Witness Test. For lab-certified equipment, verification (either by an on-site observation or review of documents) by the utility that the interconnection installation evaluation required by IEEE Standard 1547 Section 11.2.4 and the commissioning test required by IEEE Standard 1547 Section 11.2.5 have been adequately performed. For interconnection equipment that has not been lab certified, the witness test shall also include verification by the utility of the on-site design tests required by IEEE Standard 1547 Section 11 and verification by the utility of production tests required by IEEE Standard 1547 Section 11.2.3. All tests verified by the utility are to be performed in accordance with the test procedures specified by IEEE Standard 1547.1. Levels 2 To 4 Distributed Generation Interconnection Agreement Construction Schedule, Proposed Equipment & Settings This attachment is to be completed by the interconnection customer and shall include the following:
Appears in 4 contracts
Samples: Request Agreement, Request Agreement, Request Agreement
Witness Test. For lab-certified equipment, verification (either by an on-site observation or review of documents) by the utility that the interconnection installation evaluation required by IEEE Standard 1547 Section 11.2.4 5.3 and the commissioning test required by IEEE Standard 1547 Section 11.2.5 5.4 have been adequately performed. For interconnection equipment that has not been lab certified, the witness test shall also include verification by the utility of the on-site design tests required by IEEE Standard 1547 Section 11 5.1 and verification by the utility of production tests required by IEEE Standard 1547 Section 11.2.35.2. All tests verified by the utility are to be performed in accordance with the test procedures specified by IEEE Standard 1547.1. Levels 2 To 4 Distributed Generation Interconnection Agreement Construction Schedule, Proposed Equipment & Settings This attachment is to be completed by the interconnection customer and shall include the following:
Appears in 2 contracts
Samples: Distributed Generation Interconnection Request Agreement, Request Agreement
Witness Test. For lab-certified equipment, verification (either by an on-site observation or review of documents) by the utility EDC that the interconnection installation evaluation required by IEEE Standard 1547 Section 11.2.4 5.3 and the commissioning test required by IEEE Standard 1547 Section 11.2.5 5.4 have been adequately performed. For interconnection equipment that has not been lab lab-certified, the witness test shall also include verification by the utility EDC of the on-site design tests required by IEEE Standard 1547 Section 11 5.1 and verification by the utility EDC of production tests required by IEEE Standard 1547 Section 11.2.35.2. All tests verified by the utility EDC are to be performed in accordance with the test procedures specified by IEEE Standard 1547.1. Levels Attachment 2 To 4 Distributed Generation Interconnection Agreement Construction Schedule, Proposed Equipment & Settings This attachment is to be completed by the interconnection customer upon completion of detailed engineering, and shall include the following:
Appears in 1 contract
Samples: www.icc.illinois.gov
Witness Test. For lab-certified equipment, verification (either by an on-site observation or review of documents) by the utility that the interconnection installation evaluation required by IEEE Standard 1547 Section 11.2.4 and the commissioning test required by IEEE Standard 1547 Section 11.2.5 have been adequately performed. For interconnection equipment that has not been lab certified, the witness test shall also include verification by the utility of the on-site design tests required by IEEE Standard 1547 Section 11 and verification by the utility of production tests required by IEEE Standard 1547 Section 11.2.3. All tests verified by the utility are to be performed in accordance with the test procedures specified by IEEE Standard 1547.1. Levels ATTACHMENT 2 To 4 Distributed Generation Interconnection Agreement Construction Schedule, Proposed Equipment & Settings Settings This attachment is to be completed by the interconnection customer and shall include the following:
Appears in 1 contract
Samples: Distributed Generation Interconnection, Purchase Agreement