Responsibility for electrical operation/Operation Sample Clauses

Responsibility for electrical operation/Operation management Responsible for the electrical operation on the Norwegian side is Statnett, while on the Finnish side it is Fingrid. The power operation responsibility boundary lies at the border between Finland and Norway.
AutoNDA by SimpleDocs

Related to Responsibility for electrical operation/Operation

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

  • Commercial Operation (i) On or before December 31, 2021, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.

  • Initial Operation The following requirements shall be satisfied prior to Initial Operation of the Customer Facility:

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Responsibility for Equipment City shall not be responsible for any damage to persons or property as a result of the use, misuse or failure of any equipment used by Contractor, or by any of its employees, even though such equipment be furnished, rented or loaned to Contractor by City.

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • Cost Responsibility for Network Upgrades 9 5.1 Applicability 9 5.2 Network Upgrades 9

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • SERVICES AND RESPONSIBILITIES 2.1 Contractor hereby agrees to perform the services described and for the fee set forth in the Scope of Work. The Contractor shall be solely responsible for the satisfactory and complete execution of the Scope Work. The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Scope of Work. The Scope of Work shall generally be performed at the direction of the NMCRA and completed and completed within that certain number of days from the issuance of a Work Order by the NMCRA to the Contractor (the “Term”). Time is of the essence in the performance of all obligations within the Term. Final Completion of the Scope of Work shall be completed prior to the expiration of the Term and the failure of the Contractor to do so shall be a material default under this Agreement. “

  • Maintenance Responsibilities 42. Agency shall, at its own expense, maintain operate, and provide power as needed upon Project completion at a minimum level that is consistent with normal depreciation and/or service demand and throughout the useful life of the Project. The useful life of the Project is defined in the Special Provisions. State may conduct periodic inspections during the life of the Project to verify that the Project is properly maintained and continues to serve the purpose for which federal funds were provided. Maintenance and power responsibilities shall survive any termination of the Project Agreement. In the event the Project will include or affect a state highway, this provision does not address maintenance of that state highway.