Common use of Storage and Placement Clause in Contracts

Storage and Placement. A) All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) All work shall be subject to supervision and inspection by Landlord’s Representative. E) No alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code. All holes in the floor slab at abandoned floor outlets, etc. need to be filled with solid concrete.

Appears in 5 contracts

Samples: Lease Agreement (Cyteir Therapeutics, Inc.), Lease Agreement (Xenetic Biosciences, Inc.), Lease Agreement (Xenetic Biosciences, Inc.)

AutoNDA by SimpleDocs

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, toxic or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Managerprior notice is given to Landlord's Construction Representative, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. Notwithstanding the foregoing, normal construction materials which might otherwise be considered flammable, toxic, or hazardous may be brought into the Building, provided that the quantities of such materials are limited to the amount necessary to perform Tenant's Work, and further provided that such materials are handled by Tenant strictly in accordance with Tenant's approved safety program. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standards, Premises must conform with the plans and specifications Plans approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by Landlord’s 's Construction Representative. E) e. No alterations material changes to approved plans Plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulationsLandlord's Construction Representative. F) f. All protective devices (e.g., temporary enclosures and partitions) and materialsmaterials which protect public areas or areas occupied by other tenants, as well as their placement, must be approved by the Property ManagerLandlord's Construction Representative. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code"fire stopped" in a manner consistent with all applicable codes and ordinances. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 3 contracts

Samples: Lease Agreement (Firepond Inc), Lease Agreement (Firepond Inc), Lease (CTC Communications Group Inc)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metProperty unless: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iiiii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standards, must substantially conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings Plans approved by the Landlord. D) d. All work Work shall be subject to reasonable supervision and inspection by Landlord’s Representativerepresentative. E) e. No substantial alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build built” drawings required to be delivered to Landlord pursuant to Paragraph Section 10 of the rules Rules and regulationsRegulations. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress access or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codepacked solid with fiberglass insulation to make openings smoke tight. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 2 contracts

Samples: Lease Agreement (Microphase Corp), Lease (Cara Therapeutics, Inc.)

Storage and Placement. A) All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) All materials required for the construction of the premises must comply with Building Standards, must conform with to the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) All work shall be subject to supervision and inspection by Landlord’s Representative. E) No alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code. All holes in the floor slab at abandoned floor outlets, etc. need to be filled with solid concrete.

Appears in 2 contracts

Samples: Lease Agreement (Keros Therapeutics, Inc.), Lease Agreement (Keros Therapeutics, Inc.)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i) authorized by the Property ManagerConstruction Coordinator, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by a representative of Landlord’s Representative. E) e. No alterations to approved plans will be made without prior knowledge and approval of the Property ManagerSenior Tenant Design Coordinator. Such changes shall be documented on the as-build built drawings required to be delivered to Landlord pursuant to Paragraph 10 of these General Conditions. At the rules time that such changes are prepared by the Tenant and regulationsapproved by Landlord, Tenant shall submit such approved changes to the Construction Coordinator. At the time that any shop drawing is approved by the Senior Tenant Design Coordinator, Tenant shall submit such approved shop drawings to the Construction Coordinator. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property ManagerConstruction Coordinator. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codefirestopped in accordance with applicable codes. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 2 contracts

Samples: Lease Agreement (Lightbridge Inc), Office Lease Agreement (Zix Corp)

Storage and Placement. A) All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) All work shall be subject to supervision and inspection by Landlord’s Representative. E) No alterations to approved plans will be made without prior knowledge and approval of the Property Manager, which approval will not be unreasonably withheld, conditioned or delayed. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code. All holes in the floor slab at abandoned floor outlets, etc. need to be filled with solid concrete.

Appears in 1 contract

Samples: Lease Agreement (Synageva Biopharma Corp)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i1) authorized by the Property ManagerConstruction Coordinator, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by a representative of Landlord’s Representative. E) e. No alterations to approved plans will be made without prior knowledge and approval of the Property ManagerSenior Tenant Design Coordinator. Such changes shall be documented on the as-build built drawings required to be delivered to Landlord pursuant to Paragraph 10 of these General Conditions. At the rules time that such changes are prepared by the Tenant and regulationsapproved by Landlord, Tenant shall submit such approved changes to the Construction Coordinator. At the time that any shop drawing is approved by the Senior Tenant Design Coordinator, Tenant shall submit such approved shop drawings to the Construction Coordinator. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property ManagerConstruction Coordinator. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codefirestopped in accordance with applicable codes. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Lease Agreement (Manhattan Associates Inc)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standardsstandards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by Landlord’s Representative. E) e. No alterations alternations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build built drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codepacked solid with fiberglass insulation to make openings smoke tight. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Lease Agreement (Blueprint Medicines Corp)

AutoNDA by SimpleDocs

Storage and Placement. A) A. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) B. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) C. All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) D. All work shall be subject to supervision and inspection by LandlordXxxxxxxx’s Representative. E) E. No alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) F. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) G. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) H. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code. All holes in the floor slab at abandoned floor outlets, etc. need to be filled with solid concrete.

Appears in 1 contract

Samples: Lease Agreement (Curis Inc)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standardsstandards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by Landlord’s Representative. E) e. No alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build built drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codepacked solid with fiberglass insulation to make openings smoke tight. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Lease Agreement (Beam Therapeutics Inc.)

Storage and Placement. A) All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i) authorized by the Property Building Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) All work shall be subject to reasonable supervision and inspection by Landlord’s 's Representative. E) No alterations to approved plans will be made without prior knowledge and approval of the Property Building Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Building Manager. G) It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codepacked solid with fiberglass insulation to make opening smoke tight. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Office and Laboratory Lease Agreement (Viacell Inc)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metby any Contractor unless: (i) authorized by the Property ManagerManager (if not customarily used in construction of Tenant Improvements), (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standardsstandards, must conform with to the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work construction activities and all Tenant Work shall be subject to supervision and reasonable inspection by Landlord’s PM or other Landlord Representative. E) e. No material alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build built drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) g. It is the responsibility of Contractors the Contractor to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, and egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codefire stopped with a UL listed product approved by the Property Manager. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Lease (Agios Pharmaceuticals Inc)

Storage and Placement. A) a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are metunless: (i) authorized by the Property ManagerConstruction Coordinator, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor Contractor handling such materials against damage or injury caused by such materials. C) c. All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) d. All work shall be subject to reasonable supervision and inspection by a representative of Landlord’s Representative. E) e. No alterations to approved plans will be made without prior knowledge and approval of the Property ManagerSenior Tenant Design Coordinator. Such changes shall be documented on the as-build as built drawings required to be delivered to Landlord pursuant to Paragraph 10 of these General Conditions. At the rules time that such changes are prepared by the Tenant and regulationsapproved by Landlord, Tenant shall submit such approved changes to the Construction Coordinator. At the time that any shop drawing is approved by the Senior Tenant Design Coordinator, Tenant shall submit such approved shop drawings to the Construction Coordinator. F) f. All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property ManagerConstruction Coordinator. G) g. It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) h. All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per codefire-stopped in accordance with applicable codes. All holes in the floor slab at abandoned floor outlets, etc. need to will be filled with solid concrete.

Appears in 1 contract

Samples: Lease (Eroom Technology Inc)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!