Vibration Monitoring for Historical Buildings Sample Clauses

Vibration Monitoring for Historical Buildings. The appropriate vibration monitoring on the affected built heritage resources will be agreed with BD/ GEO under the requirement of the Building Ordinance. The project proponent should ensure that vibration levels are controlled to levels not exceeding 25mm/s or other appropriate level. Vibration monitoring should be carried out by the contractor. The following structures would require monitoring during the construction phase; , Old Xxxxxxxx Xxxxxxx Former Explosive Magazine (GB-6), Old Victoria Barracks Xxxxxxxxxx Block (GB-7), Old Victoria Barracks Xxxxxxx Block (GB-8), Old British Military Hospital Main Building and Annex (GB-5), Xxxx Xxxxx Temple on Ap Xxx Xxxx (GB-1), Old Victoria Barracks Block GG (ADM-1), Earth God Shrine on Ap Xxx Xxxx (ALC-2) and Remains of the former Aberdeen Barracks on Ap Xxx Xxxx (ALC-3).
AutoNDA by SimpleDocs

Related to Vibration Monitoring for Historical Buildings

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Building Services 7.01 Landlord shall furnish Tenant with the following services: (a) hot and cold water for use in the Base Building lavatories and drinking purposes; (b) customary heat and air conditioning in season during Building Service Hours (, although (i) Tenant shall have the right to receive HVAC service during hours other than Building Service Hours by paying Landlord’s then standard charge for additional HVAC service and providing such prior notice as is reasonably specified by Landlord (Landlord’s current charge for afterhours HVAC is $60 per hour, subject to change by Landlord from time to time), and (ii) if Tenant is permitted to connect any supplemental HVAC units to the Building’s condenser water loop or chilled water line, such permission shall be conditioned upon Landlord having adequate excess capacity from time to time and such connection and use shall be subject to Landlord’s reasonable approval and reasonable restrictions imposed by Landlord, and Landlord shall have the right to charge Tenant a connection fee and/or a monthly usage fee, as reasonably determined by Landlord; (c) standard janitorial service on Business Days; (d) unattended elevator service; (e) electricity in accordance with the terms and conditions in Section 7.02; (f) access to the Building for Tenant and its employees 24 hours per day/7 days per week, subject to the terms of this Lease and such protective services or monitoring systems, if any, as Landlord may reasonably impose, including, without limitation, sign-in procedures and/or presentation of identification cards; and (g) subject to Section 26.10, such other services as Landlord reasonably determines are necessary or appropriate for the Property. If Landlord, at Tenant’s request, provides any services which are not Landlord’s express obligation under this Lease, including, without limitation, any repairs which are Tenant’s responsibility pursuant to Section 9 below, Tenant shall pay Landlord, or such other party designated by Landlord, the cost of providing such service plus an administrative charge of ten percent (10%), the same to constitute Additional Rent hereunder. 7.02 Electricity used by Tenant in the Premises shall, at Landlord’s option, be paid for by Tenant by a separate, flat-rate charge (except the same may be increased as hereinafter provided in this Section 7.02) payable by Tenant to Landlord monthly with Rent, initially estimated (at the rate of $1.50 per rentable square foot of the Premises) to be in the amount of $1,633.25 per month ($19,599.00 per annum), payable as Additional Rent hereunder. Landlord shall have the right from time to time to reasonably increase such monthly flat-rate amount payable by Tenant hereunder based on actual increases in the cost of electricity (and/or the generation thereof) to Landlord in connection with the Property with no xxxx up by Landlord. Without the consent of Landlord, Tenant’s use of electrical service shall not exceed the Building standard usage of six (6) xxxxx per square foot, as reasonably determined by Landlord, based upon the Building standard electrical design load. Landlord shall have the right to measure electrical usage by commonly accepted methods, including the installation of measuring devices such as submeters and check meters. If it is determined that Tenant is using electricity in such quantities or during such periods as to cause the total cost of Tenant’s electrical usage, on a monthly, per-rentable-square-foot basis, to materially exceed that which Landlord reasonably deems to be standard for the Building, Tenant shall pay Landlord Additional Rent for the cost of such excess electrical usage and, if applicable, for the cost of purchasing and installing the measuring device(s). 7.03 Landlord’s failure to furnish, or any interruption, diminishment or termination of services due to the application of Laws, the failure of any equipment, the performance of maintenance, repairs, improvements or alterations, utility interruptions or the occurrence of an event of Force Majeure (defined in Section 26.03) (collectively a “Service Failure”) shall not render Landlord liable to Tenant, constitute a constructive eviction of Tenant, give rise to an abatement of Rent, nor relieve Tenant from the obligation to fulfill any covenant or agreement. Notwithstanding the foregoing, if all or any portion of the Premises is rendered Untenantable (as defined below) solely as a result of the failure of any Essential Service (as defined below) due to Landlord’s negligence or willful misconduct and Tenant does not use or occupy the same during said period, then Tenant’s obligation pay Base Rent and Additional Rent hereunder shall be abated in proportion to the portion of the Premises rendered Untenantable until the date on which such Untenantability is cured, provided that such abatement shall not commence until the fifth (5th) Business Day after the date on which Tenant delivers written notice to Landlord of the interruption and an opportunity, within such five (5) Business Day period, to cure same. The rate at which Base Rent or Additional Rent may be abated under this Section 7.03 in any one calendar month shall not exceed twenty-five percent (25%) of the Base Rent payable for such calendar month, provided that any amount not permitted to be taken as an abatement as a result of such monthly cap shall be credited against the Base Rent or Additional Rent next thereafter due under this Lease, subject to such monthly cap. In the event that the foregoing monthly cap would have the effect of depriving Tenant of any portion of abatement to which it is otherwise entitled hereunder due to the number of calendar months remaining in the term, the monthly cap may be increased proportionately to the extent necessary to avoid such result.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Building Systems The term "Building Systems" means all systems serving the Building in general, including, but not limited to, the fire/life safety, electrical, plumbing, HVAC, including all components thereof and related equipment, including any distribution systems or equipment existing within the Premises.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!