Common use of Special Requirements for Placing Paving Clause in Contracts

Special Requirements for Placing Paving. Lanes Succeeding Initial Lanes In placing each succeeding lane after the initial lane has been placed and compacted as specified hereafter, the screed endgate of the mechanical paver shall overlap the previously placed lane slightly and shall be approximately 1.25 times thicker than the existing compacted lane to allow for compaction roll down and produce a smooth compacted joint with the specified density. Mixture placed on the edge of the previously placed lane by the mechanical paver shall be pushed back (tucked) to the edge of the lane being placed by use of a lute (rake). The pushed back material shall form a ridge on the uncompacted lane along the edge of the previously placed lane. The height of the ridge above the uncompacted lane should be approximately equal to the thickness being allowed for roll down during compaction. These procedures shall be used to facilitate getting a smooth joint with density. Excess mixture shall be removed and wasted. Excess material shall not be spread over the uncompacted mat.

Appears in 4 contracts

Samples: www2.opkansas.org, apps.opkansas.org, www2.opkansas.org

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!