WALKWAYS REQUIRED. Parallel to the outer side of each exterior track of multiple operated track and on each side of single operated track, an unobstructed continuous space suitable for trainman's use in walking along trains, extending in width not less than twelve feet (12') perpendicular from centerline of track, shall be maintained. Any temporary impediments to walkways and track drainage encroachments or obstructions allowed during working hours must be covered, guarded and/or protected as soon as practical. Walkways with railings shall be constructed by the Contractor over open excavation areas when in close proximity of track, and railings shall not be closer than 9' perpendicular from the center line of tangent track or 9' – 6" horizontal from curved track.
Appears in 2 contracts
Samples: Public Highway Overpass Agreement, Public Pedestrian Overpass Agreement
WALKWAYS REQUIRED. Parallel to the outer side of each exterior track of multiple operated track and on each side of single operated track, an unobstructed continuous space suitable for trainman's ’s use in walking along trains, extending in width not less than twelve feet (12'’) perpendicular from centerline of track, shall be maintained. Any temporary impediments to walkways and track drainage encroachments or obstructions allowed during working hours must be covered, guarded and/or protected as soon as practical. Walkways with railings shall be constructed by the Contractor over open excavation areas when in close proximity of track, and railings shall not be closer than 9' ’ perpendicular from the center line of tangent track or 9' ’ – 6" ” horizontal from curved track.
Appears in 2 contracts
Samples: Contractor’s Right of Entry Agreement, Railroad Relations Agreement
WALKWAYS REQUIRED. Parallel to the outer side of each exterior track of multiple operated track and on each side of single operated track, an unobstructed continuous space suitable for trainman's ’s use in walking along trains, extending in width not less than twelve fifteen feet (12'15’) perpendicular from centerline of track, shall be maintained. Any temporary impediments to walkways and track drainage encroachments or obstructions allowed during working hours must be covered, guarded and/or protected as soon as practical. Walkways with railings shall be constructed by the Contractor over open excavation areas when in close proximity of track, and railings shall not be closer than 9' ’ perpendicular from the center line of tangent track or 9' ’ – 6" ” horizontal from curved track.
Appears in 1 contract
Samples: Public Highway Overpass Agreement