Rate During Repair Sample Clauses

Rate During Repair. Except during Turnkey operations, the Repair Rate specified in the Drilling Order will be payable during the first twenty-four (24) hours per month during which operations are suspended to permit necessary replacement, inspection, repair of maintenance of Contractor’s Items. Routine maintenance such as lubrication, packing of swivels, changing of pump parts, slipping lines, drill string and certification inspections, shall not be considered as maintenance for purposes of this Paragraph. Contractor will use due diligence in effecting such repairs, replacements or maintenance in a good and workmanlike manner and will use its best efforts to familiarize itself with the location of rental replacements for Contractor’s Items.
AutoNDA by SimpleDocs
Rate During Repair. The Repair Rate specified in Appendix A will be payable for any period in excess of the repair time specified in Appendix A per occurrence during which operations are suspended to permit necessary replacement or repair of Contractor’s Items, except as provided in Paragraphs 605 and 707. Suspensions for routine maintenance and inspections, such as lubrication, packing of swivels, changing of pump parts, slipping lines, servicing the top-drive, testing BOP equipment, drill string inspections and any certification inspections, or to repair or replace Contractor's Items damaged or lost by Operator or its other contractors and subcontractors shall not be considered repair time for purposes of this Paragraph.
Rate During Repair. The Repair Rate specified in Appendix A will be payable for any period in excess of the repair time specified in Appendix A per occurrence during which operations are suspended to permit necessary replacement or repair of Contractor’s Items, except as provided in Paragraphs 605, 705 and 707. Suspensions for routine maintenance and inspections, such as lubrication, packing of swivels, changing of pump parts, slipping and cutting the drilling line, servicing the top-drive, testing BOP equipment, drill string inspections and any certification inspections, shall not be considered repair time for purposes of this Paragraph.
Rate During Repair. The Repair Rate specified in Appendix A will be payable for any daywork operations period in excess of the period specified in Appendix A per occurrence during which operations are suspended to permit necessary replacement, inspection, repair, or maintenance of Contractor's Items. Routine maintenance such as lubrication, packing of swivels, changing of pump parts, slipping lines, drill string inspections and certification inspections, shall not be considered as maintenance for purposes of this Paragraph.
Rate During Repair. The Repair Rate specified in Appendix A will be payable during the first twenty-four (24) hours per month during which operations are suspended to permit necessary replacement, inspection, repair of maintenance of Contractor's Items. Routine maintenance such as lubrication, packing of swivels, changing of pump parts, slipping lines, drill string and certification inspections, shall not be considered as maintenance for purposes of this Paragraph 7.5. Contractor will use due diligence in effecting such repairs, replacements or maintenance in a good and workmanlike manner and will use its best efforts to familiarize itself with the location of rentable replacements for Contractor's Items.
Rate During Repair. The Repair Rate of zero ($0) will be payable for any period in excess of the period specified in Appendix A per occurrence during which operations are suspended as a result of Contractor’s failure to provide its Personnel as provided in Appendix C or Paragraph 303. The Repair Rate of zero ($0) will be payable for any period in excess of the periods specified in Appendix A per occurrence during which operations are suspended as a result of breakdown or failure of Contractor’s Items or to permit necessary replacement, inspection (including certification inspections), repair or maintenance of Contractor’s Items, except as otherwise provided in Paragraphs 606, 707, 901(a), 901(b), and 901(c). Routine maintenance such as lubrication, packing of swivels, changing of pump parts, servicing top drive or slipping lines shall not be considered as Repair for purposes of this Paragraph; provided, however, that Contractor shall be limited to twenty-four (24) cumulative hours of routine maintenance per month, after which the Repair Rate of zero ($0) shall apply. If the dayrate has been reduced to zero ($0) for a period of sixty (60) consecutive days, either party may terminate the Contract; provided, however, that Operator may prevent such termination by paying the Force Majeure Rate. If operations are suspended as a result of breakdown or failure of Contractor’s Items to permit replacement, inspection, repair or maintenance of Contractor’s subsea equipment, the repair period shall commence and the Repair Rate of zero ($0) shall apply immediately upon such suspension of operations and shall cease when the BOP stack/LMRP has been rerun, latched, successfully tested and the BOP/LMRP test plug has been pulled to the surface.
Time is Money Join Law Insider Premium to draft better contracts faster.