Second Recital Sample Clauses

Second Recital. The reference in the second recital of the Agreement to “$1.00” as the par value of each China Online Share is hereby replaced with “$0.0002”.
AutoNDA by SimpleDocs
Second Recital. The Second Recital is hereby amended and restated in its entirety by the following: “WHEREAS, the Company and Stockholder desire to cancel and terminate five million three hundred thirty-three thousand three hundred thirty-three (1,333,333) of the Shares (the “Cancelled Shares”) and any and all of Stockholder’s rights arising thereunder;”
Second Recital. The Second Recital of the Agreement is deleted in --------------- its entirety and the following language shall replace the Second Recital of the Agreement:
Second Recital. Complete the Second Recital with this description of the Contract Drawings: As attached with the RFQ documents. Delete the following: Delete the final paragraph of the Third Recital and replace with: "and those documents are attached to this Contract at Annexes A and B." Add to the end of the Third Recital: "or has otherwise provided a breakdown of the Contract Sum, which is attached at Annex C of this Contract."
Second Recital. The second recital to the Option Agreement is amended to read in its entirety as follows:
Second Recital. The parties mutually agree that the second recital of the Change of Control Agreement is hereby amended and restated as follows:
Second Recital. The number “20,000,0000” in the second recital to the Agreement is hereby replaced with “20,000,000.”
AutoNDA by SimpleDocs
Second Recital. The second recital is hereby amended as follows with additions in double-underline and deletions in strikethrough:
Second Recital. Complete the Second Recital with this description of the Contractor's Designed Portion: M&E Items – A suitable drainage system to serve the kitchen and W/C installation as per the proposed layout. A domestic hot and cold-water systems suitable to serve the kitchen and W/C installation as per the proposed layout. A suitable ventilation system to serve the office areas. The fan units are to be Mitsubishi Lossnay heat recovery units (or equal and approved). A suitable air conditioning heat pump system to provide heating and cooling in the main open office to suit the new proposed design. The system is to be a Mitsubishi Mr Slim ceiling mounted cassette unit (or equal and approved). A suitable air conditioning heat pump system to provide heating and cooling in the small office to suit the new proposed design. The system is to be a Mitsubishi M Series wall mounted unit (or equal and approved). A suitable electrical system suitable to serve the proposed layout. The system will consist of a new sub-main distribution board, all containment and all necessary circuit breakers, circuit cabling, isolators, etc. to serve socket outlets, lighting circuits, and small power to all mechanical plant and life safety systems. A suitable new lighting system suitable for proposed layout for the space including emergency lighting. If the fire alarm cannot be extended to accommodate the proposed new space, then allow to design, supply and install a new fire alarm system to L1 Category standard and install interlinks to allow it to connect with the existing fire alarm system if practicable. A suitable Dimplex electric panel heaters (or equal and approved), with integral thermostats and controllers, in the kitchen and WC Allow to install all power, containment, cabling and controls (including operating buttons, etc.) to the proposed power assisted door position at the entrance to the proposed new space. (as further detailed in the Contract Documents).
Second Recital. The Contractor is responsible for the design and construction of the whole of the Works Delete and substitute: “The Employer has made known to the Contractor the requirements for the Works as set out in Section F Part 2 of the Invitation to Tender “the Employer’s Requirements”. The Contractor has had the following documents prepared which show and describe the work to be done: [ ]; which for identification have been signed or initialled by or on behalf of each Party; those documents together with this Agreement, the Conditions and, if applicable, a Schedule of Rates as referred to in the Fourth Recital (collectively ‘the Contract Documents’) are annexed to this Agreement. The Contractor has agreed to accept full responsibility for all design elements of the Works. For the avoidance of doubt the Contractor shall be fully responsible for the design of the Works, whether such design work is carried out before, on or after the date of this Contract”.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!