Room Construction Sample Clauses

Room Construction. Each occupant shall be provided with a single room of not less than eighty (80) square feet (7.43m²) of floor space. Walls and ceilings shall consist of a minimum one-half inch finished drywall with a suitable alternate material in wet areas. The rooms shall be properly insulated to guard against year round climatic conditions and the walls between rooms shall be soundproofed with one-half (1/2) inch (1.27cm) drywall and will have a layer of one-half (1/2) inch (1.27cm) soundboard on each side of the partitions between sleeping rooms. All walls to be insulated." The floor shall be covered with a suitable material such as tile or xxxx. The room shall be properly insulated to guard against year-round climatic conditions and sound. All interior walls shall be insulated for sound proofing. Closets and storage shelving shall be constructed in such a manner to ensure the best possible additional sound proofing between the rooms. Each room shall be fully enclosed with a solid core door and mortise-type dead lock or card lock system and the occupant shall be supplied with a key or key card. There shall be a thermo sealed window in each room fitted with a frost break and screen, and equipped with window blinds or lined drapes.
AutoNDA by SimpleDocs
Room Construction. Each occupant shall be provided with a single room of not less than eighty (80) square feet of floor space. One interior partition wall shall be of 3/8" vinyl covered gyproc, all other walls and ceilings shall be covered with a suitable material, or if wood to be properly finished. The floor shall be covered with a suitable material such as tile or xxxx. The room shall be properly insulated to guard against year-round climatic conditions and sound. All interior walls shall be insulated for sound proofing. Closets and storage shelving shall be constructed in such a manner to ensure the best possible additional sound proofing between the rooms. Each room shall be fully enclosed with a solid core door and a mortise-type dead lock Xxxxxx #A50lDLB or equivalent, and the occupant shall be supplied with a key. There shall be a window in each room fitted with a storm window and screen, and equipped with window blinds or lined

Related to Room Construction

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Completion of Construction (a) For the purposes of this Agreement, the terms "

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).