Selected Project Sample Clauses
Selected Project. Interconnecting in the New York Control Area. The Actual Production associated with the ORECs for the Selected Project must either be (a) delivered into a market administered by the NYISO for end-use in New York State, (b) delivered through a wholesale meter under the control of a utility, public authority or municipal electric company such that it can be measured, and such that consumption within New York State can be tracked and verified by such entity or by the NYISO, or (c) delivered through a dedicated generation meter at the Delivery Point that shall be compliant with the requirements and standards stated in Section 5.3 of the NYGATS Operating Rules, as such rules may be amended or changed from time to time.
Selected Project. Interconnecting in the New York Control Area. The Actual Production associated with the ORECs for Selected Projects that inject the energy generated by the Selected Project directly into the New York Control Area must either be (a) delivered into a market administered by the NYISO for end-use in New York State, (b) delivered through a wholesale meter under the control of a utility, public authority or municipal electric company such that it can be measured, and such that consumption within New York State can be tracked and verified by such entity or by the NYISO, or (c) delivered through a dedicated generation meter at the Delivery Point that shall be compliant with the requirements and standards stated in Section 5.3 of the NYGATS Operating Rules.
Selected Project. The offshore wind generation facility described in the Proposal and selected for award by NYSERDA in ORECRFP18-1.
Selected Project. [Seller shall identify the location, capacity (MW), fuel source, and expected date online of all generation and or storage facilities comprising the Selected Project. Seller may add or remove Resources with NYSERDA’s prior consent, such consent not to be unreasonably denied withheld or delayed.] [INSERT PROJECT MAP] Associated New Transmission Facility: [Seller shall identify and describe all transmission facilities necessary to deliver Qualified Renewable Energy associated with the Selected Project] to Zone J.] [INSERT MAP OF ASSOCIATED TRANSMISSION FACILITIES] Delivery Point: _____. Bid Quantity: _____. (Preliminary design to be replaced with the final installed) Economic Benefits proposed in Seller’s Proposal].
