Surveying. 13.7.1 D-BE shall notify County at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE shall not disturb survey monuments, lot stakes, or benchmarks without the consent of County, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by County. D-BE shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced. 13.7.2 D-BE shall notify County in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet. 13.7.3 All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to County. In the absence of such report, D-BE shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE shall transfer them to the bottom of the trench. 13.7.4 Surveying by D-BE shall conform to the quality and practice required by County.
Appears in 2 contracts
Samples: Construction Contract, Construction Contract
Surveying. 13.7.1 13.6.1 D-BE shall notify County OWNER at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE shall not disturb survey monuments, lot stakes, or benchmarks without the consent of CountyOWNER, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County OWNER by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by CountyOWNER. D-BE shall preserve construction survey stakes and marks for the duration of their usefulness, usefulness and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 13.6.2 D-BE shall notify County OWNER in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County OWNER for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 13.6.3 All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to CountyOWNER. In the absence of such report, D-BE shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE shall transfer them to the bottom of the trench.
13.7.4 13.6.4 Surveying by D-BE shall conform to the quality and practice required by CountyOWNER.
Appears in 1 contract
Samples: Design Build Construction Contract
Surveying. 13.7.1 13.6.1. D-BE shall notify County Owner at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE shall not disturb survey monuments, lot stakes, or benchmarks without the consent of CountyOwner, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County Owner by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by CountyOwner. D-BE shall preserve construction survey stakes and marks for the duration of their usefulness, usefulness and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 13.6.2. D-BE shall notify County Owner in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County Owner for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 13.6.3. All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to CountyOwner. In the absence of such report, D-BE shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE shall transfer them to the bottom of the trench.
13.7.4 13.6.4. Surveying by D-BE shall conform to the quality and practice required by CountyOwner.
Appears in 1 contract
Samples: Construction Services Contract
Surveying. 13.7.1 D-BE Contractor shall notify County at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE Contractor shall not disturb survey monuments, lot stakes, or benchmarks without the consent of County, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE Contractor shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by County. D-BE Contractor shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 D-BE . Contractor shall notify County in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE Contractor shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 . All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to County. In the absence of such report, D-BE Contractor shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE Contractor shall transfer them to the bottom of the trench.
13.7.4 . Surveying by D-BE Contractor shall conform to the quality and practice required by County.
Appears in 1 contract
Samples: Construction Contract
Surveying. 13.7.1 D-BE 13.6.1. XXXX shall notify County Owner at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE XXXX shall not disturb survey monuments, lot stakes, or benchmarks without the consent of CountyOwner, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County Owner by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE XXXX shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by CountyOwner. D-BE XXXX shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 D-BE 13.6.2. XXXX shall notify County Owner in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE XXXX shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County Owner for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 13.6.3. All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to CountyOwner. In the absence of such report, D-BE XXXX shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE XXXX shall transfer them to the bottom of the trench.
13.7.4 13.6.4. Surveying by D-BE XXXX shall conform to the quality and practice required by CountyOwner.
Appears in 1 contract
Samples: Construction Services Contract
Surveying. 13.7.1 13.6.1 D-BE shall notify County at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE shall not disturb survey monuments, lot stakes, or benchmarks without the consent of County, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by County. D-BE shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 13.6.2 D-BE shall notify County in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 13.6.3 All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to County. In the absence of such report, D-BE shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE shall transfer them to the bottom of the trench.
13.7.4 13.6.4 Surveying by D-BE shall conform to the quality and practice required by County.
Appears in 1 contract
Samples: Construction Contract
Surveying. 13.7.1 D-BE 13.5.1. Contractor shall notify County at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE Contractor shall not disturb survey monuments, lot stakes, or benchmarks without the consent of County, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE Contractor shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by County. D-BE Contractor shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 D-BE 13.5.2. Contractor shall notify County in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE Contractor shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 13.5.3. All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to County. In the absence of such report, D-BE Contractor shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE Contractor shall transfer them to the bottom of the trench.
13.7.4 13.5.4. Surveying by D-BE Contractor shall conform to the quality and practice required by County.
Appears in 1 contract
Samples: Construction Contract
Surveying. 13.7.1 D-BE shall notify County Owner at least 7 days before starting work to allow for the preservation of survey monuments, lot stakes, and benchmarks. D-BE shall not disturb survey monuments, lot stakes, or benchmarks without the consent of CountyOwner, and shall bear the expense of replacing any that may be disturbed without such consent. Replacement shall be done only under the direction of County Owner by a Registered Licensed Land Surveyor or a Registered Civil Engineer authorized to practice land surveying within the State. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, D-BE shall adjust the monument cover to the new grade within 7 days of finished paving unless otherwise instructed by CountyOwner. D-BE shall preserve construction survey stakes and marks for the duration of their usefulness, and will bear the expense of any survey stakes that are lost or disturbed and need to be replaced.
13.7.2 D-BE shall notify County Owner in writing at least 7 days before survey services will be required in connection with the laying out of any portion of the work. D-BE shall dig all holes necessary for line and grade stakes. Unless otherwise specified in the Contract Documents, stakes will be set and stationed by County Owner for curbs, headers, sewers, storm drains, structures, and rough grade. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet.
13.7.3 All work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to CountyOwner. In the absence of such report, D-BE shall be responsible for any error in the grade of the work. Grades for underground conduits will be set at the surface of the ground. D-BE shall transfer them to the bottom of the trench.
13.7.4 Surveying by D-BE shall conform to the quality and practice required by CountyOwner.
Appears in 1 contract
Samples: Design and Construction Agreement