Removal of Surplus Plant and Equipment. When ordered by the Engineer, the Contractor shall be required to promptly move from any location within the Contract area all such items of plant and equipment determined to be no longer necessary for the effective prosecution of the Work at such point, to other locations to be designated by the Engineer. If, in the opinion of the Engineer, plant and equipment are no longer required on any portion of the Work, they shall be removed from the site when so ordered.
Appears in 5 contracts
Samples: a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov
Removal of Surplus Plant and Equipment. When ordered by the Engineer, the Contractor shall be required to promptly move from any location within the Contract contract area all such items of plant and equipment determined to be no longer necessary for the effective prosecution of the Work work at such point, to other locations to be designated by the Engineer. If, in the opinion of the Engineer, plant and equipment are no longer required on any portion of the Workwork, they shall be removed from the site when so ordered.
Appears in 1 contract
Samples: a856-cityrecord.nyc.gov