Common use of Surveying Clause in Contracts

Surveying. 13.7.1 XXXX has full responsibility for layout and establishment of lines and grades for execution of the work. All temporary monuments shall be substantially established and shall be protected and maintained in place by the XXXX for the duration of the work. 13.7.2 If any discrepancy exists between the lines and grads actually at the site and the existing lines and grades depicted on the drawings, the XXXX shall notify the County Project Manager at once, and before commencing work. 13.7.3 The engineering survey work need not be performed by a State licenses surveyor or civil engineer, however it shall be performed in a professional manner in accordance with the requirements, standards, and practices exercised by licenses individuals. 13.7.4 The surveyor shall check line, level, and plumb of every major element of the construction, and shall keep a log book recording all relevant data. The log book shall be available for review by County Representatives of the A-E at any time during construction, and it shall be submitted to the Owner along with the “as-Built” drawings, upon completion of the Project. All deviations from line/grade requirements of the Contract Documents which are accepted (not corrected) by the XXXX shall be recorded in the log book and also shall be noted on the “as-Built” drawings.

Appears in 4 contracts

Samples: Construction Contract, Construction Manager at Risk Construction Agreement, Construction Contract

AutoNDA by SimpleDocs

Surveying. 13.7.1 XXXX CM has full responsibility for layout and establishment of lines and grades for execution of the work. All temporary monuments shall be substantially established and shall be protected and maintained in place by the XXXX CM for the duration of the work. 13.7.2 If any discrepancy exists between the lines and grads actually at the site and the existing lines and grades depicted on the drawings, the XXXX CM shall notify the County Project Manager at once, and before commencing work. 13.7.3 The engineering survey work need not be performed by a State licenses surveyor or civil engineer, however it shall be performed in a professional manner in accordance with the requirements, standards, and practices exercised by licenses licensed individuals. 13.7.4 The surveyor shall check line, level, and plumb of every major element of the construction, and shall keep a log book logbook recording all relevant data. The log book logbook shall be available for review by County Representatives of the A-E at any time during construction, and it shall be submitted to the Owner County along with the “as-Built” drawings, upon completion of the Project. All deviations from line/grade requirements of the Contract Documents which are accepted (not corrected) by the XXXX CM shall be recorded in the log book logbook and also shall be noted on the “as-Built” drawings.

Appears in 2 contracts

Samples: Construction Phase Services, Construction Phase Services

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!