Well No. 12 and Well No Sample Clauses

Well No. 12 and Well No. 19 Pumping Units Number (GPM) (Feet)
AutoNDA by SimpleDocs

Related to Well No. 12 and Well No

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Dedicated Transport A DS0-, DS1-, or DS3-capacity transmission facility between Verizon switches (as identified in the LERG) or UNE Wire Centers, within a LATA, that is dedicated to a particular end user or carrier. Dedicated Transport is sometimes referred to as dedicated interoffice facilities ("IOF"). Dedicated Transport does not include any facility that does not connect a pair of Verizon UNE Wire Centers.

  • PRODUCTION DEFINITELY DISCONTINUED If the holder of the approval completely ceases to manufacture a type of vehicle approved in accordance with this Regulation, he shall so inform the authority which granted the approval, which in turn shall forthwith inform the other Contracting Parties to the Agreement applying this Regulation by means of a communication form conforming to the model in Annex 1 to this Regulation.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (“DAMLs”), and may have up to 6,000 feet of bridged tap between the end user’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For loops less than 18,000 feet and with less than 1300 Ohms resistance, the loop will provide a voice grade transmission channel suitable for loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Make Up process is not required to order and provision the UCL-ND. However, Lightyear can request Loop Make Up for which additional charges would apply. 2.4.3.3 At an additional charge, BellSouth also will make available Loop Testing so that Lightyear may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit B of this Attachment. 2.4.3.4 UCL-ND loops are not intended to support any particular service and may be utilized by Lightyear to provide a wide-range of telecommunications services so long as those services do not adversely affect BellSouth’s network. The UCL-ND will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the loop to the customer’s inside wire. 2.4.3.5 Order Coordination (OC) will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. Order Coordination -Time Specific (OC-TS) does not apply to this product. 2.4.3.6 Lightyear may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove bridge tap and/or load coils from any loop within the BellSouth network. Therefore, some loops that would not qualify as UCL-ND could be transformed into loops that do qualify, using the ULM process.

  • Funding Restrictions and Order Quantities The Agency reserves the right to reduce or increase estimated or actual quantities in whatever amount necessary without prejudice or liability to the Agency, if: 12.3.1 Funding is not available; 12.3.2 Legal restrictions are placed upon the expenditure of monies for this category of service or supplies; or, 12.3.3 The Agency’s requirements in good faith change after award of the contract.

  • DISADVANTAGED BUSINESS ENTERPRISE OR HISTORICALLY UNDERUTILIZED BUSINESS REQUIREMENTS The Engineer agrees to comply with the requirements set forth in Attachment H, Disadvantaged Business Enterprise or Historically Underutilized Business Subcontracting Plan Requirements with an assigned goal or a zero goal, as determined by the State.

  • TRANSFER AND SUB-CONTRACTING 31.1 This Framework Agreement is personal to the Supplier and the Supplier shall not assign, novate or otherwise dispose of or create any trust in relation to any or all rights and obligations under this Framework Agreement or any part thereof without the Approval. 31.2 Notwithstanding the provisions of Clause 31.1 above, the Supplier shall be entitled to Sub-Contract its obligations to supply the Services to those Sub-Contractors listed in Framework Agreement Schedule 2 (Sub-Contractors). The Supplier shall ensure that terms are included in any Sub-Contract permitted under this Framework Agreement which: 31.2.1 require the Supplier to pay any undisputed sum due to the relevant Sub-Contractor within a specified period that does not exceed thirty (30) calendar days from the date the Supplier receives the Sub-Contractor's invoice; and 31.2.2 prohibit the Sub-Contractor from further sub-contracting any element of the service provided to the Supplier without Approval. 31.3 The Supplier shall not substitute or remove a Sub-Contractor or appoint an additional sub-contractor without Approval, such Approval not be unreasonably withheld or delayed. Such consent shall not constitute approval or endorsement of such substitute or additional sub-contractor and the Supplier shall remain responsible for the provision of the Ordered Services at all times. 31.4 The Authority may require the Supplier to terminate a Sub-Contract where it considers that: 31.4.1 the Sub-Contractor may prejudice the provision of the Services or may be acting contrary to the interests of the Authority; 31.4.2 the Sub-Contractor is considered to be unreliable and/or has not provided reasonable services to its other customers; and/or 31.4.3 the Sub-Contractor employs unfit persons; 31.5 In the event that the Authority exercises its right pursuant to Clause 31.4 above, the Supplier shall remain responsible for maintaining the provision of the Services. 31.6 Despite any permitted Sub-Contract pursuant to this Clause 31, the Supplier at all times shall remain responsible for all acts and omissions of its Sub-Contractors and the acts and omissions of those employed or engaged by the Sub-Contractors as if they were its own. An obligation on the Supplier to do, or refrain from doing, any act or thing shall include an obligation upon the Supplier to procure that its employees, staff, agents and the Sub-Contractors', employees, staff and agents also do, or refrain from doing, such act or thing. 31.7 The Authority shall be entitled to: 31.7.1 assign, novate or otherwise dispose of its rights and obligations under this Framework Agreement or any part thereof to any Other Contracting Body; or 31.7.2 novate, transfer or otherwise dispose of its rights and obligations under this Framework Agreement to any other body (including any private sector body) which substantially performs any of the functions that previously had been performed by the Authority. 31.8 The Supplier shall enter into such agreement and/or deed as the Authority shall reasonably require so as to give effect to any assignment, novation, transfer or disposal made pursuant to Clause 31.7 above.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Production definitively discontinued 10.1. If the holder of the approval completely ceases to manufacture a vehicle type approved in accordance with this Regulation, he shall so inform the authority which granted the approval. Upon receiving the relevant communication that authority shall inform thereof the other Parties to the 1958 Agreement applying this Regulation by means of a communication form conforming to the model in Annex 1 to this Regulation.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!