Water Proofing System Sample Clauses

Water Proofing System. Sheet waterproofing membrane systems for the tunnel shall comprise of a geotextile fleece fixed to the primary lining substrate in combination with a sheet waterproofing membrane fastened to this. Waterproofing shall be applied to crown and sidewalls above footing or invert arch level. The waterproofing membrane shall always be located between shotcrete support and final concrete lining. As the underground structures referred to be not immersed below a distinct groundwater table no membrane waterproofing will be provided for tunnel inverts. The design life of the water proofing membrane shall be minimum 100 years. Where the waterproofing system is to be divided into sectors, the water stops should be formed of material that can be welded to the sheet waterproofing membrane. Additional drainage capacity shall be provided in case of water inflows in agreement with the Employer’s Representative by studded drainage membrane made from thermoplastic material (dimpled sheet) attached prior to installation of the geotextile fleece or equivalent drainage layer approved by the Employer’s Representative. Waterproof membranes shall not be stored in direct sunlight prior to use. Waterproof membranes shall be protected from damage at all times especially during installation of reinforcement. The water proofing membrane shall have a signal layer to indicate damages due to handling and installation of reinforcement. The integrity of the signal layer shall be checked prior to concreting of final lining. Fire protection measures during construction of water proofing system are required as but not limited to the following. - The amount of membrane stored in the tunnel shall not exceed two working day’s production to minimize the fire load stored underground. - The installation length of the water proofing system in advance of the final lining shall not exceed 300 m, unless special measures are considered in agreement with the Employer’s Representative. The waterproof membrane shall consist of a continuous impermeable heat-welded sheet of one of the following materials: - soft polyvinyl chloride (PVC) unreinforced - flexible polyolefin (FPO/TPO) unreinforced The membrane as supplied shall be of such dimensions and shape as will result in the minimum of on-site seam welds. The installation of recycled membranes and/or membranes including DEHP (DOP) plasticizer is not permitted. Table of Contents
AutoNDA by SimpleDocs

Related to Water Proofing System

  • Filing Systems and Equipment A complete and comprehensive catalog of filing systems including vertical and lateral files, bookcases, mobile cabinets and freestanding file cabinets.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Unbundled Network Elements 35.4.1. The charges that CLEC shall pay to Sprint for Unbundled Network Elements are set forth in Table One of this Agreement. 35.5. Collocation

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Site Safety Buyer shall comply with all federal, state, and local safety regulations and standards applicable to the Site and to the Equipment on which Siemens will perform the Services. Siemens shall not be obligated to commence or perform Services unless Buyer’s Site complies with all applicable safety requirements. In the event Buyer’s Site safety is non- compliant, Siemens may suspend the Services until such time as Buyer corrects the non-compliance. To the extent Siemens incurs additional time and expense as the result of Buyer’s non-compliance, Siemens shall be entitled to an equitable adjustment in the schedule, price and other affected provisions of the Agreement.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

Time is Money Join Law Insider Premium to draft better contracts faster.