Unit Root Test Sample Clauses

Unit Root Test. Xxxxxxx-Xxxxxx Unit root test approach was used to establish the integration order of each of the research. Hence, the results of the tests for each of the variables in models with intercept are presented in Table 1 at both logarithmic their first difference levels. Table 2: Test Results for Philips Xxxxx Unit Root Unit root test at logarithmic levels H0: b = 0; Ha: b > 0 Variables Critical value @5% Philips Xxxxx test statistics Remarks Order of Integration lnRGDP -3.052169 -4.092715 Stationary I(0) lnGDPIS -3.052169 -4.905193 Stationary I(0) lnINSTA -3.052169 -1.248354 Non-stationary Nil lnINSTC -3.052169 -0.349777 Non-stationary Nil Unit root test result at first differences Variables Critical value @5% Philips Xxxxxx test statistics Order of Integration lnRGDP - - Stationary I(0) lnGDPIS - - Stationary I(0) lnINSTA 3.065585 -3.073419 Stationary I(1) lnINSTC 3.065585 -9.445244 Stationary I(1) Source: Authors’ Computation, 2022 Notes: *Denotes significance at the 5% level and the rejection of the null hypothesis of non-stationarity. Table 2 reveals that the variables of interest are mixture of order I(0) and I(1) i.e at logarithmic level, RGDP and RGDPIS were stationary while INSTA and INSTC were stationary at first difference. This is a prerequisite for employing ARDL as an estimation technique according to Xxxxxxxx and Xxxx (2001).
AutoNDA by SimpleDocs

Related to Unit Root Test

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is a NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASPP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram, , the English Language Proficiency Assessments for California (“ELPAC”), and as appropriate to the student, and mandated by LEA pursuant to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Performance Improvement Process 9.5.1 The purpose of the Performance Improvement Process is to remedy or mitigate the impact of a Performance Factor. The Performance Improvement Process may include: a requirement that the Hospital develop an Improvement Plan; or an amendment of the Hospital’s obligations as mutually agreed by the parties.

Time is Money Join Law Insider Premium to draft better contracts faster.