Standard Details Sample Clauses

Standard Details. In case of any ambiguity or dispute over interpreting the road plan, the Contract Administrator’s or designee’s decision will be final.
AutoNDA by SimpleDocs
Standard Details. 5.4.1.1 Engineering Standard - Vertical Vessel Platforms Typical Details 3DS-M59-00101 000
Standard Details. The Engineer will use the latest TxDOT standard details for beams, diaphragms, railings, expansion joints, riprap, etc. wherever possible. Prepare any project-specific modified standards necessary for inclusion in the PS&E package. Sign, seal and date all project-specific modified standards.
Standard Details. This subcontractor is responsible for reviewing Contractor’s Standard Details. These details are made a part of this subcontract agreement. If more stringent or conflicting contract specifications or details are shown on contract documents , it is this trade’s responsibility to confirm with Contractor’s Project Manager which detail shall govern.
Standard Details. Refer to the District’s Standard Details for Sewer Extensions which are attached hereto and made a part of this agreement. PART THREE: VALLEY VIEW SEWER DISTRICT DESIGN STANDARDS FOR SEWER PLANS AND DRAWINGS
Standard Details. Refer to the District’s Standard Details for Sewer Extensions which are attached hereto and made a part of this agreement. PART THREE: VALLEY VIEW SEWER DISTRICT DESIGN STANDARDS FOR SEWER PLANS AND DRAWINGS PLANS Plan Drawings All sewer plans for developer extensions shall be drafted on 22” x 34” or 24” x 36” bond paper and electronically in PDF format for submittal to the District. The proposed plans shall become the property of the District. All drafting shall be in the current version of AutoCAD. All existing and proposed sewer improvements shall be shown. The base map shall be produced by a State of Washington licensed Surveyor. The base map shall include but not be limited to lot lines, easements, right of way, all existing utilities, rim and top elevations of existing structures, all existing features and contours. The existing features shall be shown as either dashed lines or light line work and the proposed new sewer items shall be shown with a heavier, solid line weight. The electronic files shall be submitted to the District. Vertical Scale: 1” = 5’; or 1” = 10’ Horizontal Scale: 1” = 20’; or 1” – 50’ Other scales can be proposed to the District. When more than one sheet is required to cover all of the construction area, an Overall Key Drawing plan shall be included designating which area each plan sheet includes. Vertical Datum shall be NAVD88. The elevation bench marks used for control shall be shown on the plans. The Section, Township and Range shall be included at the top of each plan sheet or just the cover sheet. Plans must be signed by a State of Washington licensed professional civil engineer. Plan views shall be laid out to afford maximum understanding of proposed plan. There shall be as few sheets as possible, but there must be room on the sheets for General notes or specific Construction notes. The direction of north shall be shown generally up or to the left on the plans, and in no case shall the direction of north be shown in the opposite directions on the same or connection sheets. Sanitary sewer plans shall be separate from plat, road, water, storm, drainage or other utility plans, unless the District approves combining of the plans prior to the start of the design. Plan and profile of each proposed sewer line from manhole to manhole shall be shown on the same sheet. Profiles are required and shall be extended directly above or below the plan view when possible. All existing utilities shall be shown in the profiles and the relatio...
Standard Details. 7. Road work maps In case of any ambiguity or dispute over interpreting the road plan, the Contract Administrator’s or designee’s decision will be final.
AutoNDA by SimpleDocs
Standard Details. Xxxxxxx Group will review the CoW’s library of standard details and associated history of development, for the purposes of continuing CoW’s effort to split out desired standard details from a single composite file that is currently used to house all details. Each detail’s design intent will be reviewed for consistency with current industry best practices; Xxxxxxx Group will make note of any suggested improvements for discussion with the CoW. Each detail will be ‘cleaned’ per industry best practices for CAD development and renamed in a manner consistent with CoW’s organizational goals. For the purpose of this proposal, Xxxxxxx Group understands that approximately 13 details still need to be either split out from the composite file, reviewed/cleaned, or both.
Standard Details. 2.8.10.1 Maricopa County Department of Transportation Standard Details for guardrail installation are listed below: DETAILS: 2801 2802 2803 2805 2806 2807 2808-1 2808-2 2808-3 2812-1 2812-2 2812-3 2816 3004 3009 3010-1 3010-2 3100 3101 3102 3103 3005 3108 3116 MCDOT Standard Details are located in the MCDOT Supplement to the Maricopa Association of Government (MAG) Uniform Standard Specifications and Details for Public Work Construction available on the MCDOT website at: xxxx://xxx.xxxxx.xxxxxxxx.xxx/technical/
Standard Details. The Transfer of Ownership in the Work Product as described in Section 15.2 does not include design details developed by A/E and/or A/E’s Consultants which are not unique to the Project (collectively, “Standard Details”). A/E and/or A/E’s Consultants shall be entitled to use their respective Standard Details on other projects; provided, however, A/E and A/E’s Consultants shall not use their respective Standard Details in any manner which, taken independently or in combination, would produce another project with the same overall appearance of Owner’s Project. Concurrent with the incremental Transfer of Ownership, Owner shall be granted an irrevocable, non-exclusive, royalty-free license to use the Standard Details as reasonably necessary in connection with the construction, renovation, extension, expansion, repair, occupancy, operation and maintenance of the Project, and all other permitted uses. Owner shall not, except as required by any source of financing for this Project, assign, delegate, sublicense, pledge or otherwise transfer any license granted herein to another party without the prior written agreement of A/E. Any use of the A/E’s Work Product without the involvement of A/E shall be at Owner’s sole risk and without liability to A/E and A/E’s Consultants, except as provided in Section 15.4.1.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!