Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). 2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance. 2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom. 2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom or BellSouth provides ninety
Appears in 2 contracts
Samples: Clec Agreement, Adoption Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTelepak Networks.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Telepak Networks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Telepak Networks or BellSouth provides ninety
Appears in 2 contracts
Samples: Clec Agreement, Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAzul Tel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Azul Tel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Azul Tel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomACI.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ACI to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ACI or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNOW.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NOW to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NOW or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomMTS Communications.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom MTS Communications to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom MTS Communications or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomICG.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ICG to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ICG or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomWorldxChange.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom WorldxChange to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom WorldxChange or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomClearwave Communications.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Clearwave Communications to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Clearwave Communications or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBSE.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom BSE to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom BSE or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFPB.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom FPB to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom FPB or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCBX One-Stop.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom CBX One-Stop to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom CBX One-Stop or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCCI.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom CCI to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom CCI or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomMyLineToo.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom MyLineToo to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom MyLineToo or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomRing Connection.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Ring Connection to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Ring Connection or BellSouth provides ninety
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNTBS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NTBS to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NTBS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomEPICUS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom EPICUS to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom EPICUS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern USA Telecom., Inc..
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom USA Telecom, Inc. to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom USA Telecom, Inc. or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomINET.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom INET to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom INET or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomStarlink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Starlink to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Starlink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAdvantage Group.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Advantage Group to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Advantage Group or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFLATEL.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom FLATEL to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom FLATEL or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomPLI.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom PLI to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom PLI or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomABC Telcom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ABC Telcom to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ABC Telcom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomVertex.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Vertex to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Vertex or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomGrande.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Grande to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Grande or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern TelecomTCG.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom TCG to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom TCG or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomColumbus Local.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Columbus Local to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Columbus Local or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTriarch Marketing.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Triarch Marketing to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Triarch Marketing or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomThink 12.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Think 12 to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Think 12 or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom.C.M..
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom C.M. to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom C.M. or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomVictory.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Victory to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Victory or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomSPARDI.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom SPARDI to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom SPARDI or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomDeland Actel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Deland Actel to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Deland Actel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCharter.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Charter to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Charter or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomMicro-Comm.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Micro-Comm to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Micro-Comm or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomRuddata.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Ruddata to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Ruddata or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNex-Phon.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Nex-Phon to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Nex-Phon or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAmTel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AmTel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AmTel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomComm South.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Comm South to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Comm South or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomXxxxxxxx.Xxx.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Xxxxxxxx.Xxx to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Xxxxxxxx.Xxx or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomEZ Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom EZ Phone to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom EZ Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTeleConex.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom TeleConex to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom TeleConex or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomUS LEC.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom US LEC to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreementlast signatory date hereof, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement last signatory date hereof will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreementlast signatory date hereof. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement last signatory date hereof may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom US LEC or BellSouth provides ninetyninety (90) calendar days written notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBudget Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Budget Phone to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Budget Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomInternational Telnet.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom International Telnet to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom International Telnet or BellSouth provides ninety
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomMetro Teleconnect.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Metro Teleconnect to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Metro Teleconnect or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomLightning Communications.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Lightning Communications to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Lightning Communications or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern TelecomAT&T AND TC SYSTEMS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AT&T AND TC SYSTEMS to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AT&T AND TC SYSTEMS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomOnePoint Communications.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom OnePoint Communications to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom OnePoint Communications or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCovista.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Covista to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Covista or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomXxxx.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Xxxx to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Xxxx or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern Telecom.AT&T.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AT&T to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AT&T or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBULLSEYE.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom BULLSEYE to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom BULLSEYE or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomEZ Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom EZ Phone to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom EZ Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomDeland Actel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Deland Actel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Deland Actel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomSail Networks.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Sail Networks to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Sail Networks or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFreedom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Freedom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Freedom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomQuality Telephone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Quality Telephone to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Quality Telephone or BellSouth provides ninety
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomXxxx.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Xxxx to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Xxxx or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNationsLink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NationsLink to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NationsLink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBAK.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom BAK to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom BAK or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom1-800-RECONEX.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom 1-800-RECONEX to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom 1-800-RECONEX or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Solution Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Solution Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Solution Telecom or BellSouth provides ninety
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomACN.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ACN to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ACN or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecome-Tel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom e-Tel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom e-Tel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern USA Telecom., Inc..
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom USA Telecom, Inc. to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom USA Telecom, Inc. or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomOnePoint.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom OnePoint to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom OnePoint or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomConextel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Conextel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Conextel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomPilgrim Telephone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Pilgrim Telephone to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Pilgrim Telephone or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Coral Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Coral Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Coral Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCOMTECH21.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom COMTECH21 to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom COMTECH21 or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNexus.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Nexus to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Nexus or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomUtility USA.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Utility USA to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Utility USA or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomLight.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Light to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Light or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTWTC.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom TWTC to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom TWTC or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomHotline.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Hotline to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Hotline or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomXxx.Xxx.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Xxx.Xxx to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Xxx.Xxx or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomInterGlobe.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom InterGlobe to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom InterGlobe or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCBX One-Stop.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom CBX One-Stop to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom CBX One-Stop or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFeroNetworks.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom FeroNetworks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom FeroNetworks or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTelson.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Telson to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Telson or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomJCM.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom JCM to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom JCM or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTel West.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Tel West to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Tel West or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomRent-A-Line.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Rent-A-Line to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Rent-A-Line or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomGateway.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Gateway to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Gateway or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomConnectNow!.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ConnectNow! to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ConnectNow! or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomStarlink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Starlink to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Starlink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomSymtelco.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Symtelco to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Symtelco or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomVelocity.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Velocity to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Velocity or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Sail Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Sail Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Sail Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAmeriMex.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AmeriMex to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AmeriMex or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom.C.M..
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom C.M. to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom C.M. or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomDPI Teleconnect.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom DPI Teleconnect to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom DPI Teleconnect or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomUnity Acquisition.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Unity Acquisition to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Unity Acquisition or BellSouth provides ninety
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNewcomm.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Newcomm to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Newcomm or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAirCover.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AirCover to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AirCover or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomONS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ONS to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ONS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Samples: Interconnection Agreement