Subsurface gross gamma measurement Sample Clauses

Subsurface gross gamma measurement. At each location in which a borehole is installed, the metal drive casings will be removed to minimize shielding (leaving the PVC liner), and where accessible, gamma logging will take place over the full length of the borehole. This task will ensure that areas of substantially elevated gross gamma count rates are identified for subsequent soil sampling.
AutoNDA by SimpleDocs

Related to Subsurface gross gamma measurement

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!