Reference Design Sample Clauses

Reference Design. The Consultants shall note that the results of ground investigation and laboratory testing may not be available in time for the Consultants to carry out their design work. The Consultants shall exercise their professional judgment with reference to existing geological and ground investigation information, ground conditions and geology to be adopted for the purpose of design work. The Consultants shall review their assumptions when ground investigation and laboratory testing results are available and review and refine their design works in this and subsequent Phases of this Assignment. Having regard to the reviews and assessments of all relevant factors including the planning, land, environmental, technical, utilities and operational aspects, the Consultants shall identify and determine the key constraints, challenges, requirements, elements, components and equipment required for the Project including any related ancillary or supporting facilities. The Consultants shall identify and evaluate different equipment of crushing domestic food waste, identify and evaluate different options of arrangements and layout of facilities within the Site and recommend the pre-treatment capacity and the preferred layout, taking into account the applicable constraints and all other relevant factors identified in the reviews and assessments. The Consultants shall develop and prepare a Reference Design for the Project. The design shall provide justifications and define appropriate designs, functional and performance/control criteria and constraints for the Project, including those for all the major elements, components, equipment and facilities. It shall provide sufficient information and details for confirming the engineering feasibility of the Project. The Reference Design shall be flexible enough so that a wide range of tenderers and technology suppliers would be able to submit a conforming tender that could meet all the tender requirements. The Consultants shall specify key elements/ inventories of the Project in order to comply with the required functional, technical, operational and environmental performances. The key elements of the Project shall include, but not limited to, provision for food waste reception, storage, handling and feeding; domestic food waste processing and pre-treatment and delivery of domestic food waste to designated anaerobic digesters at the Sha Tin STW; emission control devices; site administration facilities; utilities services; waste disposal a...
AutoNDA by SimpleDocs
Reference Design. The Consultants shall note that the results of ground investigation and laboratory testing may not be available in time for the Consultants to carry out their design work. The Consultants shall exercise their professional judgment with reference to existing geological and ground investigation information, ground conditions and geology to be adopted for the purpose of design work. The Consultants shall review their assumptions when ground investigation and laboratory testing results are available and review and refine their design works in this and subsequent Phases of this Assignment.
Reference Design. 8.2.1 RP shall at its own risk develop and deliver the Reference Designs to the JV, license the Reference Designs Background IP and transfer Reference Designs Transferred IP (as both defined in the Technology Agreement) to the JV in accordance with agreed deliverables criteria, timing, target specifications and other conditions as agreed between RP and HT and set forth in Technology Agreement. 8.2.2 RP shall not: (i) perform Reference Design for products that are same or in Competition with the Finished Products for any third parties in the Territory; or (ii) license or transfer or make available the Reference Design and/or the relevant intellectual property rights in relation to the Finished Products to any third parties in the Territory. (obligations under this Article 8.2 collectively “RP Reference Design Obligations”)
Reference Design. M-1 Reference Design, already provided to Sharp.
Reference Design 

Related to Reference Design

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Server Software Subject to the terms and conditions of this XXXX, Vocera grants you the non-exclusive right to (i) install and run (“Use”) the Server Software on computer systems (each, a “Server Computer”) located at End User’s Facilities in the geographic territory designated above (“Territory”); (ii) to Use the Client Software in conjunction with Authorized Client Devices and such Server Computers; and (iii) for pilot licenses for certain Software provided on a trial basis, use such Software for the limited term specified by Vocera in writing. You may Use the standard Server Software on one primary Server Computer (or a primary cluster of computers suitably configured for productive use of the Server Software). You may install backup copies of the Server Software on backup Server Computers to provide redundancy in the event of failure of the primary Server Computer(s) but, unless you have acquired additional licenses or a failover license from Vocera, you may not run such backup or additional copies concurrently with the primary copies. Vocera grants you the right to use the applicable License Key issued by Vocera only to enable Use of the Server Software in conjunction with the licensed Server Computers. Server Software may be licensed for a Subscription Term as specified in the Quote.

  • Alternative Work Schedules Employees may request alternative work schedules such as a nine (9) day - 80 hour two week schedule or a four (4) day - 40 hour week schedule. Management will respond to an employee's request within 15 calendar days. Any changes from existing work schedules will be based on the needs of the service as determined by Management. Employees covered by the Fair Labor Standards Act will not be placed on alternate work schedules that mandate the payment of overtime under the Act.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). 2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance. 2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Telepak Networks. 2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Telepak Networks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Telepak Networks or BellSouth provides ninety

  • Software Updates XXXXX agrees to keep current with software licensed from Skyward and will install new versions on a timeline approved by XXXXX governance. This timeline will be communicated by NWRDC to the Districts.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • XXX Hosting 10.1 XXX Hosting is not required for resale in the BellSouth region.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (“DAMLs”), and may have up to 6,000 feet of bridged tap between the end user’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For loops less than 18,000 feet and with less than 1300 Ohms resistance, the loop will provide a voice grade transmission channel suitable for loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Make Up process is not required to order and provision the UCL-ND. However, Lightyear can request Loop Make Up for which additional charges would apply. 2.4.3.3 At an additional charge, BellSouth also will make available Loop Testing so that Lightyear may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit B of this Attachment. 2.4.3.4 UCL-ND loops are not intended to support any particular service and may be utilized by Lightyear to provide a wide-range of telecommunications services so long as those services do not adversely affect BellSouth’s network. The UCL-ND will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the loop to the customer’s inside wire. 2.4.3.5 Order Coordination (OC) will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. Order Coordination -Time Specific (OC-TS) does not apply to this product. 2.4.3.6 Lightyear may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove bridge tap and/or load coils from any loop within the BellSouth network. Therefore, some loops that would not qualify as UCL-ND could be transformed into loops that do qualify, using the ULM process.