Roadway Construction Plans (60%, 90%, and 100 Sample Clauses

Roadway Construction Plans (60%, 90%, and 100. Bid Ready) Consultant shall prepare construction drawings for the described improvements. The following tasks will complete the final construction plans for the project:  Before beginning development of 60% design plans, the project team will meet with City and ODOT staff to refine design elements identified during the preliminary design and to focus on the parameters of the design.  Prepare and organize all construction drawings. Identify which City and ODOT standard drawings are needed. The construction plans format will be in accordance with City standards. Details will show pay limits for the bid items.  Design plans will show the existing locations of manholes, catch basins, valves, culverts, utility poles, utility lines (alignment, size, invert elevation, and depth), existing easements, utility lines and sizes, property corners, and approximate property lines.  Prepare Detailed Grading Sheets. o ADA Ramps: • 0xx Xxxxxx: Up to 10 • 3rd Street: 8 • 0xx Xxxxxx: 8 • Edgewater Ln: 6 • 5th St: Up to 6 o Driveways: 7 o Intersections: 4  Finalize drainage and erosion control plans.  Finalize roadway plans. Final profiles will be prepared for the roadway. Plans will show proposed right-of-way and easement lines.  Provide signed electronic PDF’s of the contract plans.  Provide digital copies of all deliverables. Plans will be in AutoCAD Civil 3D format.
AutoNDA by SimpleDocs

Related to Roadway Construction Plans (60%, 90%, and 100

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Definition of Building Where Lift Required 1.1 A passenger/materials lift shall be provided on a building which shall, when complete, consist of more than six (6) storey levels excluding the roof, parapets and basement levels (if any), but including the ground floor. (Refer to Sub Clause 2.1 herein.)

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • Use of State Facilities Resources and Equipment a. Meeting Space and Facilities. The Employer’s campuses and facilities may be used by the Union to hold meetings subject to the University’s policy and availability of the space. The Employer may provide private space for stewards and/or Union representatives to meet in confidence with those they represent on a space available basis. Staff representatives may reserve and utilize meeting rooms in accordance with University policy and procedure. Such requests will be subject to availability and all applicable fees.

  • Gold Open Access Articles May be shared according to the author-selected end-user license and should contain a CrossMark logo, the end user license, and a DOI link to the formal publication on ScienceDirect. Please refer to Elsevier's posting policy for further information.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.