System Compliance. Licensee agrees that the System shall be designed, at Licensee’s cost, to comply with all applicable California building codes and standards, SGIP Handbook equipment eligibility and provisions of Rule 21 or its successor, and in accordance with Trustees permit process, in effect as of the Effective Date. System design and Construction Documents shall expressly state and identify the applicable building codes and standards. System design and Construction Documents submitted by Licensee must include, but shall not be limited to, the following: • System schematics • Single line electrical diagram • Short circuit and coordination study • Electrical Interconnection Point schematics • Electrical Interconnection Point single line electrical diagram • Utility Interconnection Agreement • Construction plans (structural, civil, mechanical, etc.) • Structural calculations (as necessary or required) • List of equipment and materials schedule • Construction schedule • Foundation recommendations as applicable (consistent with owner supplied geotechnical report) • As-Built Drawings
Appears in 4 contracts
Samples: Master Enabling Agreement, Master Enabling Agreement, Master Enabling Agreement