Responsibility Tables Sample Clauses

POPULAR SAMPLE Copied 1 times
Responsibility Tables. The following tables summarise the responsibilities of the contractors for all critical interface areas. Date Doc. N°. Page 4 UMBILICAL S S S IC V 7 HANG-OFF STRUCTURAL SUPPORT V 8 BEND STIFFENER S S S IC — Legend: V S F D Co IC FPSO Vessel Contractor Subsea Contractor Flowline Contractor Drilling Contractor Company Installation Contractor E P C I H/C Engineering Procurement Construction/Fabrication Installation Hook-up & Commissioning Date Doc. N°. Page 1 TOPSIDES PIPING V V V V V 3 RISER END FITTING F F F IC — 4 HANG OFF ASSEMBLY F F F IC — 6 BEND STIFFENER F F F IC — 8 FLEXIBLE RISER F F F IC V Legend: V S F D Co IC FPSO Vessel Contractor Subsea Contractor Flowline Contractor Drilling Contractor Company Installation Contractor E P C I H/C Engineering Procurement Construction/Fabrication Installation Hook-up & Commissioning Date Doc. N°. Page 1 ELECTRICAL FLYING LEAD S S S IC V 2 HYDRAULIC FLYING LEAD S S S IC V 3 UMBILICAL IUTA S S S IC V
Responsibility Tables. The following tables summarise the responsibilities of the contractors for all critical interface areas. C Issued for Internal Review GBB 28 Jan 14 B Issued for Internal Review GBB 27 Jan 14 A Issued for Internal Review GBB 23 Jan 14 Rev REASON FOR ISSUE Prepared VERIFIED APPROVED Date This document is property of Allied Energy. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent Date Doc. N°. Page 28 Jan 2014 OYO2-FPSO-SOW-0001 75 of 85 Table A: Subsea Control Umbilical – FPSO Battery Limits No. Item E P C I H/C 1 TOPSIDES CABLING (POWER AND COMMUNICATIONS) V V V V V 2 TOPSIDES PIPING (INSTRUMENTS) V V V V V 3 TUTU S S S V V 4 UMBILICAL S S S IC V 5 UMBILICAL HANG-OFF ASSEMBLY S S S IC — 6 HANG-OFF BEAM V V V V — 7 HANG-OFF STRUCTURAL SUPPORT V