Technical Appendixes Clause Samples
Technical Appendixes. The parties hereby confirm their clear and accurate understanding of the terms and conditions of the Contract and its appendixes and will commit themselves to the clauses as stipulated hereunder. All the documents mentioned hereinabove and the appendixes attached hereto are hereby made an integral part of the Contract.
2.1 Project name: 160t/h CDQ Project of Henan Shuncheng Group Coal Coke Co., Ltd.
2.2 Project site: Tongye Town, Anyang County, Henan Province.
3.1 Equipments and Erection and Construction Work under the Contract: CDQ system, initial dust separator, secondary dust separator, heat recovery boiler, auxiliary equipments of boiler, charging facility of burning coke, recovery equipments of coke powder, discharging facility of cooling coke, speed-governing and control system of winding engine, electrical control system and equipments, PLC control system (including control software), detecting instrument, dust removal system (the dust separator and its fan and electric motor shall make use of the exiting equipments), main control building, belt conveyor of cooling coke, desalted water station, water circulation pump house, power station and other equipments or construction work as specified in Technical Appendix-Ⅰand Technical Appendix-Ⅲ.
3.2 Fire-fighting: On account of the specificity of the application and approval and inspection procedure for the fire-fighting system, Party B shall be responsible for the design, supply and construction of the fire-fighting system (involving fire-fighting equipments, Fire Alarm System and fire telephone line), and shall assist Party A in the application and approval procedure in local authorities. Party A shall take charge of fire water supply and fire extinguishing material.
3.3 Party A shall take the responsibility to obtain the license for construction planning and the license for construction related to the Project and bear the cost thereof.
