Waste Water Treatment Locations Sample Clauses

Waste Water Treatment Locations. The existing sewerage system drains into a sewerage treatment plant located next to the Kiambu Golf Estate along the Riara River. Developments in the neighbouring ridges and south of the treatment plant use onsite sewage treatment techniques. Due to the proximity of this site to the township, and the prohibitive cost of land in the area, construction of a new Sewage Treatment Works has not been considered. The following options have been evaluated for the Kiambu Sewage Treatment Works location;
AutoNDA by SimpleDocs

Related to Waste Water Treatment Locations

  • Substance Abuse Treatment Information Substance abuse treatment information shall be maintained in compliance with 42 C.F.R. Part 2 if the Party or subcontractor(s) are Part 2 covered programs, or if substance abuse treatment information is received from a Part 2 covered program by the Party or subcontractor(s).

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Emergency Transportation Ambulance services for emergencies.

  • Cleanliness and Safety; Entry Resident agrees to maintain the assigned bedroom space, the apartment and the common areas of the Property in a clean, safe and sanitary condition, to exercise all due care in the use of same, and to cooperate fully with the Property pest control program as requested. Resident will be responsible for the cost of treatment for bedbugs and similar pests to the extent Owner’s pest control vendor reasonably determines that an infestation has originated within Resident’s assigned space and during Resident’s occupancy. Resident will place all trash in provided receptacles and will be responsible for the cost of cleaning the interior or exterior of the apartment if not kept in sanitary condition. When outdoor temperatures are below 40 degrees Fahrenheit, Resident will keep the apartment’s heat turned on to prevent frozen or burst pipes, including during vacations. When outdoor temperatures exceed 85 degrees Fahrenheit, Resident will keep the apartment’s air conditioning turned on and set to a reasonable temperature to prevent mold or mildew growth, including during vacations. Owner and its agents, employees and contractors may enter any apartment and bedroom space to perform routine maintenance, inspections, showings and other ordinary functions, provided that Owner will provide advance notice to residents of an apartment before such entry. Owner reserves the right to enter an apartment and any bedroom space without prior notice (including a passkey and/or disarming the alarm or other means of entry if locks have been changed) for emergency maintenance or repair purposes, or when there is reasonable cause to believe that a situation exists that could cause danger to life, safety, health or property. Owner may confiscate any item deemed to cause a danger and is under no obligation to pay compensation for or to return such items.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Surface Treatments The Project Area is covered by a layer of mulch permeable to air and water, including, but not limited to rock, bark, ungrouted stepping stones and artificial turf manufactured to be permeable or a high- density planting of living groundcover plants. There are no impermeable barriers that would inhibit the passage of air and/or water to the soil. APN: 161-06-701-001 When Recorded, Return To: Southern Nevada Water Authority Conservation Division P.O. Box 99956 MS 110 Las Vegas, Nevada 89193-9956 EXHIBIT “D” CONSERVATION EASEMENT This Grant of Conservation Easement (“Easement”) is made by the Xxxxx County School District, a political subdivision of the State of Nevada, as the grantor, (“Owner”) and the Southern Nevada Water Authority (“Authority”), a political subdivision of the State of Nevada, as the holder.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Fire, Life Safety, and Accessibility Codes The following codes, in the versions approved by the Georgia State Fire Marshal/Fire Safety Commissioner and Department of Human Resources, shall be used. The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

Time is Money Join Law Insider Premium to draft better contracts faster.