Common use of TIME OF COMPLETION Clause in Contracts

TIME OF COMPLETION. 18.1 ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. SAID CONTRACT TIME MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER THE CONTRACT DOCUMENTS. IF THE PROJECT IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERM. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE SHALL RESULT IN LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASE. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.

Appears in 9 contracts

Samples: Construction Services Agreement, Construction Services Agreement, Project Construction Services Agreement

AutoNDA by SimpleDocs

TIME OF COMPLETION. 18.1 ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. SAID CONTRACT TIME MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER THE CONTRACT DOCUMENTS. IF THE PROJECT IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERM. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE SHALL RESULT IN LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASE. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.

Appears in 6 contracts

Samples: Project Construction Services Agreement, Construction Services Agreement, Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY , 202_ AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 2 contracts

Samples: Construction Services Agreement, Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY JULY 31, 2024 AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 2 contracts

Samples: Construction Services Agreement, Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY , 20 AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 2 contracts

Samples: Construction Services Agreement, Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY , 2024 AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 1 contract

Samples: Construction Services Agreement

TIME OF COMPLETION. 18.1 ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT THAX XXX XXXXECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. SAID CONTRACT TIME MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER THE CONTRACT DOCUMENTS. IF THE PROJECT IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERM. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE SHALL RESULT IN LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASE. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.

Appears in 1 contract

Samples: Project Construction Services Agreement

AutoNDA by SimpleDocs

TIME OF COMPLETION. 18.1 ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY AUGUST 1, 2021 AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 11, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH. This Section 11 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials In the event that the performance and/or completion of the Project is delayed at any time by any act or omission of District or of any employee, agent, or tenant of District, by any separate contractor employed by District, by changes or alterations in the Project not caused by any fault or omission by Contractor, by strikes, lockouts, fire, embargoes, windstorm, flood, earthquake, acts of war or God, the results of viral pandemics such as shelter-in-place orders, quarantines, government shutdowns, substantial interruption to air travel, substantial interruptions in supply chains, equipment, materials and/or personnel shortages, and other economic by-products caused by the response to an epidemic or pandemic, by changes in public laws, regulations or ordinances enacted after the date of execution of this Construction Services Agreement, by acts of public officials not caused by any fault or omission of Contractor, by an inability to obtain materials or equipment not caused by any act or omission of Contractor, or by any other cause beyond the reasonable control of Contractor, the aforesaid date for substantial completion of the Project shall be extended for a period commensurate with the delay. Contractor shall not be charged liquidated damages because of such delays in completion of work or delays otherwise due to unforeseeable causes beyond the control and without the fault or negligence of Contractor. Contractor will only be allowed a time extension for unusually severe weather if it results in precipitation or other conditions which in the amount, frequency, or duration is in excess of the norm at the location and time of year in question as established by NOAA weather data. A ten (10) year average of the normal seasonal rainfall for the Stanislaus County area, as determined by the National Weather Service, and any resulting “dry-out” time shall not be considered unusually severe weather and therefore will not constitute a reason for a time extension. No less than 22 calendar days will be allotted for in Contractor’s schedule for each winter weather period which is defined as the months, in aggregate of October, November, December, January, February and March. The weather days shall be shown on the Time Schedule and if not used will become float for the Projects’ use. Contractor will not be allowed a day-for-day weather delay when the Contract is bid for construction during a period that normally includes inclement weather. A day-for-day extension will only be allowed for those Days in excess of the norm. Contractor is expected to work seven (7) Days per week (if necessary, irrespective of inclement weather), to maintain access, and to protect the Work under construction from the effects of inclement weather. If the weather is unusually severe in excess of the NOAA data norm and prevents Contractor from beginning work at the usual daily starting time, or prevents Contractor from proceeding with seventy-five percent (75%) of the normal labor and equipment force towards completion of the Day’s current controlling item on the accepted schedule for a period of at least five hours, and the crew is dismissed as a result thereof, Architect/Construction Manager will designate such time as unavoidable delay and grant one (1) calendar-day extension. Contractor shall within ten (10) calendar days of beginning of any such delay notify District in writing of causes of delay. If Contractor submits a request for an extension of time, Contractor shall also submit an analysis of the Time Schedule, which demonstrates the cause for the delay, the length of the delay, and an explanation of why Contractor believes it is entitled to the time extension. Contractor shall also submit documentation, data and a delay analysis showing that the delay could not be avoided or mitigated by revising the Time Schedule. Thereupon District shall ascertain the facts and extent of delay and grant extension of time for completing work when, in its judgment, the findings of fact justify such an extension. District’s findings of fact thereon shall be final and conclusive on the parties hereto. Failure to submit such analysis will result in Contractor waiving his/her right to obtain any extension of time. Extension of time shall apply only to that portion of work affected by the delay, and shall not apply to other portions of work not so affected. Contractor agrees that the extension of time granted under this Article shall be its sole and exclusive remedy for the consequences of any delay described above.

Appears in 1 contract

Samples: Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY AUGUST 31, 2022 AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 1 contract

Samples: Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN COMPLETED BY PURSUANT TO THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. PROVISIONS OF SECTION 5, ABOVE, AS SAID CONTRACT TIME MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY THE DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE DAMAGE. CONTRACTOR HAS OVERSTAYED ITS LEASE TERMSHALL NOT BE ENTITLED TO A BONUS OR INCENTIVE PAYMENT FOR COMPLETING THE PROJECT PRIOR TO . IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1000.00) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS HIS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above is expressly understood and agreed to by the Parties hereto: Contractor’s Initials District’s Initials

Appears in 1 contract

Samples: Construction Services Agreement

TIME OF COMPLETION. 18.1 A. ONCE THE DISTRICT HAS ISSUED A NOTICE TO PROCEED, CONTRACTOR SHALL PROCEED WITH THE CONSTRUCTION OF THE PROJECT WITH REASONABLE DILIGENCE. XXXXXXXXXX CONTRACTOR AGREES THAT THE PROJECT WILL BE SUBSTANTIALLY COMPLETE WITHIN THE CALENDAR DAYS DESIGNATED IN ARTICLE 3 FROM THE NOTICE TO PROCEED. COMPLETED BY , 202_ AS SAID CONTRACT TIME DATE MAY BE EXTENDED FOR SUCH PERIODS OF TIME AS ALLOWED UNDER CONTRACTOR IS PREVENTED FROM PROCEEDING WITH OR COMPLETING THE CONTRACT DOCUMENTSPROJECT FOR ANY CAUSE DESCRIBED IN THIS SECTION 10, OR AS OTHERWISE AGREED TO IN WRITING BY DISTRICT AND CONTRACTOR. IF THE PROJECT WORK IS NOT SUBSTANTIALLY COMPLETED IN ACCORDANCE WITH THE FOREGOING, IT IS UNDERSTOOD THAT THE DISTRICT WILL SUFFER DAMAGE SINCE CONTRACTOR HAS OVERSTAYED ITS LEASE TERMDAMAGE. IT BEING IMPRACTICAL AND INFEASIBLE TO DETERMINE THE AMOUNT OF ACTUAL DAMAGE, IT IS AGREED THAT CONTRACTOR’S EXTENSION OF THE LEASE CONTRACTOR SHALL RESULT IN PAY TO DISTRICT AS FIXED AND LIQUIDATED DAMAGES, AND NOT AS A PENALTY, THE SUM SET FORTH IN ARTICLE 3 OF ONE THOUSAND DOLLARS ($1,000) PER DAY FOR EACH CALENDAR DAY OF DELAY UNTIL WORK IS SUBSTANTIALLY COMPLETEDCOMPLETED AND ACCEPTED. CONTRACTOR AND ITS SURETY SHALL BE LIABLE FOR THE AMOUNT THEREOF. ANY MONEY DUE OR TO BECOME DUE THE CONTRACTOR MAY BE RETAINED BY THE DISTRICT TO COVER SAID LIQUIDATED DAMAGES FOR OVERSTAYING THE LEASEDAMAGES. SHOULD SUCH MONEY NOT BE SUFFICIENT TO COVER SAID LIQUIDATED DAMAGES, THE DISTRICT SHALL HAVE THE RIGHT TO RECOVER THE BALANCE FROM THE CONTRACTOR OR ITS SURETIES, WHO WILL PAY SAID BALANCE FORTHWITH.. This Section 10 and the liquidated damages referred to directly above are expressly understood and agreed to by the parties hereto: Contractor’s Initials District’s Initials

Appears in 1 contract

Samples: Construction Services Agreement