Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Tandem Switching 4.5.1 The Tandem Switching capability Network Element is defined as: (i) trunk-connect facilities, which include, but are not limited to, the connection between trunk termination at a cross-connect panel and switch trunk card; (ii) the basic switch trunk function of connecting trunks to trunks; and (iii) the functions that are centralized in the Tandem Switches (as distinguished from separate end office switches), including but not limited to call recording, the routing of calls to operator services and signaling conversion features. 4.5.2 Where <<customer_short_name>> utilizes portions of the BellSouth network in originating or terminating traffic, the Tandem Switching rates are applied in call scenarios where the Tandem Switching Network Element has been utilized. Because switch recordings cannot accurately indicate on a per call basis when the Tandem Switching Network Element has been utilized for an interoffice call originating from a UNE port and terminating to a BellSouth, Independent Company or Facility-Based CLEC office, BellSouth has developed, based upon call studies, a melded rate that takes into account the average percentage of calls that utilize Tandem Switching in these scenarios. BellSouth shall apply the melded Tandem Switching rate for every call in these scenarios. BellSouth shall utilize the melded Tandem Switching Rate until BellSouth has the capability to measure actual Tandem Switch usage in each call scenario specifically mentioned above, at which point the rate for the actual Tandem Switch usage shall apply. The UNE Local Call Flows set forth on BellSouth's website, as amended from time to time and incorporated herein by this reference, illustrate when the full or melded Tandem Switching rates apply for specific scenarios.
Unbundled Network Element Combinations 5.1. Unbundled Network Element Combinations shall include: 1) Enhanced Extended Links (EELs); 2) UNE Loops/Special Access Combinations; 3) Loop/Port Combinations; and 4)
Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.
Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three
Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.
Unbundled Loops 2.1.1 BellSouth agrees to offer access to unbundled loops pursuant to the following terms and conditions and at the rates set forth in Attachment 11.
ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.
Physical Collocation (a) If space for Physical Collocation is immediately available at the time of Requesting Carrier’s Collo Order, Ameritech shall include in its Collo Response to Requesting Carrier notice of such immediate availability. (b) If Requesting Carrier’s requested Physical Collocation space is available, Ameritech and Requesting Carrier shall have an initial walk-through of such space within the interval specified in the Implementation Plan. Absent Ameritech’s written consent, Requesting Carrier must have at least one (1) authorized employee (i.e., in addition to any authorized vendor) at such walk- through. If during the initial walk-through, Requesting Carrier wishes to modify or change its Collo Request, Requesting Carrier must sign or initial any such modifications or changes and provide Ameritech a change order reflecting same within five (5) Business Days of such initial walk-through. If a change or modification is noted at the initial walk-through, Ameritech shall have no obligation to commence work on Requesting Carrier’s Collocation space until it receives a change order to amend the Collo Request or written confirmation that Requesting Carrier does not wish to pursue such change or modification. Failure to provide Ameritech the change order or written confirmation within the foregoing five (5) Business Day period shall be deemed a Requesting Carrier Delaying Event for the period between the expiration of such five (5) day period and the date of actual receipt by Ameritech. (c) Ameritech shall deliver to Requesting Carrier the requested space on or before the later of (i) one hundred twenty (120) days from Ameritech’s receipt of Requesting Carrier’s Collo Order, (ii) ninety (90) days from the date of the initial walk-through and (iii) such other reasonable date that the Parties may agree upon if it is not feasible for Ameritech to deliver to Requesting Carrier such space within the foregoing intervals (such date of delivery referred to as the “Delivery Date”). (d) Physical Collocation space ordered by Requesting Carrier will be made available to Requesting Carrier by Ameritech as more fully described in Section 1 of Schedule 12.12. (e) Ameritech may begin billing recurring charges for the Collocated space on the date such space is made available for occupancy (the “Occupancy Date”). Requesting Carrier shall vacate the Collocated space if either (i) Requesting Carrier (or one of its Resident Collocators, if applicable) fails to install within ninety (90) days of the Occupancy Date the equipment necessary for Interconnection with Ameritech and/or access to Ameritech’s unbundled Network Elements to be housed in such space or (ii) Requesting Carrier (or one of its Resident Collocators, if applicable) fails to Interconnect to the Ameritech network within one hundred fifty (150) days of the Occupancy Date. If Requesting Carrier is required to vacate the space pursuant to this Section 12.12.2(e), Requesting Carrier (and its Resident Collocators) shall vacate such space within ninety (90) Business Days of the earliest to occur of the foregoing events. If, after vacating a space, Requesting Carrier still requires Collocation in that Premises, Requesting Carrier shall be required to submit a new request for Collocation pursuant to the provisions of Section 12.12.1. (f) Physical Collocation will be subject to the additional rules and regulations set forth in Section 2.0 of Schedule 12.12. (g) At Requesting Carrier’s request Ameritech shall provide for APCS within three
Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.