STADCO’S RISKS. XXXXXX AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”): (A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS; (B) THE CONDITION, SUITABILITY, OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS; (C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW; (D) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK; (E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON; (F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND (G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 2 contracts
Samples: Development Agreement, Development Agreement
STADCO’S RISKS. XXXXXX STADCO AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) WORK;
(E) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX STADCO (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development Agreement
STADCO’S RISKS. XXXXXX AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) WORK;
(E) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development Agreement
STADCO’S RISKS. XXXXXX AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, OR IS ACTUALLY KNOWN BY THE AUTHORITY (PROVIDED THAT THE AUTHORITY SHALL HAVE NO OBLIGATION TO SEARCH FOR ANY INFORMATION) AND HAS NOT BEEN DISCLOSED TO STADCO IN WRITING THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LANDLAND BY STADCO OR ANY OF ITS AFFILIATES OR A CONTRACTOR OR SUBCONTRACTOR OF ANY TIER WITH WHOM EITHER HAS CONTRACTED, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. LAND BY STADCO OR ANY OF ITS AFFILIATES OR A CONTRACTOR OR SUBCONTRACTOR OF ANY TIER WITH WHOM EITHER HAS CONTRACTED.
(H) NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY SUCH PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development and Funding Agreement
STADCO’S RISKS. XXXXXX AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development Agreement
STADCO’S RISKS. XXXXXX AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development Agreement
STADCO’S RISKS. XXXXXX STADCO AGREES THAT NEITHER THE AUTHORITY NOR ANY OF THE AUTHORITY’S RELATED PARTIES SHALL HAVE ANY RESPONSIBILITY FOR ANY OF THE FOLLOWING (COLLECTIVELY, “STADCO’S RISKS”):
(A) THE ACCURACY OR COMPLETENESS OF ANY INFORMATION SUPPLIED BY ANY PERSON OTHER THAN THE EXPRESS REPRESENTATIONS AND WARRANTIES CONTAINED IN SECTION 4.1 HEREOF OR THE OTHER PROJECT DOCUMENTS;
(B) THE CONDITION, SUITABILITY, SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, DESIGN, OPERATION OR VALUE OF THE LAND OR THE PROJECT IMPROVEMENTS;
(C) THE COMPLIANCE OF STADCO’S DEVELOPMENT OF THE LAND OR ANY OTHER PROPERTY OF THE AUTHORITY WITH THE COUNTY DEVELOPMENT AGREEMENT AND ANY OTHER APPLICABLE LAND USE REGULATIONS OR ANY APPLICABLE LAW;
(D) THE FEASIBILITY OF THE PROJECT IMPROVEMENTS WORK;
(E) EXCEPT TO THE EXTENT SUCH IS WITHIN THE SCOPE OF THE AUTHORITY REMEDIAL WORK, THE EXISTENCE OR ABSENCE OF ANY HAZARDOUS MATERIALS OR STATE ARCHEOLOGICAL LANDMARKS ON THE LAND OR ENVIRONMENTAL EVENTS WITH RESPECT TO THE LAND OR THE PROJECT IMPROVEMENTS THEREON;
(F) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, THE CONSTRUCTION OF ANY PROJECT IMPROVEMENTS ON THE LAND, INCLUDING THE STADIUM; AND
(G) EXCEPT TO THE EXTENT EXPRESSLY PROVIDED IN THE PROJECT DOCUMENTS, ANY OTHER MATTER RELATING TO ANY PROJECT IMPROVEMENTS AT ANY TIME CONSTRUCTED OR TO BE CONSTRUCTED ON THE LAND. NEITHER THE AUTHORITY NOR ANY OF ITS RELATED PARTIES SHALL BE LIABLE AS A RESULT OF ANY FAILURE BY ANY PERSON (OTHER THAN THE AUTHORITY) UNDER ANY PROJECT DOCUMENT TO PERFORM THEIR RESPECTIVE OBLIGATIONS THEREUNDER. IT IS UNDERSTOOD AND AGREED BY XXXXXX STADCO (FOR ITSELF OR ANY PERSON CLAIMING BY, THROUGH OR UNDER IT) THAT IT HAS ITSELF BEEN, AND WILL CONTINUE TO BE, SOLELY RESPONSIBLE FOR MAKING ITS OWN INDEPENDENT APPRAISAL OF, AND INVESTIGATION INTO, THE FINANCIAL CONDITION, CREDIT WORTHINESS, CONDITION, AFFAIRS, STATUS, AND NATURE OF ANY PERSON UNDER THE PROJECT DOCUMENTS AND THE LAND, THE PROJECT IMPROVEMENTS OR ANY OTHER PROPERTY.
Appears in 1 contract
Samples: Development Agreement