WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place. 41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises. 42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day. 43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material. 44. No material shall be stocked in the lift lobby area. 45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required. 46. No storage of any material / records in basement is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day. 47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 3 contracts
Samples: Lease Deed (WNS (Holdings) LTD), Lease Deed (WNS (Holdings) LTD), Lease Deed (Cvent Inc)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement is allowed as it obstructs basement, to enable free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 2 contracts
Samples: Lease Deed (WNS (Holdings) LTD), Lease Deed (WNS (Holdings) LTD)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site project once in every three day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 2 contracts
Samples: Lease Deed (Virtusa Corp), Lease Deed (Virtusa Corp)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove removed from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases staircases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement is allowed as it obstructs basement, to enable free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc chiseling etc. is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 1 contract
Samples: Lease Deed (WNS (Holdings) LTD)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
48. Working Norms for Interior Works
(a) In New Building where no other LESSEE is operational the interior works can be done on 24 hrs. basis.
(b) In a multi-tenanted building as soon as any other LESSEE completes their interior works and becomes operational; no noisy works to be done during office hours.
(c) Noisy works such as drilling, hammering, cutting, chiseling etc. to be carrying out by THE LESSEE after normal office hours.
Appears in 1 contract
Samples: Lease Deed
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout fit-out material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 1 contract
Samples: Lease Deed (Virtusa Corp)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement basement, is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal THE LESSEE’s office hours, no noisy interior works such as drilling, hammering, cutting, chisilling chiseling etc is to be carried out by THE LESSEE. The same can be done after normal THE LESSEE’s office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 1 contract
Samples: Lease Deed (Cvent Inc)
WORK PROCEDURE. 40. THE LESSEE shall ensure that no structural damage takes place.
41. Every day, on completion of work, THE LESSEE shall ensure that the site is cleaned all combustible & non-combustible scrap including any wood/paper/lose paint /any other material/scrap is remove from the premises.
42. THE LESSEE shall ensure that the malba/scrap is disposed out of site every day.
43. THE LESSEE shall ensure that the stair cases are not blocked with interior fitout material.
44. No material shall be stocked in the lift lobby area.
45. THE LESSEE shall not store paint and other combustible material at Demised Premises. The material may be brought onto the floor for interior finishing as and when it is required.
46. No storage of any material / records in basement basement, is allowed as it obstructs free movement. However, for a limited period of 10 days during interior works THE LESSEE with the permission of the facility manager can use this earmarked car/two xxxxxxx parking space as temporary storage for fixture/furniture which is in the process of being installed. The same must be barricaded by THE LESSEE and THE LESSEE must depute a security guard for the same. THE LESSEE must install a Fire Fighting system such as extinguishers, sand buckets & water buckets to the satisfaction of the facility manager for this temporary storage area. This furniture/fixture will be allowed to be brought only 7 days in advance of installation. The storage area must be cleared by THE LESSEE immediately after shifting the material in their premises. In case the interiors are getting delayed beyond the targeted date, THE LESSEE will clear the temporary store immediately and shift all material in their premises. When the material is shifted on the floor the packing / covering to be removed the same day and all packing / covering material to be shifted out of the premises and the building on the same day.
47. During normal office hours, no noisy interior works such as drilling, hammering, cutting, chisilling chiseling etc is to be carried out by THE LESSEE. The same can be done after normal office hours. However, works other than the above can be carried on which cause no disturbance to the occupied floors.
Appears in 1 contract
Samples: Lease Deed (Cvent Inc)