TEST AND BALANCE Sample Clauses

TEST AND BALANCE. Providing assistance in the utilization of equipment or systems such as testing, adjusting and balancing, preparation of operation and maintenance manuals, training personnel for operation and maintenance and consultation during operation.
TEST AND BALANCE. 7.1 PTJV will assist ▇▇▇▇▇▇▇ with ▇▇▇▇▇▇▇’▇ commissioning, testing and balancing to the extent required by the Agreement.
TEST AND BALANCE. At the completion of each tenant improvement, the HVAC subcontractor or an independent test and balance agency, certified by AABC or ▇▇▇▇, shall provide a complete test and balance document verifying that the specified performance is being achieved.
TEST AND BALANCE o All ventilation and hydronic systems shall be performance tested and balanced to the design specifications. o Balancing shall be done by an independent test and balance (TAB) contractor. o TAB contractor shall provide a written report. o Life safety systems shall be witness tested under actual operating conditions. 16000 ELECTRICAL 1. SITE UTILITIES o Multiple 1500 KVA, 277/480 volt secondary, vault located transformer by NSP Co. Primary cable by NSP Co. o 4 inch PVC empty conduits from telephone Co. vault to MPOP for telephone service. o 4 inch PVC empty conduits from telephone Co. vault to APOP for telephone service. 2. ELECTRICAL SERVICE AND DISTRIBUTION SYSTEM o Multiple 3000 amp, 3 phase, 4 wire secondary services from transformer vaults to switchboards. o Multiple 3000 amp, 3 phase, 4 wire, 277/480 volt switchboards on lower level. NSP metering provisions, fused main and distribution switches, and housekeeping concrete pads. o 3 phase, life safety emergency service, with normal power derived from utility service and emergency power derived from emergency generator set, complete with automatic transfer switches and all generator accessories, to serve life safety requirements. o Plug-in aluminum modular bus duct riser in building core from switchboard to electrical closet. Plug in fused disconnect switches to serve feeders for panelboards, lighting and miscellaneous power loads. 3. PANELBOARDS ANND TRANSFORMERS o Distribution shall be to one electrical room on each floor. Electrical rooms will be stacked. o Circuit breaker panelboards shall be located in the electrical room on each floor to serve electrical loads and the portion of the leased premises on the floor as follows: (1) Provide one 480/277 volt panelboard in the electrical room. Panelboard shall have provision for 42 one pole bolt on breakers. (2) In the electrical room provide two 120/208 volt panelboards with a 112 KVA. Each panelboard will have provisions for 42 one pole bolt-on breakers. 4. GROUNDING SYSTEM o Isolated ground conductor riser for all electrical and telephone/data rooms, originating in the main switchboards, extended through stacked electrical rooms for transformer and miscellaneous ground connections. 5. STANDBY POWER GENERATION SYSTEM o Diesel engine generator system with integral radiator, main circuit breaker, 277/480 volt, 3 phase, 4 wire. o Multiple Automatic Transfer Switches 277/480 volt, 3 phase, for smoke evacuation system, life safety loads, and required elevato...