Common use of When filling Slumps Clause in Contracts

When filling Slumps. Borrow shall be obtained from agreed locations, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer. Existing Surface and Base Course Material shall be salvaged when practical and re-laid after depressions have been filled. The repaired areas of the Slump shall conform to the cross-section of the adjacent undisturbed Roadway.

Appears in 2 contracts

Samples: Timber Sale Contract, www.fs.usda.gov

AutoNDA by SimpleDocs

When filling Slumps. Borrow shall be obtained from agreed locations, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer. Existing Surface and Base Course Material shall be salvaged when practical and re-laid after depressions have been filled. The repaired areas of the Slump shall conform to the cross-section of the adjacent undisturbed Roadway.. ACTIVITY 1020 - SURFACE BLADING (DOZER)

Appears in 2 contracts

Samples: Service Timber Sale Contract, Service Timber Sale Contract

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.