owner’s personnel has commenced and all draft or f...