Right of Way The Site
Special/temporary right of way The Contractor shall bear all costs and charges for any special or temporary right of way required by it in connection with access to the Site. The Contractor shall obtain at its cost such facilities on or outside the Site as may be required by it for the purposes of the Project Highway and the performance of its obligations under this Agreement.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Dark Fiber 8.1 Access to unbundled Dark Fiber will be provided by Verizon, where existing facilities are available at the requested availability date, in the loop, subloop and interoffice facilities (IOF) portions of the Company's network. Access to Dark Fiber will be provided in accordance with, but only to the extent required by, Applicable Law. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offering. 8.2 A “Dark Fiber Loop” consists of continuous fiber optic strand(s) in a Verizon fiber optic cable between the fiber distribution frame, or its functional equivalent, located within a Verizon Wire Center, and Verizon’s main termination point, such as the fiber patch panel located within a Customer premise, and that has not been activated through connection to the electronics that “light” it, and thereby render it capable of carrying Telecommunications Services. In addition to the other terms and conditions of this Agreement, the following terms and conditions also shall apply to Dark Fiber Loops: 8.2.1 Verizon shall be required to provide a Dark Fiber Loop only where (1) one end of the Dark Fiber Loop terminates at Z-Tel's collocation arrangement and (2) the other end terminates at the Customer premise. A CLEC demarcation point shall be established either in the main telco room of a building where a Customer is located or, if the building does not have a main telco room, then at a location to be determined by Verizon. Verizon shall connect a Dark Fiber Loop to the demarcation point by installing a fiber jumper. 8.2.2 Z-Tel may access a Dark Fiber Loop only at a pre-existing hard termination point of such Dark Fiber Loop, and Z-Tel may not access a Dark Fiber Loop at any other point, including, but not limited to, a splice point. Verizon will not introduce additional splice points or open existing splice points to accommodate a CLEC’s request. Unused fibers located in a cable vault or a controlled environment vault, manhole or other location outside the Verizon Wire Center, and not terminated to a fiber patch, are not available to Z-Tel. 8.2.3 A strand shall not be deemed to be continuous if splicing is required to provide fiber continuity between two locations. Dark Fiber will only be offered on a route-direct basis where facilities exist (i.e., no intermediate offices). 8.2.4 Verizon shall perform all work necessary to install a cross connection or a fiber jumper, including, but not limited to, the work necessary to connect a dark fiber to a demarcation point, a fiber distribution frame or a POT bay. 8.2.5 At the Customer premise, unused fibers are not available to Z-Tel pursuant to this Attachment unless such fibers terminate on a fiber patch panel. Unused fibers in a fiber splice point located outside the Customer premise are not available to Z-Tel. 8.2.6 Dark Fiber will be offered to Z-Tel in the condition that it is available in Verizon's network at the time that Z-Tel submits its request (i.e., "as is"). In addition, Verizon shall not be required to convert lit fiber to Dark Fiber for Z-Tel's use. 8.2.7 Spare wavelengths on fiber strands, where Wave Division Multiplexing (WDM) or Dense Wave Division Multiplexing (DWDM) equipment is deployed, are not considered to be spare Dark Fiber Loops and, therefore, will not be offered to Z-Tel as Dark Fiber. 8.2.8 Z-Tel shall be responsible for providing all transmission, terminating and regeneration equipment necessary to light and use Dark Fiber. 8.2.9 Z-Tel may not resell Dark Fiber purchased pursuant to this Attachment to third parties. 8.2.10 In order for Verizon to continue to satisfy its carrier of last resort (COLR) obligations under Applicable Law and/or to preserve the efficiency of its network, Verizon will limit Z-Tel to leasing a maximum of twenty-five percent (25%) of the Dark Fiber in any given segment of Verizon's network during any two-year period. In addition, except as otherwise required by Applicable Law, Verizon may take any of the following actions, notwithstanding anything to the contrary in this Agreement: 8.2.10.1 Revoke Dark Fiber leased to Z-Tel upon a showing of need to the Commission and twelve (12) months' advance written notice to Z-Tel; and 8.2.10.2 Revoke Dark Fiber leased to Z-Tel upon a showing to the Commission that Z-Tel underutilized fiber (less than OC-12) within any twelve (12) month period. 8.2.10.3 Verizon may reserve Dark Fiber for maintenance purposes, or to satisfy Customer orders for fiber related services or for future growth. Verizon reserves and shall not waive, Verizon’s right to claim before the Commission that Verizon should not have to fulfill a Z-Tel order for Dark Fiber because that request would strand an unreasonable amount of fiber capacity, disrupt or degrade service to Customers or carriers other than Z-Tel, or impair a Verizon obligation to serve as a carrier of last resort. 8.2.11 Z-Tel may not reserve Dark Fiber.
Rights-of-Way Each of the Partnership Entities has such consents, easements, rights-of-way or licenses from any person (“rights-of-way”) as are necessary to conduct its business in the manner described in the Pricing Disclosure Package and the Prospectus, subject to such qualifications as may be set forth in the Pricing Disclosure Package and the Prospectus and except for such rights-of-way the failure of which to have obtained would not have, individually or in the aggregate, a Material Adverse Effect; each of the Partnership Entities has fulfilled and performed all its material obligations with respect to such rights-of-way and no event has occurred which allows, or after notice or lapse of time would allow, revocation or termination thereof or would result in any impairment of the rights of the holder of any such rights-of-way, except for such revocations, terminations and impairments that will not have a Material Adverse Effect, subject in each case to such qualification as may be set forth in the Pricing Disclosure Package and the Prospectus; and, except as described in the Pricing Disclosure Package and the Prospectus, none of such rights-of-way contains any restriction that is materially burdensome to the Partnership Entities, taken as a whole.
Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:
Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)
Parking Spaces All fees, taxes, costs, charges and expenses for operating cleaning, painting, managing maintaining, up-keeping, repair, replacement, renovation, overhaul, in respect of the Parking Spaces and also on deployment of personnel and agency for its operation, security, protection and other purposes etc.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Roads The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments.