Sediment Basin Sample Clauses

Sediment Basin. Sediment basins, measured according to Subsection 163.4,C “Measurement,” are paid for by the unit, per each, for the type specified on the Plans. Price and payment are full compensation for work and supervision to construct, and remove the sediment basin, including final clean-up.
AutoNDA by SimpleDocs

Related to Sediment Basin

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • ENDANGERED SPECIES The Endangered Species Act of 1973 (16 U.S.C. § 1531, et seq.) as amended, particularly section 7 (16 U.S.C. § 1536).

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

Time is Money Join Law Insider Premium to draft better contracts faster.