Technical Requirements for Interconnection Sample Clauses

Technical Requirements for Interconnection. 55.3.1. Interconnection at the Embarq Tandem
AutoNDA by SimpleDocs
Technical Requirements for Interconnection. 58.3.1. Interconnection at the Sprint Tandem:
Technical Requirements for Interconnection. 55.3.1. Interconnection at the CenturyLink Tandem
Technical Requirements for Interconnection. 1. Interconnection with LTSI's end office switch (WYMRPAXWDS0) in Waymart, Pennsylvania will provide Teleport Communications America, LLC with local interconnection for Local Traffic to the LTSI WO (codes served by LTSI’s End Office and any LTSI remotes that subtend the End Office).
Technical Requirements for Interconnection. 1. Interconnection with LHTC's end office switch (INHDPAXIDS1) in Indian Head, Pennsylvania will provide Teleport Communications America, LLC with local interconnection for Local Traffic to the LHTC WO (codes served by LHTC’s End Office and any LHTC remotes that subtend the End Office).
Technical Requirements for Interconnection. 2.1. Interconnection with Pymatuning’s end office switch (TRNSPAXTDSO) in Transfer, Pennsylvania will provide Sprint with local interconnection for Local Traffic to the Pymatuning NXX codes served by Pymatuning’s End Office and any Pymatuning remotes that subtend the End Office.
Technical Requirements for Interconnection. 36.3.1. Interconnection to a Sprint Tandem for transit purposes will provide access to telecommunications carriers which are connected to that Tandem Switch.
AutoNDA by SimpleDocs

Related to Technical Requirements for Interconnection

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

Time is Money Join Law Insider Premium to draft better contracts faster.