Utility Identification Clause Samples

Utility Identification. 21 Developer shall verify the location of all Utilities within the Project Limits or otherwise affected by the City of Phoenix ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇.▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ City of ▇▇▇▇▇▇▇▇ ▇▇▇▇ Ishida- ▇▇▇▇▇▇▇▇ ▇▇▇▇.ishida- ▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ City of Tempe ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇_▇▇▇▇▇@▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Air Products ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (480) 899-7000 ext. 25 Southwest Gas Scott Suaso ▇▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇ steve_weatherhead@kindermorga ▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Century Link ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Terra Technologies (on behalf of Century Link) ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Cox Communications ▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇▇@▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ SRP Project Manager ▇▇▇▇ ▇▇▇▇ ▇▇▇▇.▇▇▇▇@▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ SRP Irrigation ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ SRP Transmission Curtis Chaney ▇▇▇▇▇▇.▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ SRP Distribution ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ APS ▇▇▇▇▇ Garza ▇▇▇▇▇▇▇▇.▇▇▇▇▇@▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ AT&T Long Hall Communications ▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ AT&T Local Networks Communications ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇@▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Sprint ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ MCI Verizon ▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇.▇▇▇▇▇@▇▇▇▇.▇▇▇ ▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ ADOT ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇@▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ United Dairymen of Arizona ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ (Ex El Pipeline Services) ▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ Level 3 ▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (▇▇▇) ▇▇▇-▇▇▇▇ 1 It is the responsibility of Developer to ensure that all Utilities within the Project Limits have been 2 designated and included in the CAD base file(s). Developer will be responsible for potholes as necessary 3 to confirm utility locations and conflicts. Developer shall perform up to 40 potholes as directed by SRP to 4 aide in the design and relocation of their facilities in accordance with Section 5.4.2.10 of the Agreement. 5 All Utility designation, including potholes, shall follow the American Society of Civil Engineers Standard 6 Guidelines for the Collection and Depiction of Existing Subsurface Utility Data (CI/ASCE 38-02). All 7 pothole information shall be provided to ADOT within 30 Business Days of the pothole being performed. 8 Developer sh...
Utility Identification. ‌ 13 Developer shall verify the location of all Utilities within the Project limits or otherwise affected by 14 the Work. Utility Companies known to have facilities within the Project limits include the 15 following:
Utility Identification. ‌ 11 Developer shall verify the location of all Utilities within the Project limits or otherwise affected by 12 the Work. Utility Companies known to have facilities within the Project limits include the 13 following: 14 A. Arizona Public Service – 230 kV power; 15 B. AT&T – fiber optic; 16 C. CenturyLink – telephone and fiber optic; 17 D. City of Phoenixwater and sewer; also maintains Laveen Area Conveyance Channel; 18 ▇. ▇▇▇ Communications – cable and fiber optic; 19 ▇. ▇▇▇▇▇▇ ▇▇▇▇▇▇ El Paso Natural Gas – pipeline for natural gas; 20 ▇. ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ – pipelines for petroleum; 21 H. Level3 (and former ▇▇▇▇▇▇▇▇) – fiber optic; 22 I. Peninsula-▇▇▇▇▇▇▇▇ – irrigation; 23 J. Privately held irrigation conveyance facilities that serve multiple properties; 24 ▇. ▇▇▇▇▇▇▇▇▇ Irrigation District – irrigation canal and pipes; 25 L. Salt River Project Irrigation – irrigation pipelines, ditches, and ▇▇▇▇▇; 26 M. Salt River Project Power – 500 kV, 230 kV, 69 kV, 12 kV, and primary power; ▇▇ ▇. ▇▇▇▇▇▇▇▇▇ Gas – pipelines for natural gas; 28 O. Sprint – fiber optic; 29 P. Verizon (and former MCI) – fiber optic; 30 Q. Western Area Power Administration – 230 kV power; and 31 R. Zayo Group – fiber optic. 32 Developer shall ensure that all Utilities within the Project ROW have been designated and 33 included in the base CAD file(s). Permit logs that may contain additional information are 34 available from ADOT, Maricopa County, and City of Phoenix for review.