Reduced Vertical Separation Minimum Sample Clauses

Reduced Vertical Separation Minimum. A vertical separation minimum of 300 m (1 000 ft) which is applied between FL 290 and FL 410 inclusive, on the basis of regional air navigation agreements and in accordance with conditions specified therein.
AutoNDA by SimpleDocs
Reduced Vertical Separation Minimum. (RVSM). A vertical separation minimum of 300 m (1 000 ft) which is applied between FL 290 and FL 410 inclusive, on the basis of regional air navigation agreements and in accordance with conditions specified therein.
Reduced Vertical Separation Minimum. (RVSM) A vertical separation minimum of 300m (1,000ft) which is applied between FL 290 and FL410 inclusive, on the basis the regional air navigation agreements and accordance with conditions specified therein. LoA Between Ho Chi Minh ACC and Sanya ACC 30 February 2021 A1.3. Flight Level Allocation Scheme (FLAS) for Western and Pacific / South China Sea In 2002, the States of the ICAO Asia/Pacific Region within the Western Pacific/South China Sea (WPAC/SCS) area implemented RVSM operations for ATC flight level assignment using a modified single alternate flight level orientation scheme (FLOS), with a complementary flight level allocation scheme (FLAS). To facilitate traffic handling, a ‘no pre-departure coordination’ procedure was agreed between affected ATC Area Control Centers (ACCs). The initial flight level for departing flights is allocated in accordance with the pre-agreed FLAS without the need for real time flight level coordination between adjacent ACCs. After departure, other flight levels may be available subject to coordination between ACCs. However, the implementation of RVSM in surrounding areas utilizing a single alternate FLOS system has resulted in a need to continuously transition the levels of flights entering and leaving the WPAC/SCS area between the modified single alternate FLOS in the WPAC/SCS area and the single alternate FLOS in surrounding RVSM areas. A single alternate FLOS (i.e. ‘eastbound - odd flight levels, westbound - even flight levels’) in compliance with the Table “RVSM-FEET” of Appendix 3 of ICAO Annex 2 and in accordance with the FLOS in surrounding areas Special high capacity arrangements for six unidirectional parallel routes (L642, M771, N892, L625, N884 & M767) that involve managed use of odd and even flight levels in the same direction of flight and an associated FLAS agreed between affected ACCs to facilitate ATC ‘no pre-departure coordination’ operations. LoA Between Ho Chi Minh ACC and Sanya ACC 30 February 2021 APPENDIX 1 TO ANNEX B| SECTORISATION In each case, sectors to the right assume control of sectors to the left in the event they are offline. Ho Chi Minh ACC Sectors: 1 (All levels) VVHM_1_CTR VVHM_A_CTR VVHM_CTR VCL_CTR ASEA_FSS 134.050 123.525 135.350 129.425 135.350 Ho Chi Minh ACC Sectors: 5 (All levels) VVHM_5_CTR VVHM_A_CTR VVHM_CTR VCL_CTR 120.700 123.525 135.350 129.425 Sanya ACC Sector*: (All levels) ZJSA_2_CTR ZJSA_CTR PRC_FSS 133.200 120.500 133.075 *The frequencies are subject to change in the a...

Related to Reduced Vertical Separation Minimum

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.

  • Safety Footwear Allowance Effective 1/1/07, the Contra Costa Community College District will provide an initial two pairs of safety/protective work boots or shoes for employees in the following classifications: Building Maintenance Worker, Equipment Maintenance Worker, Senior Equipment Maintenance Worker, Maintenance Mechanic, Lead Maintenance Mechanic, Maintenance Assistant, Ground Worker / Gardener I, II, Senior or Lead, Shipping and Receiving Clerk, and all other mutually agreed upon classifications required to wear safety; protective shoes per OSHA/ASTM standards.

  • Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.

  • Career Ladder Effective July 1, 2014, TALC and the District agreed to the 11 implementation of a Career Ladder for the advancement of instructional staff on the 12 Performance Salary Schedule. Elements of the Career Ladder are outlined and posted on 13 the District website and include detailed descriptions of Career Ladder levels and the 14 requirements for movement. All instructional staff hired on or after January 8, 2018 will 15 be placed on the Apprentice level of the Career Ladder.

  • CLASS SIZE/STAFFING LEVELS The board will make every effort to limit FDK/Grade 1 split grades where feasible. APPENDIX A – RETIREMENT GRATUITIES

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Incremental Progression Three (3) Year Trained Teacher - Professional Development

Time is Money Join Law Insider Premium to draft better contracts faster.