Traffic Impact Studies Sample Clauses

Traffic Impact Studies. DISTRICT shall fully comply with the following: (1) DISTRICT shall fully finance and cause the completion of a Traffic Impact study to determine if a traffic signal is Warranted at ▇▇▇▇▇ ▇▇▇▇▇▇ and ▇▇▇▇▇▇ Road and provide said study to CITY as soon as it becomes necessary in order to promote public health, safety, and welfare or immediately upon reasonable request made by the City Administrator or the City Engineer, whichever occurs sooner. This provision shall not be construed to limit the number of studies that may be requested or conducted provided that such requests are reasonable. (2) DISTRICT shall timely reimburse CITY for the reasonable costs paid by City, if any, for contracting a third-party review of every Traffic Impact Study that is submitted to CITY pursuant to this Agreement. Said third-party review shall be conducted by a third-party reviewer of CITY’s choosing.
Traffic Impact Studies. In the event that CITY approves the necessary applications to replat and rezone Outlot A into developable lots, DEVELOPER, its successors, or assigns shall fully comply with the following: (1) DEVELOPER, its successors, or assigns shall fully finance and cause the completion of a Traffic Impact study to determine if a third lane is Warranted for ▇▇▇▇▇▇ Road and provide said study to CITY as soon as it becomes necessary in order to promote public health, safety, and welfare or immediately upon reasonable request made by the City Administrator or the City Engineer, whichever occurs sooner. This provision shall not be construed to limit the number of studies that may be requested or conducted provided that such requests are reasonable. (2) DEVELOPER, its successors, or assigns shall timely reimburse CITY for the reasonable costs paid by City, if any, for contracting a third-party review of every Traffic Impact Study that is submitted to CITY pursuant to this Agreement. Said third- party review shall be conducted by a third-party reviewer of CITY’s choosing.
Traffic Impact Studies. DISTRICT shall fully comply with the following: (1) DISTRICT shall fully finance and cause the completion of a Traffic Impact study to determine whether: (1) a traffic signal is Warranted at Gold Coast Road and Highway 50, (2) construction of Gold Coast Road between 150th Street and Highway 50 is Warranted, or (3) construction of ▇▇▇▇▇ ▇▇▇▇▇▇ between Gold Coast Road and ▇▇▇▇▇▇▇ Street is Warranted, and provide said study to CITY as soon as it becomes necessary in order to promote public health, safety, and welfare or immediately upon request made by the City Administrator or the City Engineer, whichever occurs sooner. This provision shall not be construed to limit the number of studies that may be requested or conducted. (2) DISTRICT shall timely reimburse CITY for the Cost of contracting a third-party review of every Traffic Impact Study that is submitted to CITY pursuant to this Agreement. Said third-party review shall be conducted by a third-party reviewer of CITY’s choosing.
Traffic Impact Studies. Additional traffic counts. All traffic counts will be obtained from the traffic study for this project. Maintenance and Protection of Traffic/Traffic Control Plans/Temporary Traffic Signal Plans. Services related to a Permit for Temporary Closure of Sidewalks and/or Roadway Lanes. Structural design (e.g., bridges, culverts, retaining walls, sound barriers, joint details, sheeting and shoring, sign structures), or structural inspection. Geotechnical design. Pavement Design. Soil borings, roadway borings, or related permits. Erosion and Sedimentation Control Plans/Narrative. Post Construction Stormwater Management Plans/Narrative. Infiltration Testing, Analysis, or Design. Right-of-Way or Property/Deed Research beyond what is completed by the Project Surveyor. Right-of-Way Plans, or any services related to right-of-way acquisition or traffic signal easements, such as coordination with neighboring property owners, metes-and-bounds descriptions, preparation of exhibits, etc. Design of new or relocated utility facilities (above-ground or underground). Obtaining permits for utility relocations, utility installations, or subsurface utility engineering. Subsurface Utility Engineering (▇▇▇), underground facility location, subsurface investigation of any type. PUC or railroad coordination. Preparation of construction quantities, tabulation sheets, summary sheets, construction cost estimates, or specifications/special provisions. Design services during construction including, but not limited to, contractor submittal review. Construction bid services, such as bid package preparation or contract preparation. Construction management/monitoring services, or consultation during construction. Construction inspection services. As-built traffic signal plans. Detailed Maintenance and Protection of Traffic Plans Detailed ADA Curb Ramp Plans and Documents Any service requested that is not described in the above Scope of Services section will be billed on an hourly basis according to the current fee schedule, plus expenses. Before proceeding with such services, TPD will inform Client of the need for additional services. This proposal does not include the cost of modifications to the plans due to design changes. These items will be billed on an out-of-scope basis. TPD is not responsible for time delays due to these changes. The following tasks will be completed by TPD in preparing the Design for this project.
Traffic Impact Studies. MPO staff shall provide support and assist the HOST PROVIDER with the review of traffic impact studies on HOST PROVIDER facilities.
Traffic Impact Studies. DKS prepares traffic impact studies for environmental documents and also reviews traffic impact studies prepared by others. The DKS Sacramento office has not worked for any local developers since it opened in 1989 and this has no conflicts of interest. In addition to traffic impact studies for development projects, we can prepare traffic impact studies for roadway improvements and transit facility projects.