Common use of Site Data Clause in Contracts

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 63 contracts

Samples: Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction Agreement, Construction Contract

AutoNDA by SimpleDocs

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 28 contracts

Samples: Construction Contract, Construction Contract, Construction Contract

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 12 contracts

Samples: Contract Agreement, Construction Contract, Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 11 contracts

Samples: Engineering Procurement and Construction (Epc) Contract, Engineering Procurement and Construction Agreement, Engineering Procurement and Construction Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited tolimitedto: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factorstechnicalfactors); (b) the hydrological and climatic conditionsclimaticconditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartalso. (d) the suitability and the adequacy of the Site for the execution of the WorkstheWorks; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the AgreementtheAgreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.maintenance;and

Appears in 9 contracts

Samples: Construction Contract, Construction Contract, Construction Contract

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 4 contracts

Samples: Engineering Procurement and Construction Agreement, Engineering Procurement and Construction Agreement, Engineering Procurement and Construction Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 3 contracts

Samples: Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction Agreement, Engineering Procurement and Construction Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface subsurface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 3 contracts

Samples: Draft Contract Agreement, Contract Agreement, Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] provisions of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 2 contracts

Samples: Engineering Procurement and Construction Agreement, Engineering Procurement and Construction (Epc) Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartal so. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartalso. (d) the suitability and the adequacy of the Site for the execution of the WorkstheWorks; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the AgreementtheAgreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.maintenance;and

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited tolimitedto: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factorstechnicalfactors); (b) the hydrological and climatic conditionsclimaticconditions; (c) the The extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartalso. (d) the suitability and the adequacy of the Site for the execution of the WorkstheWorks; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging Arranging permits as required as per [.] of the AgreementtheAgreement. (g) the requirements of operation and maintenance; andmaintenance;and (h) all All other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for CompletionforCompletion.

Appears in 2 contracts

Samples: Engineering Procurement and Construction Agreement, Engineering Procurement and Construction (Epc) Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface subsurface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] Schedule-F of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all All other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] Schedule F of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Engineering Procurement and Construction Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all All other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Contract Agreement

AutoNDA by SimpleDocs

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the The extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging Arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Construction Contract

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions conditions, and geo-technical geotechnical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes include the already executed part alsopart. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price Price, and Time for Completion.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] Schedule-F of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited tolimitedto: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factorstechnicalfactors); (b) the hydrological and climatic conditionsclimaticconditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartalso. (d) the suitability and the adequacy of the Site for the execution of the WorkstheWorks; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the AgreementtheAgreement. (g) the requirements of operation and maintenance; andmaintenance;and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for CompletionforCompletion.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited tolimitedto: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factorstechnicalfactors); (b) the hydrological and climatic conditionsclimaticconditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part alsopartalso. (d) the suitability and the adequacy of the Site for the execution of the WorkstheWorks; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the AgreementtheAgreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.maintenance;and

Appears in 1 contract

Samples: Construction Contract

Site Data. (ixlii) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Engineering Procurement and Construction (Epc) Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.Schedule F] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Contract Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface subsurface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Engineering Procurement and Construction Agreement

Site Data. (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- sub-surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) and all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

Appears in 1 contract

Samples: Construction Contract

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!