UNDERGROUND OBSTACLES Sample Clauses

UNDERGROUND OBSTACLES. Contractor shall be responsible for ascertaining the location of and avoiding damage to all underground installations including without limitation cable, gas, water pipes, telephone lines, and other underground installations, whether the location of the excavation, digging, or trenching required for performance of the Work is fixed by Company or by Contractor.
AutoNDA by SimpleDocs
UNDERGROUND OBSTACLES. The Contractor shall make every effort to locate all underground pipelines, conduits, cables and structures, and shall contact owners of the underground installations and by prospecting in advance of excavation. The repair of existing installations cut or damaged by the Contractor shall be made at the sole cost and expense of the Contractor, and shall be scheduled so as to cause the least possible inconvenience to the public and to the owners of the installations.
UNDERGROUND OBSTACLES. Consultant shall be responsible for ascertaining the location of and avoiding damage to all underground installations including without limitation cable, gas, water pipes, telephone lines, and other underground installations, whether the location of the excavation, digging, or trenching required for performance of the Work is fixed by Company or by Consultant.‌

Related to UNDERGROUND OBSTACLES

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Hazardous Substances The words "Hazardous Substances" mean materials that, because of their quantity, concentration or physical, chemical or infectious characteristics, may cause or pose a present or potential hazard to human health or the environment when improperly used, treated, stored, disposed of, generated, manufactured, transported or otherwise handled. The words "Hazardous Substances" are used in their very broadest sense and include without limitation any and all hazardous or toxic substances, materials or waste as defined by or listed under the Environmental Laws. The term "Hazardous Substances" also includes, without limitation, petroleum and petroleum by-products or any fraction thereof and asbestos.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.