Service Procedures on an Annual Basis. (1) Place each detector in alarm using an approved method. (2) Perform maintenance as described in semi-annual inspection procedure. (3) Alarm Bells / Horns Check individually for full sound power operation. (4) Manual Pull Stations Verify individual operation. (5) Auxiliary Devices and Systems Shutdown Air conditioning, heating, ventilating systems and power equipment shut-downs; will only be performed by special request. (6) Pre-Action Riser (a) Activate solenoid (with detection system). (b) Release air pressure from system using inspectors test. (c) Confirm operation of valve to open position.
Appears in 2 contracts
Samples: Fire Alarm System Maintenance Repair Contract, Fire Alarm System Maintenance and Repair Services
Service Procedures on an Annual Basis. (1) Place each detector in alarm using an approved method.
(2) Perform maintenance as described in semi-annual inspection procedure.
(3) Alarm Bells / Horns Check individually for full sound power operation.
(4) Manual Pull Stations Verify individual operation.
(5) Auxiliary Devices and Systems Shutdown Air conditioning, heating, ventilating systems and power equipment shut-downs; will only be performed by special request.
(6) Pre-Action Riser
(a) Activate solenoid (with detection system).
(b) Release air pressure from system using inspectors test.
(c) Confirm operation of valve to open position.
Appears in 1 contract
Service Procedures on an Annual Basis. (1) Place each detector in alarm using an approved method.
(2) Perform maintenance as described in semi-annual inspection procedure.
(3) Alarm Bells / Horns Check individually for full sound power operation.
(4) Manual Pull Stations Verify individual operation.
(5) Auxiliary Devices and Systems Shutdown Air conditioning, heating, ventilating systems and power equipment shut-shut- downs; will only be performed by special request.
(6) Pre-Action Riser
(a) Activate solenoid (with detection system).
(b) Release air pressure from system using inspectors test.
(c) Confirm operation of valve to open position.
Appears in 1 contract
Samples: Subordinate Contract for Facility Security Equipment, Systems and Services
Service Procedures on an Annual Basis. (1) Place each detector in alarm using an approved method.
(2) Perform maintenance as described in semi-annual inspection procedure.
(3) Alarm Bells / Horns Check individually for full sound power operation.Horns
(4) Manual Pull Stations Verify individual operation.
(5) Auxiliary Devices and Systems Shutdown Air conditioning, heating, ventilating systems and power equipment shut-downs; will only be performed by special request.
(6) Pre-Action Riser
(a) Activate solenoid (with detection system).
(b) Release air pressure from system using inspectors test.
(c) Confirm operation of valve to open position.
Appears in 1 contract
Samples: Subordinate Contract for Facility Security Equipment, Systems and Services