System Deliverability Upgrades. The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to the existing New York State Transmission System that are required for the proposed project to System Upgrade Facilities – The least costly configuration of commercially available components of electrical equipment that can be used, consistent with good utility practice and Applicable Reliability Requirements to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff – The NYISO’s Open Access Transmission Tariff, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Upgrades – The required additions and modifications to the Connecting Transmission Owner’s portion of the New York State Transmission System or the Distribution System at or beyond the Point of Interconnection. Upgrades may be System Upgrade Facilities or System Deliverability Upgrades Distribution Upgrades. Upgrades do not include Interconnection Facilities or Jointly Owned Interconnection Facilities. Attachment 2 Detailed Scope of Work, Including Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment
System Deliverability Upgrades. The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard for Capacity Resource Interconnection Service.
System Deliverability Upgrades. There are no System Deliverability Upgrades that are covered by this Agreement.
System Deliverability Upgrades. The System Deliverability Upgrades required for the Large Generating Facility, if any, will be identified in the Class Year Study that commences after the completion of Class Year 2015.
System Deliverability Upgrades. The System Deliverability Upgrades required for the Small Generating Facility, if any, will be identified in the Class Year Study for Class Year 2019.
System Deliverability Upgrades. None One line diagram has been deleted from Public Version because it contains CEII material
System Deliverability Upgrades. The System Deliverability Upgrades (“SDUs”) required for the Large Generating Facility, if any, will be identified in the Class Year Study for Class Year 2017.
System Deliverability Upgrades. The System Deliverability Upgrades (“SDUs”) required for the Merchant Transmission Facility, if any, will be identified in the Class Year Study for Class Year 2021.
System Deliverability Upgrades. The Developer’s Large Generating Facility participated in the Class Year 2011 Interconnection Facilities Study. That study determined that certain System Deliverability Upgrades are required in order for the Large Generating Facility to receive Capacity Resource Interconnection Service. The System Deliverability Upgrades identified and cost allocated in Class Year 2011 for the Large Generating Facility involve upgrades to portions of the New York State Transmission System operated by Affected System Operators – Central Xxxxxx Gas & Electric and Niagara Mohawk Power Corporation d/b/a National Grid. Pursuant to Section 25.7.12 of Attachment S to the NYISO OATT, the Developer of the Large Generating Facility accepted its System Deliverability Upgrade Project Cost Allocation in the Final Decision Round of the Class Year 2011 Interconnection Facilities Study and posted the required Security for same. Specifically, the Developer accepted a System Deliverability Upgrade Project Cost Allocation and posted Security for same in the amount of $14,372,864, of which the Final Decision Round of the Class Year 2011 Interconnection Facilities Study allocated $13,996,868 to Central Xxxxxx Gas & Electric and $375,996 to Niagara Mohawk Power Corporation d/b/a National Grid. The Developer, therefore, is eligible for Capacity Resource Interconnection Service when the Large Generating Facility begins Commercial Operation pursuant to this Agreement. The System Deliverability Upgrades, to the extent they are constructed pursuant to Section 25.7.12 of Attachment S to the NYISO OATT, will be designed, procured, and constructed pursuant to separate Engineering, Procurement, and Construction agreements by and among the NYISO, the Developer, Central Xxxxxx Gas & Electric, and Niagara Mohawk Power Corporation d/b/a National Grid.
System Deliverability Upgrades. 2. ASO Estimated Total Costs Developer has accepted, and has provided Security to the Affected System Operator to cover, the following ASO Estimated Total Costs identified in the Class Year Interconnection Facilities Study for the Affected System Upgrade Facilities at the East Xxxxxx Road switchyard: $313,700. 3. Milestones 1. Engineering Start October 2023 Affected System Operator 2. Engineering End March 2024 Affected System Operator
3. Procurement Start January 2024 Affected System Operator
4. Procurement End April 2024 Affected System Operator 5. Construction Start May 2024 Affected System Operator 6. Construction End July 2024 Affected System Operator 9. In-Service Date November 2024 Affected System Operator 10. Completion Date February 2025 Affected System Operator 4. Security In accordance with Section 6.2 of this Agreement, Developer has provided Affected System Operator with Security in the amount of $313.700 in cash upon completion of Class Year 2019. Notices: NYISO: Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Email: xxxxxxxxxxxxxxxxxxxxxx@xxxxx.xxx MILESTONES NextEra Energy Transmission New York, Inc. Attn: Interconnection Manager 00 Xxxxxxxxx Xxxx Xxxxx Xxxxxxx Xxxx, NY 12065 Phone: 000-000-0000 Alle Catt Wind Energy LLC Attn: Asset Manager Xxx Xxxxx Xxxxxx Xxxxx, Suite 1800 Chicago, IL 60606 Niagara Mohawk Power Corporation d/b/a National Grid Attn: Xxxxx Xxxxxxx, Director, Commercial Services 170 Data Drive Xxxxxxx, MA 00000-0000 Fax: (000) 000-0000