Common use of Share of liability Clause in Contracts

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 4 contracts

Samples: Qualifying Insurer’s Agreement, Qualifying Insurer’s Agreement, Qualifying Insurer’s Agreement

AutoNDA by SimpleDocs

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 2 contracts

Samples: Qualifying Insurer’s Agreement, Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s claimant‘s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Insurer‘s Initial Participation and the Insurer’s Insurer‘s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 2 contracts

Samples: Qualifying Insurer’s Agreement, Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 2 contracts

Samples: Qualifying Insurer’s Agreement, Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costsclaimant‘s costs and any applicable Value Added Tax in such costs and expenses) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Insurer‘s Initial Participation and the Insurer’s Insurer‘s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costscosts and any applicable Value Added Tax in such costs and expenses) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 2.7 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 2.7 shall (subject to paragraphs 3.9 3.8 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer's Agreement

AutoNDA by SimpleDocs

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costscosts and any applicable Value Added Tax in such costs and expenses) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted.incepted.‌ 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand.demand.‌ 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date.Date.‌ 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted. 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s claimant‘s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand. 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Insurer‘s Initial Participation and the Insurer’s Insurer‘s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date. 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer’s Agreement

Share of liability. 6.1 The Insurer shall be liable to make payments under each ARP Policy incepting in the relevant Indemnity Period or under any arrangements made pursuant to paragraph 2.8 in accordance with its Percentage Liability. 6.2 The Percentage Liability of the Insurer in respect of each ARP Policy or under any arrangements made pursuant to paragraph 2.8 shall (subject to paragraphs 3.9 or 9.3 or 9.4) equal its Percentage Participation applicable on the date on which that ARP Policy or any such arrangements incepted.incepted.‌ 6.3 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of making payments on behalf of the Insurer in accordance with its Percentage Liability. 6.4 The ARP Manager may at any time and from time to time demand from the Insurer an amount as specified by the ARP Manager for the purpose of meeting the administration and management costs and expenses (including any applicable Value Added Tax) of the ARP Manager, including without limitation in respect of all costs and expenses howsoever incurred (including where applicable, but without limitation, the amount of any claim paid and associated claimant’s costs) in respect of any claim handled by the ARP Manager in accordance with clause 12.1.2, provided that in each case any such demand is made at the same time from all Qualifying Insurers participating in the ARP at the date of the demand in accordance with the Percentage Liability of each such Insurer on the date of the demand.demand.‌ 6.5 If any demand under this paragraph 6 is made before the Notification Date in any Indemnity Period before the relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) of the Insurer has been determined, then any such demand may be made in accordance with the Initial Participation of the Insurer, provided that the ARP Manager shall make any adjustment necessary to the ARP Amount in respect of the Insurer to reflect any difference between the Insurer’s Initial Participation and the Insurer’s relevant Percentage Participation (or, as the case may be, the relevant Percentage Liability) within one month of the Notification Date.Date.‌ 6.6 The ARP Manager shall not make any demand from the Insurer under this paragraph 6 where: 6.6.1 the Insurer has paid the ARP Manager in full following all previous such demands; and 6.6.2 the ARP Manager holds sufficient premiums on trust for the Insurer from which to pay known and anticipated claims and defence costs and/or meet any administration and management costs and expenses (including any applicable Value Added Tax). 6.7 The Insurer shall pay to the ARP Manager all sums demanded by the ARP Manager under this paragraph 6 within 10 business days of such demand being made by the ARP Manager. If the Insurer fails to make payment to the ARP Manager in full within such period, the ARP Manager shall be further entitled to recover from the Insurer a sum equal to all reasonable additional costs and expenses incurred by it in pursuing such payment. Interest shall accrue at a rate equal to the base rate from time to time of Barclays Bank plc plus three per cent to any sums that remain unpaid within 10 business days of such demand being made by the ARP Manager, and any sums representing reasonable additional costs and expenses. 6.8 The ARP Manager shall, on request in writing from the Insurer, provide evidence of its administration and management costs and expenses where any sum in respect of such costs and expenses has been demanded under paragraph 6.4.

Appears in 1 contract

Samples: Qualifying Insurer's Agreement