Temperature cycling test. (a) An unpressurized TPRD is placed in a liquid bath maintained at -40 °C or lower at least two hours. The TPRD is transferred to a liquid bath maintained at +85 °C or higher within five minutes, and maintained at that temperature at least two hours. The TPRD is transferred to a liquid bath maintained at -40 °C or lower within five minutes; (b) Step (a) is repeated until 15 thermal cycles have been achieved; (c) With the TPRD conditioned for a minimum of two hours in the -40 °C or lower liquid bath, the internal pressure of the TPRD is cycled with hydrogen gas between 2 MPa (+1/-0 MPa) and 80 per cent NWP (+2/-0 MPa) for 100 cycles while the liquid bath is maintained at -40 °C or lower; (d) Following the thermal and pressure cycling, the pressure relief device shall comply with the requirements of Leak test (Annex 4, paragraph 1.8.), except that the Leak test shall be conducted at -40 °C (+5/-0 °C). After the Leak test, the TPRD shall comply with the requirements of Bench top activation test (Annex 4, paragraph 1.9.) and then Flow rate test (Annex 4, paragraph 1.10.).
Appears in 6 contracts
Samples: Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations