ADDENDUM
AND AMENDMENT
TO
CONTRACT BETWEEN
TERRESTAR
NETWORKS INC. AND XXXXXX NETWORK SYSTEMS, LLC
FOR
DESIGN, DEVELOPMENT AND SUPPLY OF
SATELLITE
BASE STATION SUBSYSTEM (S-BSS)
This Addendum and
Amendment (the “Addendum”)
is made as of April 13, 2007 (the “Addendum Effective Date” or “EDA”) by and
between Xxxxxx Network Systems, LLC (the “Contractor”) with its principal place
of business at 00000 Xxxxxxxxxxx Xxxx, Xxxxxxxxxx, Xxxxxxxx, 00000, and
TerreStar Networks Inc., a corporation organized under the laws of Delaware with
its principal place of business at One Discovery Square, Suite 600, 00000
Xxxxxxx Xxxxxx Xxxxx, Xxxxxx, Xxxxxxxx 00000 (“TerreStar”). As used
herein, Contractor and TerreStar may each be referred to individually as a
“Party” and collectively as the “Parties.”
WHEREAS, TerreStar
has contracted with Contractor for the design, development and supply of an
S-BSS and related Deliverable Items under the contract between the Parties
titled “Contract Between TerreStar Networks Inc. and Contractor for Design,
Development and Supply of Satellite Base Station Subsystem (S-BSS),” dated
February 6, 2007 (the “Contract”);
WHEREAS,
TerreStar intends for the initial mobile terminals (MTs) to include a
“Terrestrial Baseband Chipset” that will enable the MT user to communicate
utilizing various terrestrial communication technologies, manage the
communication preferences and priorities, and monitor the availability of the
satellite communications links; an “RF Chipset” to transmit and receive voice
and data communications; and a Satellite Chipset that will enable the MT user to
communicate utilizing the space-based network including, in particular, through
the S-BSS;
WHEREAS,
Contractor desires to design and develop multiple Releases of the Satellite
Chipsets to interoperate with (i) the S-BSS, (ii) one or more Terrestrial
Baseband Chipsets, and (iii) one or more RF Chipsets identified by TerreStar,
and TerreStar desires to procure from Contractor such design and development
services, and other related services as more fully described in this
Addendum;
WHEREAS,
in the interest of time, the Parties desire to meet TerreStar’s
requirements for a Satellite Chipset by
undertaking a [***]-phased approach, with the [***] phase resulting in [***] and
with the [***] phase resulting in [***];
WHEREAS,
while TerreStar initially intends for the Terrestrial Baseband Chipset and
Satellite Chipset to be two distinct chipsets, TerreStar desires that the
Terrestrial Baseband Chipset and the Satellite Chipset software evolve into a
single integrated, universal chipset (an “Integrated
Chipset”);
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
|
WHEREAS,
the Parties desire to amend and supplement the Contract to incorporate the Work
related to the Satellite Chipset and other revisions set forth
herein.
NOW,
THEREFORE, in consideration of the mutual covenants and agreements
contained herein and intending to be legally bound, the Parties hereby agree to
the following:
I. The
Contract is hereby amended as follows:
1. Article
1 (Scope of Work). Exhibit A-2 (Satellite Chipset Platform
Statement of Work) is hereby incorporated into the Contract. All
references to Exhibit A (Statement of Work) in the Contract shall be deemed to
refer to Exhibit A (S-BSS Statement of Work) and Exhibit A-2 (Satellite Chipset
Platform Statement of Work), unless expressly stated otherwise.
2. Article
1 (Scope of Work). Exhibit B-2 (Satellite Chipset Platform Technical
Specification) is hereby incorporated into the Contract. All
references to Exhibit B (Satellite Base Station (S-BSS) Functional
Specifications) in the Contract shall be deemed to refer to Exhibit B (S-BSS
Functional Specifications) and Exhibit B-2 (Satellite Chipset Platform Technical
Specification), unless expressly stated otherwise.
3. Article
1.A (Provision of Services and Materials). Article 1.A is
hereby amended to read as follows:
|
A. Provision of Services and
Materials. Contractor shall design, develop,
provide, manufacture, transport, assemble, configure, install, test and deliver the
turn-key S-BSS (in the quantities specified in Exhibit A), the Satellite Chipset Work (in the
quantities specified or to be agreed in Exhibit A2), the
test-bed facilities, simulators and all other related
Deliverable Items (as defined in Article 2.A), and shall perform the
services set forth in this Contract (“Services”),
including any Sservices not
specifically described in this Contract or the attached exhibits that are
required or appropriate for the proper performance and provision of the
Sservices and Deliverable
Items hereunder (collectively, the “Services” and together with the
Deliverable Items,
constitute
the “Work”), all in accordance with this Contract, including the following
exhibits, which are attached hereto (or incorporated by reference) and
made a part hereof:
|
|
(1) |
Exhibit A –
S-BSS
Statement of Work;
|
|
(2) |
Exhibit
A2 – Satellite
Chipset Platform Statement
of Work (“Chipset Statement of
Work”);
|
|
(3) |
Exhibit B –
Satellite Base Station Subsystem (S-BSS) Functional
Specifications;
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
2
|
(4) |
Exhibit
B2 –
Satellite Chipset Platform Technical Specification (“Chipset
Specifications”);
|
|
(5) |
Exhibit C –
S-BSS
Price and Payment Milestone
Schedule;
|
(6) |
Exhibit
C2 – Chipset Price and Payment Milestone
Schedule;
|
|
(7) |
Exhibit D –
S-BSS
Options; and
|
|
(8) |
Exhibit D2 –
Chipset Options
|
4. Article
2.A (Deliverable Items). Article 2.A is hereby amended to read
as follows:
A. Deliverable Items. Subject to the other terms and conditions of this Contract, Contractor shall deliver to TerreStar the turn-key S-BSS (in the quantities specified in Exhibit A), the Satellite Chipset Work (in the quantities specified or to be agreed in Exhibit A2), the test-bed facilities, simulators and all other related hardware, software and other items to be delivered by Contractor pursuant to this Contract (collectively, “Deliverable Items”) all as further described in Exhibits A and B. |
5. Article
2 (Delivery by Contractor). The Contract is hereby amended to
add the following as new Article 2.C (Identification of Background IP) and 2.D
(Production Units):
C.
|
Identification
of Background IP.
|
|
Contractor
shall provide a list of Background IP intended to be used in the Satellite
Chipsets, not later than Chipset
SRR.
|
D. Production
Units.
|
Contractor
shall provide a proposal for a contract under which Contractor shall
manufacture, or have manufactured, Production Units of the applicable
Satellite Chipset (the “Production Contract”). Such proposal
shall be provided to TerreStar no later than [***]. The
Production Contract shall be subject to and shall include the provisions
of Article 4.B. With respect to Satellite Chipsets that are to
be sold to, or otherwise provided to, TerreStar or a TerreStar supplier
(including any TerreStar designated reference terminal design contractor
or terminal manufacturer) by Contractor, any manufacturer to which
Contractor subcontracts the manufacture of such Satellite Chipset shall be
subject to TerreStar’s
approval, which shall not be unreasonably withheld. Orders by or on behalf
of any TerreStar Alliance Partner shall be included in the calculation of
the annual order
volume.
|
[***]
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
3
6. Article
4.A (Price). The first sentence of Article 4.A is hereby
amended to read as follows:
A.
Firm
Fixed Price. The total amount payable by TerreStar
hereunder shall be a firm fixed price for the total combined
amount set forth in Exhibits
C and
C2, in United Stated Dollars (“Purchase
Price”).
|
7. Article
5.B (Acceptance). Article 5.B is hereby amended to read as
follows:
B. S-BSS
Acceptance.
Provisional
Acceptance Testing shall be conducted during the Operational Verification
Phase for S-BSS
[***] once Contractor has completed all prerequisite Work to be
performed under this Contract with respect to S-BSS
[***] and prior Releases, and has successfully achieved all
previous Milestones for S-BSS
[***]
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
4
and
prior Releases through the end of the Technical Verification Phase
(including successful completion of the “Technical Verification Review”
Milestone for S-BSS [***] (as described in Exhibit A)). If at any time
TerreStar places the TerreStar Network (including the S-BSS) into
commercial revenue-generating operation prior to TerreStar having granted
Provisional Acceptance, then Provisional Acceptance shall be deemed to
have occurred.
|
Final
Acceptance Testing shall be conducted during the Operational Verification Phase
for S-BSS [***],
once Contractor has completed all prerequisite Work to be performed under this
Contract with respect to S-BSS
[***]
and prior Releases, and has successfully achieved all previous Milestones for
S-BSS
[***]
and prior Releases through the end of the Technical Verification Phase
(including successful completion of the “Technical Verification Review”
Milestone for S-BSS
[***]
(as described in Exhibit A)).
Contractor shall also be
responsible to obtain any required “Type Approvals” from the FCC or other
applicable regulatory agencies for the S-BSS
Deliverable Items provided in connection with the applicable Release, and
part of the applicable Acceptance Testing process will include confirmation that
Contractor has obtained all such required “Type Approvals.” TerreStar
shall conduct Acceptance Testing in accordance with the applicable testing
procedures specified in Exhibit A hereto. Contractor shall support
TerreStar in all phases of Acceptance Testing, in accordance with Exhibit A
hereto. Following completion of the applicable Acceptance Testing,
Contractor shall provide TerreStar with a written report specifying the tests
that were performed, whether the tests were successfully completed, and
identifying any problems, defects or anomalies that were identified through such
testing. TerreStar shall notify Contractor of its acceptance or
rejection of the applicable Work within fifteen (15) Business Days after
completion of the applicable Acceptance Testing and receipt of Contractor’s
report. Should TerreStar not respond to a the aforementioned written
report submitted by Contractor for approval of the relevant Acceptance test
within 15 business days, the relevant Acceptance event for the applicable
Release shall be deemed to have occurred. In the event of rejection
of the Work due to failure of the Work to meet the Specifications and/or the
other requirements of this Contract with respect to the applicable Release,
Contractor shall promptly correct the Work and shall re-deliver the corrected
Work to TerreStar, and such Work shall be subject to further testing to verify
that the problems have been corrected. The preceding process shall be
repeated as necessary until all such problems have been corrected at which time,
TerreStar shall accept the Work associated with such Release in
writing. Notwithstanding the foregoing, nothing herein shall limit
TerreStar’s rights to pursue its available remedies (including any right to
terminate this
Contract for cause) in the event that the Work is not accepted for any reason or
is not accepted by the dates scheduled herein.
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
5
8. Article
5.C (Rejection). Article 5.C is hereby renumbered as Article
5.D.
9. Article
5 (Acceptance). The Contract is hereby amended to add the
following as new Article 5.C (Satellite Chipset Acceptance), which shall apply
to acceptance of the Chipset Work:
C. Satellite
Chipset
Acceptance.
Provisional
Acceptance Testing shall be conducted during the Operational Verification Phase
for Satellite Chipset [***],
once Contractor has completed all prerequisite Work to be performed under this
Contract with respect to Satellite Chipset [***] and prior Releases, and has
successfully achieved all previous Milestones for Satellite Chipset [***] and
prior Releases through the end of the Technical Verification Phase (including
successful completion of the “Technical Verification Review” Milestone for Satellite
Chipset [***] (as described in Exhibit A2)). If at any time TerreStar
places the TerreStar Network (including the Satellite
Chipset) into commercial revenue-generating operation prior to TerreStar having
granted Provisional Acceptance, then Provisional Acceptance shall be deemed to
have occurred.
Final
Acceptance Testing shall be conducted during the Operational Verification Phase
for Satellite Chipset [***],
once Contractor has completed all prerequisite Work to be performed under this
Contract with respect to Satellite Chipset [***]
and prior Releases, and has successfully achieved all previous Milestones for
Satellite Chipset [***]
and prior Releases through the end of the Technical Verification Phase
(including successful completion of the “Technical Verification Review”
Milestone for Satellite Chipset [***]
(as described in Exhibit A2)).
Satellite
Chipset [***]
Final Acceptance shall be conducted during a [***]
Satellite Chipset Operational Verification Phase, once Contractor has completed
all prerequisite Work to be performed under this Contract with respect to
Chipset [***]
and prior Releases, and has successfully achieved all previous Milestones for
Chipset [***]
and prior Releases (as described in Exhibit A2).
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
6
The Contractor is not
responsible for “Type Approvals” for the Satellite Chipset. However,
the Contractor shall support TerreStar as defined in Exhibit A2 during the user
terminal certification process. TerreStar shall conduct
Acceptance Testing
in accordance with the applicable testing procedures specified in Exhibit A2
hereto. Contractor shall support TerreStar in all phases of Acceptance Testing,
in accordance with Exhibit A2 hereto. Following completion of the applicable
Acceptance Testing, Contractor shall provide TerreStar with a written report
specifying the tests that were performed, whether the tests were successfully
completed, and identifying any problems, defects or anomalies that were
identified through such testing. TerreStar shall notify Contractor of its
acceptance or rejection of the applicable Work within fifteen (15) Business Days
after completion of the applicable Acceptance Testing and receipt of
Contractor’s report. Should TerreStar not respond to a the aforementioned
written report submitted by Contractor for approval of the relevant Acceptance
test within 15 business days, the relevant Acceptance event for the applicable
Release shall be deemed to have occurred. In the event of rejection of the Work
due to failure of the Work to meet the Specifications and/or the other
requirements of this Contract with respect to the applicable Release, Contractor
shall promptly correct the Work and shall re-deliver the corrected Work to
TerreStar, and such Work shall be subject to further testing to verify that the
problems have been corrected. The preceding process shall be repeated as
necessary until all such problems have been corrected at which time, TerreStar
shall accept the Work associated with such Release in writing. Notwithstanding
the foregoing, nothing herein shall limit TerreStar’s rights to pursue its
available remedies (including any right to terminate this Contract for cause) in
the event that the Work is not accepted for any reason or is not accepted by the
dates scheduled herein.
10. Article
7.E (Invoices). Article 7.E is hereby amended to change the
telephone number for [***], Director of Contracts and Assistant General Counsel,
to “Tel: [***].”
11. Article
9.D (Warranty Period). Article 9.D is hereby amended to read
as follows:
D. Warranty Period. With respect to each Deliverable Item or Service associated with the S-BSS Work, these warranty and support obligations shall run for a period of one (1) year from the completion of Technical Verification Review for [***] (the “S-BSS Warranty Period”). With respect to the Chipset Work, these warranty and support obligations shall run for a period of one (1) year from Final Acceptance of [***] (the “Chipset Warranty Period”). Notwithstanding the preceding, as part of the Services included in the Purchase Price, Contractor shall remedy any problems or defects in (i) [***] of the S-BSS that arise between Provisional Acceptance and Final Acceptance of the S-BSS and (ii) [***] of the [***] Satellite Chipset that arise between their respective Acceptance dates and Final Acceptance of the [***] Satellite Chipset. With respect to the Deliverable Items, TerreStar may purchase an extended Warranty as provided for in Exhibit D and D2. |
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
7
12. Article
9.L (Intellectual Property). Article 9.L is hereby amended to
read as follows:
L.
Intellectual
Property. Contractor represents and warrants that as of
EDC, Contractor is not aware of any claim that the Work or any
Intellectual Property owned or supplied by Contractor utilized or
incorporated in any Deliverable Item or the manufacture of any Deliverable
Item
(or
any Satellite Chipset if a Release Condition occurs)
infringes any Intellectual Property Right of any third party. This
warranty shall continue for the operating life of the
S-BSS. TerreStar shall not be required to pay any license fees
or royalties apart from those included in the Purchase Price for use of
any Intellectual Property utilized or incorporated in any Deliverable
Item
(or
any Satellite Chipset if a Release Condition occurs) or the
manufacture of any Deliverable Item
(or
any Satellite Chipset if a Release Condition occurs). Notwithstanding
the foregoing, this warranty shall not apply to the extent a claim is
based on TerreStar’s failure to obtain Third Party Licensor rights in
connection with the manufacturing or sale of the Satellite Chipset by
TerreStar or a TerreStar’s designee pursuant to Article
13.I(2).
|
|
13. Article
9.O (Limitation). Article 9.O is hereby amended to read as
follows:
O. Limitation. EXCEPT
WITH RESPECT TO ARTICLES 9.A,
9.K AND 9.L, THE RIGHTS AND REMEDIES OF TERRESTAR PROVIDED IN THIS ARTICLE 9
SHALL BE THE SOLE AND EXCLUSIVE REMEDY, EXPRESS OR IMPLIED, WHETHER PURSUANT TO
THIS CONTRACT OR OTHERWISE, WITH RESPECT TO THIS ARTICLE 9.
14. Article
9.R (Post-Warranty Support). Article 9.R is hereby amended to
read as follows:
R. Post-Warranty Support. Contractor shall use commercially reasonable efforts to ensure that post-warranty hardware and software support may be procured from Contractor for the S-BSSDeliverable Items, on commercially reasonable terms and pricing, for a period of seven (7) years from Final Acceptance. |
15. Article
10.C (Key Personnel). Article 10.C is hereby amended to read
as follows:
C.
|
Key
Personnel. Key personnel (“Key Personnel”) shall be the
personnel filling the
following or equivalent positions:
|
|
(1)
|
Dedicated
Contractor Program Manager;
[***]
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
8
|
(2) |
Dedicated
Engineering
Manager for Chipset [***];
[To
be agreed at KOR.]
|
|
(2)(3) Dedicated
Engineering Manager with
respect to the S-BSS Work;
[***]
|
(4) Dedicated
Engineering Manager with respect to the Chipset [***] Work;
[***]
|
|
(5)
Executive
Engineering Oversight for S-BSS and Chipset Work;
[***]
|
|
16. Article
13 (Intellectual Property Rights). Article 13 is hereby
amended to read as follows:
A.
|
Definitions. For
the purposes of this Article 13, the following terms shall have the
following definitions:
|
(1)
“Contractor
Background IP” means (i) all IP owned or controlled or licensed by
Contractor as of EDC, and incorporated in or necessary for the use (as
expressly provided for herein) of any Deliverable Item
or
the use or manufacture of any Production Unit,
and (ii) all IP conceived or developed by Contractor after EDC other than
in connection with this Contract, and incorporated in or necessary for the
use (as expressly provided for herein) of any Deliverable
Item.
|
|
(2)
“Foreground
IP” shall mean all IP developed or licensed
(from a third party) by
or on behalf of Contractor or TerreStar as a result of or arising from
Contractor’s or TerreStar’s (as applicable) performance under this
Contract, which is incorporated in or necessary for the use of any
Deliverable Item
or
the use or manufacture of any Production Unit.
|
|
(3) “Intellectual Property” or “IP” means all ideas, information, concepts, discoveries, inventions, methods or processes, Sspecifications, technology, software and other works of authorship, improvements and know-how (whether or not patentable and whether or not reduced to practice), and all associated rights in and to any patents, patent applications (including any reissues, continuations, continuations-in-part, revisions, extensions and reexaminations thereof), copyrights, maskworks and trade secrets, and all rights in and to any proprietary or confidential information. |
|
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
9
(4)
“TerreStar
Background IP” means (i) all IP owned or controlled by TerreStar as of
EDC, and (ii) all IP conceived or developed by TerreStar after EDC other
than in connection with this Contract.
|
|
(5) “Chipset
IP” means all designs, technology and maskworks, and software and other
works of authorship, (whether or not patentable and whether or not reduced
to practice), and all associated rights in and to any patents, patent
applications (including any reissues, continuations,
continuations-in-part, revisions, extensions and reexaminations thereof),
copyrights and trade secrets related to the Satellite
Chipset.
|
|
(6) “Contractor
Foreground Chipset IP” shall mean all Chipset IP developed by or on behalf
of Contractor after EDC, and arising exclusively from Contractor’s
performance under this Contract, which Chipset IP is incorporated in or
necessary for the use, manufacture, sale, offer for sale or importation of
the Satellite Chipsets.
|
|
(7) “Contractor Foreground IP” shall mean
all Foreground IP developed by or on behalf of, or licensed by a third
party to, Contractor after EDC.
|
|
(8) “Mobile Chipset” means any chipset
designed or developed by Contractor for a user terminal in a satellite
mobile communications network that utilizes or incorporates a material
amount of the Contractor Foreground Chipset IP.
|
|
(9)
“Royalty
Base” means that portion of the total Contractor selling price for a
Mobile Chipset that is attributable to the Contractor developed chips and
excludes the value of any chip that does not incorporate Contractor
Foreground Chipset IP.
|
|
B.
|
Ownership
of IP and IP Rights.
|
(1)
|
Background
Intellectual
Property.
|
(a) Contractor
Background IP – Subject to the licenses granted in Article
13.C(1) as between Contractor and TerreStar, all Contractor Background IP
shall be the sole and exclusive property of
Contractor.
|
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
10
|
(b) TerreStar Background
IP – Subject to the licenses granted in Article
13.C(2), as between Contractor and TerreStar, all TerreStar Background IP
shall be the sole and exclusive property of
TerreStar.
|
(2)
|
Foreground
Intellectual
Property.
|
|
(a) Contractor Foreground
IP -
Subject to the licenses granted in Article 13.C(1)
and
Article 13.I(2), all Contractor
Foreground IP of
Contractor (and any of its Subcontractors) shall be the sole and
exclusive property of
Contractor.
|
|
(b) TerreStar Foreground
IP – Subject to the
licenses granted in Article 13.C(2), as between Contractor and TerreStar,
all Foreground IP of TerreStar shall be the sole and exclusive property of
TerreStar.
|
C.
|
License
Rights.
|
(1) Grant by Contractor. Subject to the terms and conditions stated herein Subject to fulfillment by TerreStar of its obligations under this Agreement, Contractor grants to TerreStar a fully paid-up, irrevocable, perpetual, transferable, worldwide, nonexclusive right and license to: (i) use and have used, reproduce, and modify (a) all Contractor Background IP and Contractor Foreground IP associated with the S-BSS Work for the sole and exclusive purpose of testing, using, operating, and/or maintaining any Deliverable Item (including any associated technical data (“Deliverable Data”) associated with the S-BSS, all Contractor Background IP and Contractor Foreground IP, and (b) all Contractor Background IP and Contractor Foreground IP associated with the Chipset Work solely for the purposes of using and supporting the Satellite Chipset and Production Units for use with the TerreStar Network; and (ii) sell, offer for sale, distribute and import the Satellite Chipsets and Production Units to third party suppliers for incorporation into an MTs marketed for use on the TerreStar Network, provided that the rights granted under this Article 13.C(1) shall not give TerreStar a license to access the Escrowed Materials except as permitted under Article 13.I. TerreStar may sublicense such rights to third party contractors engaged by TerreStar in connection with the operation and maintenance of the TerreStar Network and the sale and use of MTs, including any component thereof. |
|
(2) Grant by
TerreStar. Subject to the terms and conditions
stated herein, TerreStar grants to Contractor a fully paid-up, worldwide,
non-exclusive right and license to use and have used for the sole and
exclusive purpose of performing
under this Contract, the relevant TerreStar Background IP and TerreStar
Foreground IP.
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
11
|
(3)
Subcontracts. Contractor
shall, unless otherwise authorized,
approved
(which approval shall not be unreasonably withheld) or
directed in writing by TerreStar, use
commercially reasonable efforts to include in each Subcontract or
supplier agreement used by Contractor in connection with the provision of
any Work a clause pursuant to which each such Subcontractor or supplier
will grant to TerreStar (through Contractor) license rights in
Intellectual Property incorporated in Deliverable Items hereunder or
as necessary for TerreStar to exercise its rights with respect to
Production Units, in each case to the same extent as the license
rights granted by Contractor to TerreStar in this Article
13.
|
|
D. No Limitation on Deliverable
Items. This Article 13
shall not be construed as limiting any right of TerreStar otherwise
contained herein or at law (or any obligation of Contractor to grant
TerreStar the right) with no payment of additional compensation to use,
have used, deliver, lease, transfer, assign, sublicense or sell any
Deliverable Items of hardware or software or any part
thereof.
|
|
E. Access to Work
Product. TerreStar may at any time request, and
Contractor shall promptly provide, complete and accurate copies of any and
all work product created or performed by Contractor or its Subcontractors
under this Contract including, but not limited to reports, designs,
drawings, tests, results, bills of material, data, software and source
code (including, in each such case, source code that is included in any
third party software delivered as part of the
Work).
|
F. Royalty for Mobile Chipset. “Chipset Royalty” shall mean [***] ([***]%) of the Royalty Base per Mobile Chipset, with a minimum payment of [***] ($[***]) per Mobile Chipset. Contractor shall pay TerreStar the Chipset Royalty for each Mobile Chipset sold by or on behalf of Contractor to any entity other than TerreStar or a supplier for TerreStar,. Such royalty obligation shall commence on the date that Contractor and TerreStar complete the performance of the Chipset Statement of Work through the Final Acceptance of [***] of the Satellite Chipset Work, including all associated payments by TerreStar, and shall terminate ten (10) years following Final Acceptance of [***] of the Satellite Chipset Work. On a quarterly basis within thirty (30) days after the end of each quarter, Contractor shall submit to TerreStar (i) a report showing the calculation of all royalties due for such quarter and (ii) payment of all royalties attributable to such quarter. The Parties agree to negotiate in good faith to otherwise exploit the Foreground IP for the mutual benefit of both Parties. |
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
12
|
G.
Technology
Evolution. Through Chipset [***] Final
Acceptance, Contractor shall notify TerreStar of any improvements that
would benefit or improve the Satellite Chipset, that Contractor makes (i)
in its general course of business, and (ii) for its other customers (each
a “Technology Advance”), with disclosures under (ii) being subject to any
of Contractor’s non-disclosure obligations under such other customer
contracts.
|
|
H.
Bankruptcy
Provision. All rights and licenses granted to TerreStar
hereunder are, for purposes of Section 365(n) of the United States
Bankruptcy Code (the “Bankruptcy Code”), licenses of intellectual property
within the scope of Section 101 of the Bankruptcy
Code. Contractor acknowledges that TerreStar, as a licensee of
such rights and licenses hereunder, will retain and may fully exercise all
of its rights and elections under the Bankruptcy
Code.
|
|
I.
Right
to Have Third Party
Manufacturer
|
(1) Escrow. Promptly
upon completion of [***]
Satellite
Chipset HW DVT Complete
(FF1),
Contractor shall deposit, with a third party escrow agent, a complete set of all
Escrow Materials relating to Chipset Work on [***]. Promptly
upon completion of Final Sign Off of [***] for [***], Contractor
shall deposit,
with a third party escrow agent, a complete set of all of the Escrow Materials
relating to the Chipset Work on [***]. Contractor
shall update the Escrow Materials at each Milestone achieved and as changes are
otherwise made to any such items; provided that Contractor shall not be required
to provide such updates more than semi-annually, except with respect to an
update associated with a major new release of the Chipset
Design. TerreStar may choose the escrow agent of its choice, subject
to Contractor’s approval, which shall not be unreasonably withheld, and
Contractor’s manufacturer shall act as the escrow agent with respect to the
foundry-related materials. TerreStar shall have the right to access
the Escrow Materials in the escrow account with the prior written consent of
Contractor or in the event of a Release Condition. The Parties acknowledge and
agree that the escrow agreement referred to above is an agreement supplementary
to this Contract for purposes of Section 365(n) of the United States Bankruptcy
Code. Upon TerreStar’s access of the Escrow Materials as the result
of a Release Condition, Contractor obligations to update the Escrow Materials
shall terminate.
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
13
(2) Manufacturing License Grant. Subject to fulfillment by TerreStar of its obligations under this Agreement, Contractor hereby grants to TerreStar a non-exclusive, perpetual, worldwide, irrevocable license to Contractor Background IP and Contractor Foreground IP (but in each case, excluding Third Party Licensor IP) to use, have used, manufacture, have manufactured, sell, have sold and import the Satellite Chipset and Production Units for use on the TerreStar Network, and to copy, distribute, modify and create derivative works of any such Intellectual Property in furtherance of the foregoing. Such license includes, but is not limited to, the right to sublicense the license rights set forth in this sub-paragraph (2) to third party design and manufacturing subcontractors. |
(3) Covenant
Not to Exercise. TerreStar agrees that it shall not exercise the
license rights set forth in Article 13.I(2) unless and until (i) a Release
Condition (as defined in Article 13.I(4) below) occurs, and (ii) TerreStar has
paid all amounts due through (a) Provisional Acceptance with respect rights
related to [***], and
(b) Final Acceptance of [***]
of
the Chipset Work with respect to rights related to [***].
(4)
Release Conditions. The escrow agent shall provide the Escrow Materials to
TerreStar, upon request from TerreStar, should any of the events below
occur. Each such event is a “Release Condition.”
|
(a)
|
Contractor
is acquired by or merges with an entity that owns
a Competing Satellite System, or if Contractor acquires a greater
than[***]
percent ([***]%)
interest in an entity that owns a Competing Satellite System; or if
Contractor enters into a joint venture or other comparable arrangement
that owns a Competing Satellite
System.
|
|
(b) |
TerreStar
terminates the Chipset Statement of Work or the Production Agreement for
default;
|
||
(c) | Contractor is unable to pay its debts when due or otherwise ceases doing business in the ordinary course; | ||
(d) | Contractor files a voluntary petition in bankruptcy or for a reorganization or to effect a plan or other arrangement with its creditors, files an answer to a creditor's petition or other petition against it for an adjudication in bankruptcy or for a reorganization admitting the material allegations thereof, or applies for or permits the appointment of a receiver, trustee or custodian for any substantial portion of its properties or assets, and such petition or proceeding is not dismissed within sixty (60) days of the filing or initiation thereof; or |
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
14
(e)
Contractor fails to offer Production Units at [***] in
accordance with Article 2.D (3).
(5) Royalty-Free. The
license grant under Article 13.I(2) shall be royalty-free, unless the only
applicable Release Condition is under Article 13.I(4)(a) or 13.I(4)(e), in which
case TerreStar shall pay Contractor a royalty of [***]
percent
([***]%)
of the selling price for each Satellite Chipset or Production Unit manufactured
and sold by or on behalf of TerreStar or any of its sublicensees up to a maximum
of $[***]
(US)
per unit.
(6) Compensation
of Escrow Agent. All fees, expenses, and charges of the escrow agent
in connection with the services it performs under this Contract shall be paid by
TerreStar.
(7) Third
Party Relationships. Contractor
hereby grants to TerreStar the right, at TerreStar’s option and expense, (i) to
contract with Contractor’s manufacturer(s) of the Satellite Chipsets (“Chipset
Manufacturers”) to manufacture the Satellite Chip for TerreStar, and (ii) to
sublicense or assign the Third Party Licensor IP from the applicable Third Party
Licensor (to the extent Contractor has the right to sublicense or assign such
Third Party Licensor IP rights), in each case only in the event of a Release
Condition. Contractor shall advise the Third Party Licensors and
Chipset Manufacturers in writing of this fact, shall use commercially reasonable
efforts to require the Third Party Licensors and Chipset Manufacturers to offer
to license such IP or perform such activities, respectively, on commercially
reasonable terms (including the escrow obligations described in Article 13.K),
to TerreStar in the event of a Release Condition (or to permit Contractor to
assign the applicable contract to TerreStar at no additional cost), and
Contractor shall not include any prohibition contrary to this Contract in any
agreement with the Third Party Licensors or Chipset
Manufacturers. Contractor shall promptly inform TerreStar in writing
the extent to which the Third Party Licensors and Chipset Manufacturers fail to
agree to comply with the requirements described in this
Article.
(8)
Limitation to Infringement Indemnification. With respect to Satellite
Chipsets manufactured by TerreStar or its sublicensee pursuant to Article 13.I,
Contractor shall have no liability under Article 14 (IP Indemnification)
(i) to the extent that the IP Claim is based on the Third Party
Licensor Intellectual Property; and (ii) unless TerreStar elects to pay
Contractor a royalty, for any IP Claim if the rights under Article 13.I are
exercised as a result of a Release Condition under Article 13.I(4)(b), (c) or
(d).
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
15
J. Third Party Licensors. No later than C-CDR, Contractor shall identify in writing to TerreStar all known third parties whose Intellectual Property Contractor contemplates incorporating in the Satellite Chipset or that is otherwise necessary for the manufacture of the [***]. Such known third party is a “Third Party Licensor.” |
|
K. Third
Party IP Escrow. Contractor shall use commercially reasonable
efforts to require its Third Party Licensors to place the materials,
software and documentation (similar to the Escrow Materials) to be
provided by such Third Party Licensor, in an escrow account that includes
release conditions substantially similar to the Release Conditions set
forth in Article 13.I(4)(b)-(e) (such release conditions to be based upon
events related to acts or omissions of Third Party Licensor, not
Contractor), including the Third Party Licensor’s failure to support the
licensed Intellectual Property. Contractor shall promptly
inform TerreStar in writing the extent to which the Third Party Licensors
fail to agree to comply with the requirements described in this
Article..
|
|
L.
Universal,
Integrated Chipset License. At TerreStar’s request and upon reasonable
notice, Contractor shall grant TerreStar or its designee a royalty-bearing
license to incorporate the Satellite Chipset software (excluding Third
Party Licensor IP) into an Integrated Chipset manufactured by a third
party and to support the integration of the Satellite Chipset Work into
the Integrated Chipset. Such license shall be pursuant to a
separate, commercially reasonable agreement to be negotiated in good faith
by TerreStar and Contractor (the “Integrated Chipset License
Agreement”). The Integrated Chipset License Agreement shall be
subject to and shall include the provisions of Article
4.B. Contractor shall not take any action or make any agreement
that would preclude TerreStar from being able to implement the Satellite
Chipset IP into an Integrated Chipset (including any prohibiting third
party licensor from contracting with
TerreStar).
|
17. Article
16.B (TerreStar-Furnished Property and Facilities). Article
16.B shall not apply to the Chipset Work.
18. Article
18.A (Liquidated Damages). Article 18.A (Liquidated Damages)
is hereby amended to read as follows:
A. Liquidated
Damages. In the event that the relevant
Key Milestone is not completed as specified therefor in Exhibit A by [***],
then Contractor shall pay liquidated damages, which are not intended to be, and
shall not be construed as, a penalty, for each calendar day of delay after [***]. Contractor
shall pay TerreStar:
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
16
With
respect to the S-BSS Work, Ffor
each [***] ([***]) day period after November 30, 2008, liquidated damages for
each day of additional delay during such thirty-day period shall be equal to
[***] percent ([***]%) of the total S-BSS Purchase
Price multiplied by [***].
With
respect to the Chipset Work, for each [***] ([***])
day
period after [***],
liquidated damages for each day of additional delay during such thirty-day
period shall be equal to [***]
percent
([***]%)
of the portion
of the Chipset Purchase Price applicable to [***]
of
the Chipset Work as set forth in Exhibit C2 (the “[***]
Chipset
Purchase Price”) multiplied
by [***].
The total
accumulated liquidated damages payable by Contractor under this Contract for
delays in meeting the Key Milestone Date shall not exceed [***] percent
([***]%) of the total
S-BSS
Purchase Price
and
[***]
percent
([***]%)
of the [***]
Satellite
Chipset Purchase Price as applicable as
adjusted by any price impact resulting from changes to the respective Purchase
Price (for these purposes total Purchase Price will not include
the value of any options exercised under this Contract as listed in Exhibits D
and
D2).
19. Article
25 (Changes). References to the S-BSS in Article 25 shall be
deemed to mean the S-BSS Work and
the Chipset Work.
20. Article
25.B(9) (Subsequent Decisions). The Contract is hereby amended
to add the following as Article 25.B(9):
|
(9) Subsequent
Decisions. In Exhibit B2 (Chipset
Specifications), certain elements have not yet been finally
determined. These elements are noted as “TBD” “TBR” or by
another indication that such element has not been finalized as of EDA
(each a “TBD Element”). If TerreStar gives Contractor written
notice of TerreStar’s determination of a TBD Element prior to the date
specified therefor in Exhibit A2 or B2 (such determination to be based on
sound engineering principles), the firm fixed price set forth in Exhibit
C2 (Pricing) shall not be subject to an increase, unless such TBD Element
is expressly identified as an option in Exhibit D2
(Options). If TerreStar does not give such notice within the
specified time period, completion of the Specifications with respect to
that TBD Element such be subject to Articles 25.B(3) and
25.B(4).
|
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
17
21. Order
of Precedent. The Parties shall cooperate in good faith to
resolve any conflicts between the Exhibits associated with the S-BSS and
Exhibits associated with the Chipset Work, based on
the objective of TerreStar achieving a fully functional mobile communication
network using a satellite-terrestrial hybrid technologies.
22. Attachment
1 – Glossary. The following terms in Attachment 1 (Glossary)
are hereby amended as follows:
“Deliverable
Data” has
the meaning specified in Article 13.C(1)means
any technical data associated with any Deliverable
Item.
“Final
Acceptance” means,
(i)
with respect to the S-BSS Work, successful completion of
Operational Verification Testing of [***],
and
(ii) with respect to the Chipset Work, “Final Acceptance” is as specified in
Article 5.C.
“Final
Acceptance Testing” means
(i)
with respect to the S-BSS Work, the reviews and tests to be
conducted during the Operational Verification Phase for [***], including without
limitation as
part of the Operational Readiness Review and
the Operational Acceptance Review (all as further described in Exhibit A)
to determine whether the S-BSS Deliverable
Items associated with [***] conform with the Specifications and whether the
S-BSS
Work associated with [***] otherwise meets the requirements of this
Contract,
and
(ii) with respect to the Chipset Work, the reviews and tests to be conducted
during the Operational Verification Phase, including without limitation the
Operational Readiness Review (all as further described in Exhibit A2) to
determine whether the Satellite Chipset Deliverable Items associated with each
phase conform with the Specifications and whether the Chipset Work associated
with each phase otherwise meets the requirements of this
Contract.
“Key
Milestone”
(i)
with respect to the S-BSS Work shall
mean Provisional Acceptance of
the S-BSS and (ii)
with respect to the Chipset Work shall mean Provisional Acceptance of
the Satellite Chipset Work.
“Key
Milestone Date” shall mean the scheduled Milestone Date associated with
completion and TerreStar’s acceptance of the
relevant
Key Milestone, as set forth in
this Contract in
Exhibit A.
“Major
Subcontract” means a subcontract related to the performance of this
Contract and valued at (i)
Two Million Five Hundred Thousand U.S. dollars (U.S.$2,500,000) or
more
with
respect to the S-BSS Work, and (i) One Million U.S. dollars (U.S.$1,000,000) or
more with respect to Chipset Work.
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
18
“Preliminary
Design Review” (“PDR”) has the meaning specified in (i) Section
3.2.4 of Exhibit A
with
respect to the S-BSS Work, and (ii) Section 3.2.4.3 of
Exhibit
A-2 with respect to the Chipset Work. PDR
with respect to the Chipset Work is also referred to as C-PDR.
“Provisional
Acceptance” means,
(i)
with respect to the S-BSS Work, successful
completion of Operational Verification Testing for [***] (XXX Milestone),
and
(ii) with respect to the Chipset Work, successful completion of Satellite
Chipset [***] Operational
Verification Testing (XXX
Milestone).
[***]
[***]
[***]
23. Attachment
1 – Glossary. The Contract is hereby amended to add the
following terms to Attachment 1 (Glossary):
“[***]”
has the meaning specified in Article 2.D.
“Chipset
Purchase Price” means the portion of the Purchase Price applicable to the
Chipset Work, as set forth in Exhibit C2.
“Chipset
Royalty” has the meaning specified in Article 13.F.
“Chipset
Work” means the Work to be performed in connection with Exhibit A-2
(Chipset Statement of Work).
“Escrow
Materials” means all
tangible embodiments of the Contractor Background IP and Contractor Foreground
IP with respect to the Satellite Chipset Work (excluding such items licensed by
the Third Party Licensors), including fabrication drawings for all proprietary
mechanical parts, software (including object code and source code),
mask works, design specifications, schematics, assembly drawings, and any other
information that would be useful and necessary to
TerreStar to modify, manufacture, develop, distribute, support and/or maintain
the Satellite Chipsets, all to the extent that Contractor has not otherwise
delivered such items directly to TerreStar.
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
19
“Integrated
Chipset” has the meaning specified in the Recitals to this
Addendum.
“[***]
Chipset Purchase Price” has the meaning specified in Article
18.A.
“Preliminary
Acceptance” has the meaning specified in Article 5.C(1)(a).
“Production
Unit” means any chipset manufactured as a production unit and embodying
any Contractor Background IP or Foreground IP of Contractor.
“Release
Condition” has the meaning specified in Article
13.I(4).
“RF
Chipset” means one or more chips being procured from a third party by
TerreStar that will make up the RF portion of the MTs.
“Satellite
Chipset” means the chips being developed by Contractor pursuant to this
Addendum that will make up the satellite baseband portion of the
MTs.
“Satellite
Chipset Prototypes” means any prototype of the Satellite Chipset that is
deliverable under Exhibit A2 (Chipset Statement of Work). Such
Satellite Chipsets are provided for testing purposes and for use by TerreStar’s
designated terminal vendor in connection with the development and integration of
the user terminals.
“S-BSS
Purchase Price” means the portion of the Purchase Price applicable to the
S-BSS Work, as set forth in Exhibit C.
“S-BSS
Work” means the Work to be performed in connection with Exhibit
A.
“TerreStar
Alliance Partner” means any entity to whom TerreStar sublicenses the
intellectual property licensed by ATC Technologies LLP (or its successor) to
TerreStar.
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page
20
“Terrestrial
Baseband Chipset” means one or more chips being procured from a third
party by TerreStar that will make up the terrestrial baseband portion of the
MTs
“Third
Party Licensor” has meaning specified in Article
13.J.
II.
Capitalized terms shall have the meaning ascribed to them in the Contract, and
the related Exhibits and Glossary attached to the Contract, as may be amended by
this Addendum.
III. This
Addendum and the Contract together constitute the entire agreement and
understanding between the Parties in connection with the transactions hereby
contemplated. This Addendum supersedes all previous agreements,
arrangements and understandings between the Parties with regard to such
transactions. Except as specifically amended in this Addendum, the
Contract remains in full force and effect, and is ratified and
confirmed.
IN
WITNESS WHEREOF, the parties hereto have caused this Addendum to be
executed by their duly authorized representatives as of the day and year first
above written.
ACCEPTED:
TERRESTAR NETWORKS INC. | XXXXXX NETWORK SYSTEMS, LLC | ||||
By: |
/s/
Xxxx Xxxxxx
|
By: |
/s/
Xxxxxxx Xxxxxxx
|
||
Typed Name: |
Xxxx
Xxxxxx
|
Typed Name: |
Xxxxxxx Xxxxxxx
|
||
Title:
|
Chief
Financial Officer
|
Title:
|
Vice
President
|
||
Date: | May 3, 2007 | Date: | May 3, 2007 |
This
Addendum and the information contained therein are confidential and proprietary
to TerreStar and Contractor and shall not
be
published or disclosed to any third party except as permitted by the Terms and
Conditions of this Addendum and the Contract.
Page 21
TerreStar
Satellite Chipset SOW
|
Exhibit
A-2
TerreStar
Satellite Chipset
Statement
of Work
TSN_SAT_2_REQ-Satellite
Chipset SOW V 1.3
May
2, 2007
Xxxxxx Network Systems, LLC | |||
00000
Xxxxxxxxxxx Xxxx
|
|||
Xxxxxxxxxx, Xxxxxxxx 00000 |
/s/
Xxxxxxx Xxxxxxx
|
TerreStar Networks Inc. | |||
One Discovery Place | |||
00000 Xxxxxx Xxxxx Xxxx, 0xx Xxxxx | |||
Xxxxxx, Xxxxxxxx 00000 |
/s/ Xxxx
Xxxxxx
|
This
document contains data and information proprietary to TerreStar Networks
Inc. and Xxxxxx Network Systems, LLC. This data is being
furnished pursuant to the provisions of the Contract between TerreStar
Networks Inc. and Xxxxxx Network Systems, LLC for the TerreStar Satellite
Base Station Subsystem. Xxxxxx Network Systems, LLC and
TerreStar Networks Inc. shall have the right to duplicate, use or disclose
the data and information to the extent specified in the Contract and
herein.
|
Information
included in this Exhibit may contain technical data
controlled by the Export Administration Regulations ("EAR") and/or
the International Traffic in Arms Regulations ("ITAR"). This
document has not been cleared for export or transfer to a Foreign
Person or foreign entity.
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
TerreStar
Satellite Chipset SOW
TABLE
OF CONTENTS
Section | Page | |||
1.0
INTRODUCTION
|
1-1 | |||
1.1
PURPOSE AND OBJECTIVE
|
1-1 | |||
1.2
SCOPE
|
1-1 | |||
2.0
APPLICABLE SPECIFICATIONS
|
2-1 | |||
3.0
REQUIREMENTS
|
3-1 | |||
3.1
GENERAL REQUIREMENTS
|
3-1 | |||
3.1.1
Chipset Development
|
3-1 | |||
3.2
PROGRAM MANAGEMENT
|
3-1 | |||
3.2.1
Program Management Organization
|
3-1 | |||
3.2.1.1
Program Manager
|
3-1 | |||
3.2.1.2
Subcontracts
|
3-2 | |||
3.2.1.3
Program Communications
|
3-2 | |||
3.2.2
Program Plans
|
3-2 | |||
3.2.2.1
Program Management Plan
|
3-2 | |||
3.2.2.2
Program Schedule
|
3-2 | |||
3.2.3
Program Management Reviews, Meetings, and Status Reports
|
3-2 | |||
3.2.3.1
Kick-Off Meeting
|
3-2 | |||
3.2.3.2
Program Status
|
3-3 | |||
3.2.3.3
Monthly Program Management Reviews
|
3-3 | |||
3.2.3.4
Additional Management Reviews
|
3-3 | |||
3.2.4
Technical Reviews, Meetings, and Reports
|
3-3 | |||
3.2.4.1
General
|
3-3 | |||
3.2.4.2
C-SRR
|
3-3 | |||
3.2.4.3
C-PDR
|
3-3 | |||
3.2.4.4
C-CDR
|
3-4 | |||
3.2.4.5
Meeting Minutes
|
3-4 | |||
3.2.4.6
Additional Meetings
|
3-4 | |||
3.2.4.7
Readiness Reviews
|
3-4 | |||
3.3
DESIGN AND DEVELOPMENT
|
3-4 | |||
3.3.1
UMTS Compatibility
|
3-4 | |||
3.3.2
Export Compliance
|
3-4 | |||
3.3.3
System Engineering
|
3-5 | |||
3.3.3.1
System Design
|
3-5 | |||
3.3.3.2
Common Air Interface Specification
|
3-5 | |||
3.3.3.3
Interface Control Document
|
3-5 | |||
3.3.3.4
Analysis and Simulation
|
3-5 | |||
3.3.3.5
Control and Management
|
3-5 | |||
3.3.4
Software Design and Development
|
3-5 | |||
3.3.4.1
Software Development Plan
|
3-5 | |||
3.3.4.2
Contractor Developed Software
|
3-6 | |||
3.3.4.3
Software Development
|
3-6 |
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
ii
TerreStar
Satellite Chipset SOW
3.3.4.4
Software Design Documentation
|
3-6 | |||
3.3.4.5
Software Test
|
3-6 | |||
3.3.5
Hardware Design and Test
|
3-6 | |||
3.3.5.1
Hardware Development Plan
|
3-6 | |||
3.3.5.2
Contractor Developed Hardware
|
3-7 | |||
3.3.5.3
[***] Hardware
|
3-7 | |||
3.3.5.4
[***] Hardware
|
3-7 | |||
3.3.5.5
Hardware Test
|
3-7 | |||
3.4
PRODUCTION AND IMPLEMENTATION
|
3-7 | |||
3.4.1
Production Process, Quality Assurance, and Configuration
Management
|
3-7 | |||
3.4.2
COTS
|
3-8 | |||
3.4.2.1
COTS Procurement
|
3-8 | |||
3.4.2.2
COTS Performance Verification
|
3-8 | |||
3.4.2.3
COTS Post Installation Testing
|
3-8 | |||
3.5
TECHNICAL AND OPERATIONAL VERIFICATION PHASES
|
3-8 | |||
3.5.1
General
|
3-8 | |||
3.5.2
Test Objectives
|
3-9 | |||
3.5.3
Design Verification
|
3-9 | |||
3.5.4
Device Qualification Test
|
3-9 | |||
3.5.5
UE Integration
|
3-9 | |||
3.5.6
Integration with Additional terminals
|
3-10 | |||
3.5.7
Test Discrepancies
|
3-10 | |||
3.5.8
Test Reports
|
3-10 | |||
3.5.9
Technical Verification (reference S-BSS SOW section 4.2.8)
|
3-10 | |||
3.5.9.1
Technical Verification Review Purpose
|
3-10 | |||
3.5.9.2
Technical Verification Review Scope
|
3-10 | |||
3.5.9.3
Technical Verification Review Deliverables
|
3-10 | |||
3.5.9.4
Technical Verification Review Success Criteria
|
3-10 | |||
3.5.10
Operational Verification (reference S-BSS SOW section 3.5, 3.9, and
4.3)
|
3-11 | |||
3.5.10.1
Operational Readiness Review (XXX)
|
3-11 | |||
3.5.10.2
Operational Readiness Review Purpose
|
3-11 | |||
3.5.10.3
Operational Readiness Review Scope
|
3-11 | |||
3.5.10.4
Operational Readiness Review Deliverables
|
3-11 | |||
3.5.10.5
Operational Readiness Review Success Criteria
|
3-11 | |||
3.6
COMPONENT DELIVERABLES
|
3-12 | |||
3.6.1
[***] Reference Design
|
3-12 | |||
3.6.2
[***] Platform
|
3-12 | |||
3.7
DOCUMENTATION
|
3-13 | |||
3.7.1
Documentation Descriptions
|
3-15 | |||
3.7.1.1
Program Master Phasing Schedule
|
3-15 | |||
3.7.1.2
Program Management Plan
|
3-15 | |||
3.7.1.3
Product Assurance Plan
|
3-15 | |||
3.7.1.4
System Engineering Design Plan
|
3-15 | |||
3.7.1.5
Software Development Plan
|
3-15 | |||
3.7.1.6
Hardware Development Plan
|
3-15 | |||
3.7.1.7
Data Management Plan
|
3-15 | |||
3.7.1.8
System Performance Specification
|
3-16 |
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
iii
TerreStar
Satellite Chipset SOW
3.7.1.9
Interface Control Document
|
3-16 | |||
3.7.1.10
Hardware Requirements Document
|
3-16 | |||
3.7.1.11
Software Requirements Document
|
3-16 | |||
3.7.1.12
Integration and Test Plan
|
3-16 | |||
3.7.1.13
Specification Traceability Matrix
|
3-16 | |||
3.7.1.14
Hardware and Software Design Specifications
|
3-16 | |||
3.7.1.15
Manufacturing QA Plan
|
3-17 | |||
3.7.1.16
System Test Procedures
|
3-17 | |||
3.7.1.17
Test Reports
|
3-17 | |||
3.7.1.18
Project Status Reports
|
3-17 | |||
3.7.1.19
Support Plan
|
3-17 | |||
3.7.1.20
[***] Data Sheet
|
3-17 | |||
3.7.1.21
[***] Procurement Specification
|
3-17 | |||
3.8
CHIPSET PRICE ESTIMATES
|
3-17 | |||
3.9
CUSTOMER FURNISHED ITEMS
|
3-17 | |||
3.9.1
User Terminal Chipset, Vocoder, and Support
|
3-17 | |||
3.9.2
User Terminals using [***] and [***] Satellite Baseband
Hardware
|
3-19 | |||
3.9.3
CFE Design Materials Deliverables
|
3-19 | |||
3.9.3.1
[***]
|
3-19 | |||
3.9.3.2
[***]
|
3-20 | |||
3.10
DEVELOPMENT FLOW
|
3-21 | |||
3.10.1
[***] Development
|
3-21 | |||
3.10.2
[***] Development
|
3-23 | |||
4.0
PROJECT SCHEDULE
|
4-1 | |||
4.1
FULL REVENUE SERVICE
|
4-4 |
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
iv
TerreStar
Satellite Chipset SOW
LIST
OF FIGURES
Figure
|
Page
|
|||
Figure
3-1 Chipset Test Objectives
|
3-9 | |||
Figure 3-3 [***] Development | 3-23 |
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
v
TerreStar
Satellite Chipset SOW
LIST
OF TABLES
Table | Page | |||
Table
3-1. Contract Deliverable Schedule
|
3-14 | |||
Table
3-2. User Terminal Chipset, Vocoder and
Support
|
3-18 | |||
Table
3-3. User Terminals using [***] and [***] Satellite
Baseband Hardware
|
3-19 | |||
Table
3-4. CFE Design Materials Deliverables -- [***]
|
3-20 | |||
Table
-3-5. CFE Design Materials Deliverables --
[***]
|
3-20 | |||
Table
4-1. Satellite Chipset Master Project
Milestones
|
4-1 |
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
vi
TerreStar
Satellite Chipset SOW
REVISION
HISTORY
Date
|
Version
|
Description
|
Author
|
[***]
|
0.1
|
Initial
Draft
|
[***]
|
[***]
|
0.2
|
Draft
|
[***]
|
[***]
|
0.3
|
Preliminary
|
[***]
|
[***]
|
0.5
|
Various
Negotiation Updates. Made Consistent with S-BSS
SOW
|
[***]
|
[***]
|
1.0
|
Initial
Release with Contract
|
[***]
|
[***]
|
1.2
|
Final
Release Version with Contract
|
[***]
|
[***]
|
1.3
|
Final
Release Version with Contract (with additional HNS
Changes)
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
vii
TerreStar
Satellite Chipset SOW
1.0 INTRODUCTION
|
1.1 PURPOSE
AND OBJECTIVE
|
This
statement of work (SOW) is written as an amendment to the Satellite Base Station
Subsystem (S-BSS) Contract. It adds the tasks necessary to complete
one of the final critical components of the operational TerreStar Network (TSN),
user equipment (UE) comparable in size to today’s terrestrial cellular systems
for communication over the TSN.
The
Contractor shall supply the GMR-3G Satellite Chipset (the “Chipset”) Platform
(Satellite Baseband hardware and the SW Platform) to TerreStar and shall support
the TerreStar chosen terminal Vendor who will integrate, manufacture, and supply
TerreStar reference terminals based on the technology from
Contractor. In addition, the Contractor shall perform all tasks
necessary to support the integration, test, troubleshooting, and resolution of
all problems associated with the Chipset from start of integration with the
terminal supplier through handset certification for [***] and from the start of
integration with the S-BSS through Provisional and Final Acceptance for
[***].
To
eliminate any doubt about this Chipset Amendment, TerreStar’s intent with this
SOW is that the Contractor deliver satellite chipsets fully integrated with the
S-BSS that are capable of the required functionality from both the S-BSS and the
Chipset specifications as defined in this contract, as amended, when operating
from a terminal vendor supplied UE.
|
1.2 SCOPE
|
The
contractor shall be responsible for the design and development of the Chipset
within the timeframe defined in the milestone schedule. The schedule is based on
a [***] defined as [***]. [***] deliver an interim solution designed to provide
market ready handsets to meet the stringent start of revenue service milestones
of TerreStar. [***] also includes several SW releases to build
functionality. [***] shall be certified and available for revenue
service with the S-BSS functionality as modified through [***] and [***] at
Provisional and Final Acceptance. [***] focuses on [***] solution
intended to be a mid term solution on a technology roadmap that leads to a
universal chipset. [***] SW shall include the full functionality in the S-BSS
and Chipset specifications as modified through [***], [***], and
[***]. In general the scope of the development is as
follows:
The
Contractor:
|
·
|
Integrated
Program Management between the S-BSS and the
Chipset
|
|
·
|
Systems
engineering and evaluation of terminal
chipsets
|
|
·
|
Implement
the S-BSS developed Common Air Interface and design the necessary SW
modules for the Satellite mode protocol in the
UE
|
|
·
|
Satellite
mode baseband chip design ([***])
|
|
·
|
Evaluation
of terrestrial RF chipset
|
|
·
|
Development
of software for satellite mode layers access stratum and
below
|
|
·
|
Integration
of satellite mode
|
|
·
|
Support
for integration of satellite mode with terrestrial
mode
|
|
·
|
[***]
Prototype Design, Development, Integration, and
Test
|
|
·
|
[***]
Prototype Design, Development, Integration, and
Test
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
1-1
TerreStar
Satellite Chipset SOW
· Documentation
|
·
|
Management
of [***], release to production, and ongoing
production
|
TerreStar:
|
·
|
Overall
Terminal design
|
|
·
|
Selection/supply
of baseband terrestrial chipset (ATC
baseband)
|
|
·
|
Selection/supply
of RF chipset
|
|
·
|
Processor
and software for terminal, including: non-access stratum; ATC
access stratum; applications including voice codecs and other required
terminal features and functions (layers access stratum and
below)
|
|
·
|
Staged
supply of prototype User Equipment to the Contractor for integration
purposes.
|
|
·
|
Access
to satellite payload links as agreed in the S-BSS
SOW.
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
1-2
TerreStar
Satellite Chipset SOW
2.0 APPLICABLE
SPECIFICATIONS
The
Chipset development shall conform to the requirements in the following
specifications:
|
·
|
Exhibit
B, TSN_SAT_2_TRD-S-BSS Functional
Requirements
|
|
·
|
Exhibit
B2, TSN_SUB_2_TRD-Satellite Chipset Functional
Requirements
|
|
·
|
[***]
|
|
·
|
TSN
User Web Interface Specification (to be provided NLT
C-PDR)
|
The
following documents are included as reference documents to ensure all components
of the satellite segment are designed in a consistent manner where
applicable.
|
·
|
H34755_06-TS-0046-R1_Network
Management Architecture – SBAS Network Management
Architecture
|
|
·
|
H34932_06-TS-0059-R1_SBAS
to NOMC ICD – SBAS to Network Operations Center
ICD
|
|
·
|
H34924_06-TS-0060-R1_Resource
Management to SBAS ICD – Radio Resource Manager to SBAS
ICD
|
|
·
|
H35290_06-TS-0062-R2_FES
and Satellite ICD – Feeder Link Earth Station to TS-1 Satellite
ICD
|
|
·
|
H35012
_06-TS-0066-R1_CMS to GBBF ICD – Control and Management System to Ground
Based Beam Former ICD
|
|
·
|
ETSI
TS 376-4-12 V2.2.1
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
2-1
TerreStar
Satellite Chipset SOW
3.0 REQUIREMENTS
3.1 GENERAL
REQUIREMENTS
3.1.1 Chipset
Development
The
Contractor shall perform all tasks necessary to design, prototype, develop,
implement, test, support integration of the Chipset with the terminal vendor and
the S-BSS, and release a Chipset which meets the requirements set forth in this
SOW, the Chipset Technical Specification, and the certification requirements
that relate to the satellite portion of the UE.
The
Chipset development [***]. In [***], the Chipset shall be developed
using [***] to minimize development effort and to reduce risk in meeting TSN
operational requirements. Features are required to be compatible with and
provide the full S-BSS [***] functionality. Upgrades shall be
developed to be compatible with and provide the full S-BSS [***] functionality
certified and ready for revenue service at S-BSS Final Acceptance. In
[***], the Chipset is integrated [***] that supports the full S-BSS and CAI
functionality as defined in the TerreStar Network requirements specified in
Exhibit B and B2 of this Contract as modified with the O3M, C-PDR,
and P6M functionality.
The major
releases and the functionality of the Chipset in [***] are provided in the
following table. The major program milestones are contained in
section 4.0 .
[***]
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
3.2 PROGRAM
MANAGEMENT
3.2.1 Program
Management Organization
3.2.1.1 Program
Manager
The S-BSS
dedicated program manager shall assume responsibilities for accomplishment of
all the tasks defined in this SOW. This shall include planning,
directing, controlling, and reporting progress on all program activities from
contract award through [***] UE Certification.
There
will be a single Executive Engineering Manager overseeing the chipset and S-BSS
activities.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-1
TerreStar
Satellite Chipset SOW
3.2.1.2 Subcontracts
If the
Contractor elects to subcontract portions of the contract, the Contractor shall
provide technical and administrative subcontract management sufficient to ensure
successful performance of all subcontracts. Successful performance is
delivery of the required products on time, with full compliance to the technical
specifications. Procurement specifications shall be generated for all
subcontracts to assure compliance with the standards and requirements of this
contract. The Contractor shall ensure that maintenance and support is
provided, either by his own or subcontractor personnel, through successful
completion of UE certification for [***] and through the warranty
period.
3.2.1.3 Program
Communications
The
Program Manager shall be the principal interface between the Program and the
Contractor’s corporate organization, the Contractor and Subcontractors (if
applicable), and between the Contractor and the TerreStar Program Office for all
matters relating to the contract. The Program Manager shall also
serve as the focal point for the identification and resolution of all
problems.
3.2.2 Program
Plans
3.2.2.1 Program
Management Plan
The
Contractor shall update the S-BSS Program Management Plan (PMP) to include the
Chipset Program activities. The update, at a minimum, shall describe
the organizational structure changes and any changes to contractual and
technical lines of communication; update program responsibilities; update the
management objectives and priorities and any risk areas; update the risk
management process, if required; update personnel and staffing profiles and any
plans for using subcontractors; update all program interfaces, including any
subcontractor interfaces; update the documentation control and configuration
management processes, if required; and update the quality assurance processes,
if required.
The PMP
updates shall be submitted at the Chipset Amendment Kick-Off
Meeting. The Program Manager shall manage the Chipset program in
accordance with the approved PMP.
3.2.2.2 Program
Schedule
The
Contractor shall update the Master Schedule with Chipset tasks/milestones and
shall develop and maintain Detailed Chipset Program Schedules. The
Master Schedule shall clearly identify all key milestones including all
hardware, software, and data deliveries, all TerreStar-furnished items and the
date required, all deliveries to the terminal vendor and the date required, and
major technical and programmatic reviews. The Detailed Program
Schedules shall be used by the contractor to plan all tasks, task dependencies,
and critical path. The Detailed Program Schedules shall be updated
monthly to reflect program progress and provided to the TerreStar PMO with the
monthly status report.
The
Contractor may maintain a separate Master Schedule for the Chipset development,
however, the program interdependencies between the S-BSS development and the
Chipset development shall be contained in each schedule.
3.2.3 Program
Management Reviews, Meetings, and Status Reports
3.2.3.1 Kick-Off
Meeting
The
Contractor shall conduct a Program Kick-Off Meeting as scheduled in section
4.0 after contract amendment go ahead to ensure a mutual
understanding on all contractual requirements incorporated into the negotiated
contract and the Contractor’s Program Plan. The meeting shall review
the total program including contractual, technical, schedule, business conduct,
and risk and mitigation plans and how the Chipset development is coordinated and
synchronized with the S-BSS development. Business conduct
subjects
would include topics such as: lines of authority and communication, meeting
formats, TerreStar/Contractor Responsibilities, scope change process,
etc. The Contractor shall present a preliminary cost of the [***]
production Chipset. If the preliminary cost is greater than the
target cost contained in the contract, the Contractor shall review all cost
elements that are the basis of the cost estimate and propose potential cost
reduction opportunities. The Contractor shall deliver a Kick-Off
Meeting data package one week prior to the meeting that includes all the draft,
preliminary, and final documents listed in Table 3-1.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-2
TerreStar
Satellite Chipset SOW
3.2.3.2 Program
Status
The
Contractor shall provide TerreStar full visibility into all Chipset contractual
efforts through both formal and informal communications. The formal
communications shall be in the form of monthly program reviews, ad hoc meetings
to discuss contractual issues, and monthly written reports. The PMP
shall specify which metrics will be used to certify milestone
completion. When reasonable, S-BSS and Chipset formal meetings shall
be combined.
3.2.3.3 Monthly
Program Management Reviews
The
Contractor shall conduct Monthly Program Management Reviews (PMR) in conjunction
with the S-BSS PMR. Content of the PMR shall be as described in the
S-BSS SOW section 3.2.3.3.
3.2.3.4 Additional
Management Reviews
Additional
program management meetings shall be scheduled as required to insure TerreStar
is fully apprised of status and risk issues that might impact Chipset
functionality or delivery date.
3.2.4 Technical
Reviews, Meetings, and Reports
3.2.4.1 General
The
Contractor shall conduct formal reviews to provide TerreStar an assessment of
system performance. These reviews shall include a System Requirements
Review (C-SRR), a Preliminary Design Review (C-PDR), a Critical Design Review
(C-CDR) [***], and a Chipset Design Verification Test Review [***].
3.2.4.2 C-SRR
The
Contractor shall conduct the C-SRR at a mutually agreed time to select and
present the design concept, to review preliminary trade study results, prototype
status, the program schedule, and risk reduction efforts. The Contractor shall
deliver an C-SRR Data Package one week prior to the meeting that includes all
the draft, preliminary, and final documents listed in Table 3-1.
3.2.4.3 C-PDR
The
Contractor shall conduct a C-PDR at a mutually agreed time. The
Contractor shall: review the preliminary design, the air interface, and link
budgets; demonstrate achievability of critical designs; present the final
Chipset requirements, the final prototyping results of all critical units, the
program master schedule, the risk assessment and the risk mitigation plans. The
Contractor shall present the final cost of the [***] production Chipset as
mutually agreed. The Contractor shall deliver a C-PDR data package
two weeks prior to the meeting that includes all the draft, preliminary, and
final documents listed in Table
3-1.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-3
TerreStar
Satellite Chipset SOW
3.2.4.4 C-CDR
The
Contractor shall conduct C-CDRs ([***]) at a mutually agreed
time. The Contractor shall present data that verifies the final
design meets the Chipset Performance Specification, including link budgets, the
results of all remaining trade studies, the C-PDR risk mitigation results, the
program master schedule, and the Chipset test and qualification
plan. The Contractor shall deliver C-CDR data packages two weeks
prior to the meeting that includes all the draft, preliminary, and final
documents listed in Table
3-1.
3.2.4.5
Certification Go/No Go Review
The
Contractor shall support a UE Certification Go/No go Review held by the Terminal
Vendor. The Contractor shall present the results of the Chipset
integration and test activities with the Terminal Vendor and the S-BSS including
a functionality mapping of Chipset and S-BSS, all open problem reports with a
closure plan, certification support activities and expected certification
results. The Contractor shall provide a Go/No Go recommendation for
proceeding to UE certification.
3.2.4.5 Meeting
Minutes
The
Contractor shall provide reports and/or minutes for each of the technical
reviews including a listing of action items with specific closure dates for each
item. All engineering assumptions and agreements made or reached
during the technical meetings shall be documented in the minutes.
3.2.4.6 Additional
Meetings
The
Contractor or TerreStar may schedule additional meetings to provide a technical
interchange on topics requiring a greater level of detail or involvement of
technical specialists. An agenda for each technical interchange
meeting (XXX) shall be generated and copies distributed to all participants one
week prior to the XXX. The Contractor shall prepare minutes of each
XXX, including the assigned action item list, and deliver a copy to TerreStar
within one week after the XXX.
3.2.4.7 Readiness
Reviews
The
Contractor shall conduct Test Readiness Reviews prior to formal tests defined in
Section 3.5 of this SOW.
|
3.3 DESIGN
AND DEVELOPMENT
|
The
Contractor shall perform the system engineering, software design and
development, hardware design and development, and prototyping efforts necessary
to ensure that the Chipset satisfies all of the functional and performance
requirements set forth in the Chipset Procurement Specification and that the
Chipset as designed will be fully operational with the S-BSS.
3.3.1 UMTS
Compatibility
The
Contractor shall provide a roadmap for Chipset upgrade from [***] to UMTS [***]
in conjunction with the S-BSS roadmap as described in the S-BSS SOW section
3.3.1.
3.3.2 Export
Compliance
In
conjunction with the S-BSS export compliance analysis (ref S-BSS SOW section
3.3.2), the Contractor shall perform an analysis of the Chipset components and
shall determine the applicable export compliance regulations
(e.g. International Traffic in Arms Regulations (ITAR) or Export Authorization
Regulations (EAR). A preliminary assessment shall be made by the
Kick-Off Meeting. Final rulings from the appropriate export control
authorities shall be received NLT C-PDR.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-4
TerreStar
Satellite Chipset SOW
3.3.3 System
Engineering
The
Contractor shall establish a system engineering office within the Chipset
program organization and shall maintain this office throughout the duration of
the program. This office shall implement and maintain the System
Design Plan approved at the Kick-Off Meeting, and shall ensure that all design
activities are conducted in accordance with the provisions of the
plan.
The
system engineering office shall have the overall responsibility of ensuring that
the Chipset is in full compliance with the functional and performance
requirements and that it is fully operational with the S-BSS. The
Contractor’s system engineering office shall perform the following specific
tasks and others as necessary.
3.3.3.1 System
Design
The
Contractor shall develop, in accordance with the design plan and the Chipset
Functional specification, a Chipset concept and top level subsystem design and
shall document that design in the System Performance Specification
(SPS). The system design functions shall be allocated to hardware,
software, and procedures, and documented in the Hardware Requirements Document
and the Software Requirements Document. User Interface concepts shall
be fully documented and coordinated with the Terminal Vendor and
TerreStar.
The
Contractor shall ensure that the satellite chipset platform interfaces with the
selected RF Chipset platform and other handset components to meet the TerreStar
link budget requirements.
3.3.3.2 Common
Air Interface Specification
The
Contractor shall ensure the Chipset design supports the GMR-3G CAI developed
under the S-BSS SOW (ref BSS SOW section 3.3.3.2).
3.3.3.3 Interface
Control Document
The
Contractor shall develop an ICD that defines external and internal interfaces
and is compatible with the terminal vendor interfaces.
3.3.3.4 Analysis
and Simulation
The
Contractor shall perform analysis, simulation and modeling necessary to ensure
that the Chipset meets the performance requirements. The results of
these studies shall be presented at C-PDR. The Analysis and
Simulation Plan shall be presented and agreed to at C-SRR.
3.3.3.5 Control
and Management
The
Contractor shall ensure the Chipset is compatible with the TerreStar Subscriber
Web Interface and that the satellite component of the UE can accept user
configuration parameters from that interface. Design to be agreed at
C-PDR.
3.3.4 Software
Design and Development
3.3.4.1 Software
Development Plan
The
Contractor shall provide a Software Development Plan (SDP) in accordance with
paragraph 3.7.1.5 of this SOW. The S/W development shall be
managed in accordance with the SDP through delivery of [***]. The
Contractor shall support the integration and testing of the satellite chipset
into the UE and the S-BSS.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-5
TerreStar
Satellite Chipset SOW
3.3.4.2 Contractor
Developed Software
The
Contractor shall design, code, integrate, test, deliver, and repair all the
software required for Chipset operation and maintenance, including, over-the-air
software installation in accordance with the Chipset specification to update the
UE for full S-BSS [***] Functionality. The Contractor shall specify the software
language to be used.
3.3.4.3 Software
Development
Where
Contractor-developed software or Contractor-modified commercially available,
off-the-shelf software is used as part of the design, the S/W shall be developed
or modified in accordance with the Contractor’s approved SDP. The Contractor
shall provide all licenses and documentation required for system operation. S/W
developed or modified under this contract, including all related documentation
and source code, shall be delivered as described in the Contract.
3.3.4.4 Software
Design Documentation
The
Contractor shall document functional software requirements in the Software
Design Specification, validating the traceability of the requirements from the
System Performance Specification. The Software Design Specification detail shall
be sufficient to ensure a common understanding of the requirements; ensure that
requirements are complete, consistent, and testable; and define the inputs and
outputs for every function. The software shall be designed, selected, or
developed to facilitate life-cycle maintenance and over-the-air UE modification
and updating in accordance with the specification.
3.3.4.5 Software
Test
The
Contractor shall generate and use test plans, procedures, and reports to verify
that each software configuration item (SWCI) performs in accordance with
individual SWCI test specifications and the CI interface requirements. TerreStar
shall have the right to observe and monitor the CI tests. Following completion
of testing, the Contractor shall document the test results, deviations from test
procedures, and all software anomalies and submit a report to
TerreStar.
The
Contractor shall support Chipset integration and test with the UE and the
S-BSS. The Contractor shall provide all necessary test tools and
equipment to support Chipset integration and test with the UE and the
S-BSS.
3.3.5 Hardware
Design and Test
3.3.5.1 Hardware
Development Plan
The
Contractor shall provide a Hardware Development Plan (HDP) in accordance with
paragraph 3.7.1.6 of this SOW. The H/W
development shall be managed in accordance with the HDP through delivery of all
functionality releases of the Chipset Program.
All
hardware designed or modified, developed, manufactured, assembled, and tested by
the Contractor or its Subcontractors shall be in accordance with the
requirements of the Program Product Assurance Plan. The Contractor
shall document functional hardware requirements in the Hardware Design
Specification, validating the traceability of the requirements from the System
Performance Specification. The Hardware Design Specification detail shall be
sufficient to ensure a common understanding of the requirements; ensure that
requirements are complete, consistent, and testable; and define the inputs and
outputs for every function. The hardware shall be designed and selected or
developed to facilitate life-cycle maintenance
and to permit access to facilitate replacement of components. The Contractor
shall provide recommended procedures for maintaining the equipment in the CI and
System Maintenance Procedures.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-6
TerreStar
Satellite Chipset SOW
3.3.5.2 Contractor
Developed Hardware
The
Satellite Baseband hardware [***]. The Contractor shall perform the
planning, coordination, and implementation of the tasks required to develop the
Chipset hardware developed tools, engineering aids, simulators, and tests
aids.
3.3.5.3 [***]
Hardware
In [***],
the Contractor shall design and deliver a reference design using [***] (ref
section 3.1.1 ) capable of performing all [***] functionality
in accordance with the specification. A prototype of this design
shall be made available to TerreStar’s chosen terminal vendor. The terminal
vendor shall manufacture [***] UE. The Contractor shall provide all necessary
documentation to enable the terminal vendor to manufacture, integrate, and test
the reference platform design in a user terminal. The Contractor
shall support the integration and testing of the satellite chipset into the
UE.
3.3.5.4 [***]
Hardware
In [***],
the Contractor shall design and deliver the complete satellite baseband [***]
capable of performing S-BSS [***] functionality. A prototype of this
design shall be made available to TerreStar’s chosen terminal vendor. The
terminal vendor shall manufacture [***] UE with [***] provided by the
contractor. The Contractor shall provide all necessary documentation to enable
the terminal vendor to manufacture, integrate, and test the reference platform
design in a user terminal. The Contractor shall support the
integration and testing of the satellite chipset into the UE.
3.3.5.5 Hardware
Test
The
Contractor shall generate and utilize test plans, procedures, and reports to
verify that each hardware configuration item (HWCI) performs in accordance with
individual CI test specifications and the interface requirements for each input
and output port. TerreStar shall have the right to observe and monitor the CI
tests. Following completion of testing, the Contractor shall document the test
results, deviations from test procedures, and all hardware anomalies and submit
a report to TerreStar. The Contractor shall support Chipset
integration and test with the UE and the S-BSS. The Contractor shall
provide all necessary test tools and equipment to support Chipset integration
and test with the UE and the S-BSS.
3.4 PRODUCTION
AND IMPLEMENTATION
3.4.1 Production
Process, Quality Assurance, and Configuration Management
The
Contractor shall establish a production process and be responsible for the
procurement, manufacture, assembly, test and integration of the hardware and
software required for the delivery of a complete and operating
Chipset.
All
production and implementation of deliverable equipment shall be in accordance
with the requirements of the Chipset Hardware Development Plan, Software
Development Plan, the Product Assurance Plan, and the Manufacturing Quality
Assurance Plan.
The
Contractor shall be responsible for the configuration management of the
Contractor-controlled baseline and shall maintain configuration management until
completion of Chipset [***] Certification in accordance with the schedule in
section 4.0 .
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-7
TerreStar
Satellite Chipset SOW
3.4.2 COTS
3.4.2.1 COTS
Procurement
The
Contractor shall be responsible for the procurement of the COTS hardware and
software and for the verification of its performance. All COTS components shall
be selected to facilitate life-cycle maintenance. The configuration shall permit
SW/FW over-the-air updates over both the satellite and ATC networks where
appropriate. The terminal vendor shall be responsible for procuring
any required COTS for the reference UE and manufacturing other than the Chipset
prototypes provided by the Contractor (ref section
3.6 ).
If
commercial off-the-shelf (COTS) software is used in the design, it shall be
products with demonstrable probability for support five years after [***], [***]
Final Acceptance.
3.4.2.2 COTS
Performance Verification
The
Contractor shall define the specific verification methods to be used to assure
the acceptable performance of all COTS hardware and software items selected to
fulfill the Chipset requirements. For equipment acquired from original equipment
manufacturers or other vendors, one or more levels of testing may be performed
in the factory according to vendor's methods which conform to industry
standards, or according to approved procedures. Factory demonstrations,
post-installation verification testing and other standard evaluation methods to
ensure that acquired components operate as specified shall be identified in the
System Integration and Test Plan. Vendor-supplied documentation, including
user's guides and operation procedures, shall be validated for accuracy and
completeness for UE use prior to final acceptance from the vendor.
3.4.2.3 COTS
Post Installation Testing
Following
installation in the reference UE, additional COTS functional and performance
tests may be required to ensure that the item has been properly integrated with
other UE components and continues to operate as specified. It shall be the
Contractor's responsibility to insure ongoing satellite UE operation and
performance in accordance with the requirements of the
specification.
|
3.5 TECHNICAL
AND OPERATIONAL VERIFICATION PHASES
|
3.5.1 General
The
Contractor shall demonstrate Chipset Technical and Functionality performance in
a series of formal tests and demonstrations using simulators/emulators, and
actual operational components. The formal tests shall be executed using Test
Procedures approved by TerreStar and generated in accordance with the
System Integration and Test Plan. The formal tests and demonstrations shall
include active TerreStar and QA participation in development and execution of
procedures and delivery of a working UE from TSN. The Contractor shall execute
the following formal tests: DVT, prior to the final delivery of the [***]
hardware solutions to the terminal vendor; Technical and Operational
Verification Tests in conjunction with the S-BSS; and a Device Qualification
Test (DQT) for [***]. During the Operational Verification Test
executed by TerreStar, the Contractor shall provide Chipset technical support
throughout the duration of the test. Each formal test shall be
preceded by a Test Readiness Review (TRR) conducted by the Contractor.
During the TRR, all aspects of the formal test shall be reviewed and
assessed for readiness to start testing including personnel, hardware, software,
procedures, and external coordination (i.e. satellite monitoring, external
interface support, etc.). A go/no-go assessment is made by TerreStar at the
conclusion of the TRR.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-8
TerreStar
Satellite Chipset SOW
TerreStar
desires joint participation in the TVT and OVT to facilitate a more rapid
transition to operations. During the TVT, both TerreStar and Contractor
personnel shall take part in the integration and test activities as active
members of the test team, under the direction of Contractor
management. During OVT, both TerreStar and Contractor personnel shall
take part in the test activities as active members of the test team, under the
direction of TerreStar management.
3.5.2 Test
Objectives
Each
Formal Test accomplishes the following. The Contractor
responsibilities for each of these tests are stated in other parts of the
SOW.
Figure 3-1 Chipset Test
Objectives
Test
|
Objective
|
Entry
Criteria
|
Success
Criteria
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
3.5.3 Design
Verification
The DVT
is a hardware centric test. The functions and objective performance
of each Chipset Functionality Release shall be verified during a DVT
[***].
3.5.4 Device
Qualification Test
At the
completion of DVT, the [***]. The DQT encompasses [***]. DQT ensures
that the [***] manufactured in high volume.
3.5.5 UE
Integration
The
Contractor shall support integration of all hardware and software elements of
[***] into the UE. The Contractor shall use the integrated
satellite/ATC UE to perform integration of the UE with the S-BSS and other TSN
segments as described in the S-BSS documentation. The integration
activities shall be in accordance with the Contractor developed System
Integration and Test Plan and the Product Assurance Plan and shall include
TerreStar engineers under the direction of Contractor management. Full access to
all System components at all times shall be granted to TerreStar
personnel.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-9
TerreStar
Satellite Chipset SOW
3.5.6 Integration
with Additional terminals
The
contractor shall support user terminal integration for up to two additional RF
[***].
The
contractor shall support user terminal integration for up to two additional
[***].
3.5.7 Test
Discrepancies
The
Contractor shall use its approved Product Assurance Plan processes to document,
correct, and regression test system test discrepancies. These discrepancies
shall be corrected prior to the start of the next formal test or at a later time
approved by TerreStar.
3.5.8 Test
Reports
The
Contractor shall prepare test reports documenting the results of the test
activity, including procedures executed, procedure pass/fail status,
discrepancies discovered, and data collected. Discrepancies that cause system
degradation or indicate a failure to meet performance specifications shall be
discussed with system impact defined and correction plans
indicated.
3.5.9 Technical
Verification (reference S-BSS SOW section 4.2.8)
Technical
verification shall be conducted according to the Contractor's Program Management
Plan, System Integration and Test Plan (includes S-BSS and Chipset), the Product
Assurance Plan, and the Contractor developed test procedures. Suggested efforts
are as follows and required milestones are defined. Each
Functionality Release shall have a Technical Verification Test.
3.5.9.1 Technical
Verification Review Purpose
There
shall be a Technical Verification Review (TVR) [***] to determine: 1) if the
technical performance of Chipset/S-BSS meets the requirements of Exhibit B and
2) if the required functionality and capacity for the release is operating in
accordance with the design and requirements.
3.5.9.2 Technical
Verification Review Scope
During
the TVRs the Contractor shall present information on the readiness of the
Chipset/S-BSS including: a review of the Technical Verification Test results to
validate proper technical performance; a complete report on all open problem
reports that summarize the issue, the severity, the resolution plan, and when
the problem will be available for integration into the operational system;
operations and maintenance procedures; Chipset/S-BSS stability and availability;
and other technical and operational readiness issues.
3.5.9.3
Technical Verification Review Deliverables
Test
Reports; technically verified Chipset/S-BSS; problem report work-off
plan.
3.5.9.4 Technical
Verification Review Success Criteria
The data
presented at the TVR shall be assessed and a determination made on the readiness
of the Chipset/S-BSS to enter the Operational Verification Phase. The
following criteria shall be met. An
assessment
that the Chipset/S-BSS is ready for Operational Verification must be made to
successfully complete the TVR.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-10
TerreStar
Satellite Chipset SOW
|
-
|
All
technical specifications required for the release
met.
|
|
-
|
Chipset
and S-BSS operate together to provide the communications functionality
specified
|
|
-
|
All
revenue impacting problem reports
closed.
|
|
-
|
Mutually
agreed work off plan for all open problem
reports
|
3.5.10 Operational
Verification (reference S-BSS SOW section 3.5, 3.9, and 4.3)
Operational
verification shall be conducted according to the Contractor's Program Management
Plan, TerreStar System Integration and Test Plan (includes S-BSS and Chipset),
the Product Assurance Plan, and the jointly developed operational procedures.
Each Functionality Release shall have an Operational Verification
Test.
3.5.10.1 Operational
Readiness Review (XXX)
3.5.10.2 Operational
Readiness Review Purpose
There
shall be an XXX for each [***] to determine if the required functionality and
capacity for the release is operating in accordance with the design and
requirements.
3.5.10.3 Operational
Readiness Review Scope
Review
Operational Verification Test results for trouble reports, system stability,
operational procedure quality, personnel training, and other pertinent
requirements.
During
the ORRs the Contractor shall present information on the readiness of the
Chipset/S-BSS including: a review of the Chipset/S-BSS technical performance
during the Operational Verification Test to validate proper technical
performance; a complete report on all open problem reports that summarize the
issue, the severity, the resolution plan, and when the problem will be available
for integration into the operational system; Chipset/S-BSS stability and
availability; and other technical and operational readiness issues.
3.5.10.4
Operational Readiness Review Deliverables
Operationally
verified Chipset/S-BSS. Problem report work-off plan.
3.5.10.5 Operational
Readiness Review Success Criteria
The data
presented at the XXX will be assessed and a determination made on the readiness
of the Chipset/S-BSS to enter Revenue Service. The following criteria
shall be met. An assessment that the Chipset/S-BSS is ready for
Revenue Service must be made to successfully complete the XXX and for
Provisional and/or Final Acceptance to occur.
|
-
|
All
technical specifications required for the release
met.
|
|
-
|
All
revenue impacting problem reports
closed.
|
|
-
|
Chipset/S-BSS
system meets availability requirements as defined in Exhibit
B.
|
|
-
|
Items
identified as required for the XXX in the TVT problem report work off plan
successfully completed
|
|
-
|
All
Operations and Maintenance Handover tasks
completed
|
|
-
|
Mutually
agreed work off plan for all open problem
reports
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-11
TerreStar
Satellite Chipset SOW
3.6 COMPONENT
DELIVERABLES
The
Contractor shall deliver the hardware and software required to provide the full
capability and service features for each Functionality Release as described in
the Functional Requirements that are fully compatible with
S-BSS. These
include:
|
·
|
Intermediate
Deliverables – Section 4.0 describes several intermediate
deliverables the Contractor shall make primarily to the terminal
vendor. These deliverables are critical to the work flow
required to provide a market ready handset. The deliverables
and the associate success criteria shall be defined as described in
section 3.7.1.1
|
|
·
|
Fully
Certified [***] Satellite Component (TerreStar will conduct the
certification, but Final Acceptance shall not occur until certification is
successfully completed) for TerreStar UE, operational in the each final
factor delivered from the Terminal Vendor, and fully integrated and
operational with the S-BSS
|
|
o
|
[***]
Reference Design using COTS HW
|
o
|
[***]
SW , as modified by [***], [***], and [***], operational in each form
factor
|
|
o
|
[***],
S-BSS [***] SW, as modified by [***], [***], [***], with all [***] problem
report resolutions
|
|
·
|
Fully
Certified [***] Satellite Component (TerreStar will conduct the
certification, but Final Acceptance shall not occur until certification is
successfully completed) for TerreStar UE, operational in final form factor
delivered from the Terminal Vendor, and fully integrated and operational
with the S-BSS
|
|
o
|
Reference
Design using [***] HW
|
|
o
|
[***],
S-BSS [***] SW, as modified by [***], [***], [***] with all [***] problem
report resolutions incorporated
|
3.6.1 [***]
Reference Design
The
Contractor shall deliver 30 units reference hardware containing the satellite
baseband solution in a form to be agreed at [***]. The reference
design shall satisfy the functional and technical requirements specified in the
Chipset and S-BSS Technical Specifications as modified by [***], [***], and
[***] analyses and shall be fully compliant with all certification
requirements. SW/FW for [***] shall be delivered in a minimum of
[***] releases. The [***] release shall provide the full capability
of the [***] S-BSS and the GMR-3G CAI as modified by the [***], [***], and [***]
analyses. The [***] HW and SW shall be fully compliant with the
certification requirements (ref section 2.0 ). The
final release shall provide the full capability of the [***] S-BSS and the
GMR-3G CAI as modified by the [***], [***], and [***] analyses. The
[***] HW and SW shall be fully compliant with all certification requirements
(ref section 2.0 ).
3.6.2 [***]
Platform
The
Contractor shall deliver 100 units of the [***] satellite baseband
solution. The [***] shall satisfy the functional and technical
requirements specified in the Chipset Technical and S-BSS Technical
Specifications as modified by [***], [***], and [***] analyses and shall be
fully compliant with all certification requirements. SW/FW for [***]
shall be delivered in a minimum of one release. The need for a second
release shall be mutually agreed to at C-PDR. The release shall
provide the full capability of the [***] S-BSS and the GMR-3G CAI as modified by
the [***], [***], and [***] analyses. The [***] HW and SW shall be
fully compliant with all certification requirements (ref section
2.0 ).
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-12
TerreStar
Satellite Chipset SOW
3.7 DOCUMENTATION
The
Contractor shall follow industry standard documentation and data management
practices and procedures.
Documentation
shall be delivered in a format compatible with the latest version of Microsoft
Office Professional Edition 2003 or higher and shall be transferred
electronically. Delivery shall be in accordance with the schedules defined below
and shall allow a minimum of three weeks for TerreStar review prior to approval.
TerreStar shall approve/disapprove all documentation within four weeks of
receipt of final copy. Information contained in each document shall be as
proposed by the Contractor. The documents to be delivered for the Kick-Off
Meeting shall be delivered for review at a mutually agreed date to allow
TerreStar sufficient preparation time for the meeting.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-13
TerreStar
Satellite Chipset SOW
Table
3-1. Contract Deliverable Schedule
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
[***]
|
||||
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
[***]
|
||||
[***]
|
[***]
|
[***]
|
||||
[***]
|
[***]
|
[***]
|
[***]
|
|||
[***]
|
[***]
|
[***]
|
||||
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
[***]
|
||||
[***]
|
[***]
|
|||||
[***]
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-14
TerreStar
Satellite Chipset SOW
3.7.1.1 Program
Master Phasing Schedule
The
Program Master Phasing Schedule shall define the following:
|
·
|
The
top level milestones phased with the TerreStar Master Program milestones
and the terminal vendor milestones to ensure Chipset development, test,
and integration supports TerreStar program
objectives.
|
|
·
|
Detailed
task lists that define all the tasks required for successful completion of
the program.
|
Note:
|
A
rolling wave plan may be used that details in high detail the next 3-4
months of effort and lesser detail further out in the time
line. As each month goes by, detail is added to maintain the
3-4 month “rolling wave” of detail.
|
|
·
|
The
Master Phasing Schedule shall be delivered and baselined at the Kick-Off
review. All milestones required for fully coordinated reference
terminal and Chipset programs shall be presented. All
coordination milestones shall fully define the item to be delivered (e.g.
specification, prototype HW, diagnostic SW, etc), the acceptance criteria
to be satisfied before the item is accepted, and the potential impact to
subsequent execution of either program and ultimately to UE certification
and S-BSS and Chipset Acceptance. Changes to the baseline
schedule shall be approved by
TerreStar.
|
3.7.1.2 Program
Management Plan
The
program management plan, developed as part of the S-BSS development program,
shall be updated to cover the chipset development activities.
3.7.1.3 Product
Assurance Plan
The
product assurance plan, developed as part of the S-BSS development program,
shall be updated to cover the chipset development activities.
3.7.1.4 System
Engineering Design Plan
The
engineering design plan, developed as part of the S-BSS development program,
shall be updated to cover the chipset development activities.
3.7.1.5 Software
Development Plan
The
Contractor shall provide a Software Development Plan in accordance with normally
accepted commercial practice. The plan shall be delivered in final at the
Kick-Off Meeting.
3.7.1.6 Hardware
Development Plan
The
Contractor shall provide a Hardware Development Plan that defines the hardware
development process to be used for the development of the [***] reference
daughter card and [***].
3.7.1.7 Data
Management Plan
The data
management plan, developed as part of the S-BSS development program, shall be
updated to cover the chipset development activities.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-15
TerreStar
Satellite Chipset SOW
3.7.1.8 System Performance Specification
The
System Performance Specification shall define the functional performance,
interface, and quality requirements of the Chipset and shall include a
verification matrix to define how and when each requirement in the SPS will be
verified (analysis, inspection, test, computer simulation; unit test, subsystem
test, etc.).
In
particular, the performance limits of the [***] deliverables will be
identified.
3.7.1.9 Interface
Control Document
The
Contractor shall provide an Interface Control Document that describes both
physically and functionally all internal and external system
interfaces.
3.7.1.10 Hardware
Requirements Document
The
Contractor shall provide a Hardware Requirements Document that allocates
functional and performance requirements from the SPS to the system hardware.
This document shall be used as the basis for the Hardware Design
Specification.
3.7.1.11 Software
Requirements Document
The
Contractor shall provide a Software Requirements Document that allocates
functional and performance requirements from the SPS to the system software.
This document shall be used as the basis for the Software Design
Specification.
3.7.1.12 Integration
and Test Plan
The
Contractor shall provide a Chipset Platform Integration and Test Plan that
reasonably conforms with the Test Concept document previously provided to
Contractor and that details the test philosophy and test process to be used to
accomplish system integration and technical and operational verification. The
plan shall include structured progressively more complex testing, that is, unit
tests, CI integration tests, subsystem integration tests, consent-to-ship tests,
technical verification tests, and operational acceptance tests. The
plan shall define Contractor and TerreStar participation in each test
phase. The plan shall specify retest requirements and test
environments. The plan shall include a Verification Cross Reference
Matrix (VCRM) that maps the requirements of the specifications and the SOW to
the test phase and shall indicate the verification method (inspection,
documentation, test, or analysis).
The Test
Plan shall define a problem reporting process that contains defined severity
levels with Contractor response and resolution times specified.
3.7.1.13 Specification
Traceability Matrix
The
specification traceability matrix as part of the S-BSS development program,
shall be updated to cover the chipset development activities.
3.7.1.14 Hardware
and Software Design Specifications
The
Contractor shall provide design specifications for each hardware and software
configuration item. The specification shall be written in a format provided by
the Contractor and shall include: a configuration item definition, interface
definitions, major components, characteristics, design and construction
standards, physical and functional characteristic, and test requirements,
etc.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-16
TerreStar
Satellite Chipset SOW
3.7.1.15 Manufacturing
QA Plan
The
manufacturing QA plan, developed as part of the S-BSS development program, shall
be updated to cover the chipset development activities.
3.7.1.16 System
Test Procedures
The
Contractor shall develop System Test Procedures to test and validate system
performance during the formal test activities.
3.7.1.17 Test
Reports
The
Contractor shall deliver a test report at the conclusion of each formal test
activity. These reports are described in paragraph 3.5.2.
3.7.1.18 Project
Status Reports
The
project status reports, developed as part of the S-BSS development program,
shall be updated to cover the chipset development activities.
3.7.1.19 Support
Plan
The
Contractor shall develop a Support Plan which details the organization and
activities necessary to provide support for Chipset.
3.7.1.20 [***]
Data Sheet
The
Contractor shall provide an [***] Data Sheet that describes the
[***].
3.7.1.21 [***]
Procurement Specification
The
Contractor shall provide an [***] procurement specification that defines the
[***] marking, [***].
3.8 CHIPSET
PRICE ESTIMATES
The
consumer market for cellular equipment has proven to be extremely sensitive to
internal component prices. Small percentage increases can cause the
handset price to exceed consumer expectations and result in reduced
sales. With this background, it is imperative that the Contractor and
TerreStar work together to ensure a Chipset price that is in line with TerreStar
market needs and competitive with other consumer wireless
devices. This process will evolve from preliminary cost estimates
through to final pricing including volume discounts. The Contractor
shall support TerreStar in developing these price estimates starting at
C-SRR. All pricing will be finalized in a subsequent Production
Contract.
3.9 CUSTOMER
FURNISHED ITEMS
TerreStar
shall provide suitable design documentation and support materials according to
the following schedules.
3.9.1 User
Terminal Chipset, Vocoder, and Support
Note:
Anywhere ATC baseband processor is mentioned in the following tables it may mean
ATC baseband chip only, ATC baseband chip plus multimedia accelerator, or ATC
baseband chip plus additional application processor.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-17
TerreStar
Satellite Chipset SOW
Table
3-2. User Terminal Chipset, Vocoder and
Support
|
||
Section
|
Reference
|
Requirement
|
3.9.1
|
1
|
TerreStar
shall conclude the
evaluation and selection of the ATC Baseband Processor and the Satellite
RF chipsets by [***].
|
2
|
TerreStar
shall provide the
detailed specification, reference development boards, samples and access
to the design support of ATC Baseband Processor and Satellite RF chipsets
by [***].
|
|
3
|
Final
Vocoder selection and specifications by [***] (The Contractor and TSN in
cooperation).
|
|
4
|
TerreStar
shall provide the
vocoder software in suitable form for the satellite mode that resides in
the ATC Baseband processor by [***].
|
|
5
|
TerreStar
shall provide the
support to define the Hardware and Software ICD between the Satellite and
ATC Baseband in accordance with the Deliverable Schedule in Table
3-4.
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-18
TerreStar
Satellite Chipset SOW
Table
3-3. User Terminals using [***] Satellite Baseband
Hardware
|
||
Section
|
Reference
|
Requirement
|
3.9.2
|
1
|
TerreStar
shall provide
non-form (“Macro Based”) fit prototype User Equipment (UE) that uses the
[***] Satellite Baseband solution in accordance with the milestone
schedule in Section 4. Twenty-four (24) units required. Non Access Stratum
code required. This is for integration with the Contractor Protocol Stack
and Physical Layer
|
2
|
TerreStar
shall provide form
fit prototype User Equipment (UE) that uses the [***] Satellite Baseband
solution by in accordance with the milestone schedule and functionality
defined in Section 4. Twenty-four (24) units required.
|
|
3
|
TerreStar
shall provide
prototype User Equipment (UE) that uses the [***] Satellite Baseband
solution in accordance with the milestone schedule in Section 4.
Twenty-four (24) macro board units and 24 form fit units
required.
|
|
4
|
TerreStar
shall provide the
necessary UE technical support during the Integration, Technical, Design,
and Operational Verification Phases.
|
|
5
|
TerreStar shall provide a phone
test tool to exercise and monitor message activity of the Non-access
Stratum (NAS) stack on the ATC baseband processor. Need time no
later than [***]. The test tool is ATC Baseband Processor
dependent. The desired capabilities are as agreed in a telcon
between the terminal vendor and the Contractor on [***], and include:
scripting and logging functionality; interfaces to monitor UMTS L2/L3
layer activity; interfaces to monitor GMR3G L2/L3
activity. This test tool will be used to drive the UE when
testing with S-BSS. The Contractor will require training and
technical support on the prototypes and test tool. TerreStar
shall provide a date the test tool is available for Contractor use at
C-SRR.
|
3.9.3 CFE
Design Materials Deliverables
TerreStar
shall provide suitable design documentation and support materials according to
the following schedule.
TerreStar
shall support the integration of the software in the ATC Baseband processor that
includes training and documentation. The integration of the satellite
mode with the ATC Baseband processor may involve modifications to the
terrestrial mode physical layer drivers and access to terrestrial mode
data.
3.9.3.1 [***]
The
Terminal Vendor contract has not been finalized at the time of the finalization
of this SOW. Therefore, the delivery of schematics and reference
boards is subject to the selected manufacturer having the items available for
Contractor use. The Contractor and TerreStar shall develop a mutually
agreeable workaround if any of this data is unavailable.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-19
TerreStar
Satellite Chipset SOW
Table
3-4. CFE Design Materials Deliverables --
[***]
|
|||
Section
|
Reference
|
Requirement
|
|
3.9.3.1
|
1
|
[***]
|
[***]
|
2
|
[***]
|
[***]
|
|
3
|
[***]
|
[***]
|
|
4
|
[***]
|
[***]
|
|
5
|
[***]
|
[***]
|
|
6
|
[***]
|
[***]
|
|
7
|
[***]
|
[***]
|
|
8
|
[***]
|
[***]
|
|
9
|
[***]
|
[***]
|
|
10
|
[***]
|
[***]
|
|
11
|
[***]
|
[***]
|
|
12
|
[***]
|
[***]
|
|
13
|
[***]
|
[***]
|
|
14
|
[***]
|
[***]
|
3.9.3.2 [***]
Table
-3-5. CFE Design Materials Deliverables --
[***]
|
|||
Section
|
Reference
|
Requirement
|
|
3.9.3.2
|
1
|
[***]
|
[***]
|
2
|
[***]
|
[***]
|
|
3
|
[***]
|
[***]
|
|
4
|
[***]
|
[***]
|
|
5
|
[***]
|
[***]
|
|
6
|
[***]
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-20
TerreStar
Satellite Chipset SOW
Table
-3-5. CFE Design Materials Deliverables --
[***]
|
|||
Section
|
Reference
|
Requirement
|
|
7
|
[***]
|
[***]
|
|
8
|
[***]
|
[***]
|
|
9
|
[***]
|
[***]
|
|
10
|
[***]
|
[***]
|
|
11
|
[***]
|
[***]
|
|
12
|
[***]
|
[***]
|
|
13
|
[***]
|
[***]
|
|
14
|
[***]
|
[***]
|
|
15
|
[***]
|
[***]
|
3.10 DEVELOPMENT
FLOW
3.10.1 [***]
Development
Once the
selection of the ATC Baseband and RF Chips are made, the Contractor shall start
the build of the [***] reference platform. The Contractor shall
deliver the [***] hardware to the terminal vendor. The terminal
vendor shall integrate the [***] hardware into a prototype reference user
terminal provided to the Contractor for software verification. The
Contractor shall release a minimum of three diagnostic software releases to the
terminal vendor at the dates listed in section
4.0 . Patches and other software problem fixes shall
be provided as necessary to successfully complete the reference UE
design. These software releases are intended to verify the [***]
hardware interfaces and basic receive and transmit functionality. At
the completion of the diagnostic integration, the Contractor shall carry out a
Design Verification Test (DVT) to validate all performance and functional
attributes of the [***] chipset platform. At this point,
pre-production parts will be available and the reference UE will be provided to
the Contractor. The Contractor shall then be responsible for
integration and test of the satellite air interface protocol as described in the
S-BSS SOW. TerreStar and the reference terminal vendor shall support
this integration and test as necessary to resolve issues that
arise.
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-21
TerreStar
Satellite Chipset SOW
[***]
Figure
3-1 [***] Development
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-22
TerreStar
Satellite Chipset SOW
3.10.2 [***]
Development
In [***]
Development, the [***] development can begin [***]. The [***]
development process includes design, verification, [***]. The [***]
prototypes shall be provided to the terminal vendor for integration into a [***]
reference UE. Similar to the process described in section
3.10.1 the [***] shall be verified jointly with the terminal
vendor using Contractor diagnostic releases. At the completion of the
diagnostic integration, the Contractor shall carry out a DVT to validate all
performance and functional attributes of the [***] chipset
platform. At this point, pre-production parts will be available and
the [***] reference UE will be provided to the Contractor. The
Contractor shall then be responsible for integration and test of the satellite
portion, including all mobility functionality, with the
S-BSS. TerreStar and the reference terminal vendor shall support this
integration and test as necessary to resolve issues that arise.
After
DVT, the Contractor will also carry out DQT after which [***] will be made
available to the terminal vendor.
[***]
Figure
3-2 [***] Development
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
3-23
TerreStar
Satellite Chipset SOW
4.0 PROJECT
SCHEDULE
As stated
throughout this SOW, the Chipset and S-BSS development, through the Chipset
Amendment, are considered one program with three projects (S-BSS, [***] Chipset,
and [***] Chipset). In addition, the Chipset and terminal vendor
projects are critically interdependent. Each of the milestones
identified in section 3.9 above, the tables below, and others
to be identified in more detailed planning between the parties, is critical to
developing an operational UE. If the Contractor or TerreStar fail to
meet a milestone, the lost schedule time may not be recoverable. The
Contractor and TerreStar shall make best efforts to meet each milestone with the
required functionality. Continual monitoring of program progress
shall be made with schedule risks and potential impacts identified as soon as
possible. If a milestone is missed, the affected party shall
immediately notify the other of the impact to future deliveries. Both
parties shall work to mitigate the impact and recover the lost schedule time if
possible. Mitigation actions shall be mutually agreed and direction
to implement the mitigation plan shall be made by TerreStar.
Table 4-1. Satellite Chipset Master Project
Milestones
|
|||
No.
|
Milestone
Activity
|
Purpose
|
Date
|
1.
|
[***]
|
[***]
|
[***]
|
2.
|
[***]
|
[***]
|
[***]
|
3
|
[***]
|
[***]
|
[***]
|
3a.
|
[***]
|
[***]
|
[***]
|
4.
|
[***]
|
[***]
|
[***]
|
5.
|
[***]
|
[***]
|
[***]
|
6.
|
[***]
|
[***]
|
[***]
|
7.
|
[***]
|
[***]
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
4-1
TerreStar
Satellite Chipset SOW
Table 4-2. Satellite Chipset [***] Project
Milestones
|
|||
No.
|
Milestone
Activity
|
Purpose
|
Date
|
1.
|
[***]
|
[***]
|
[***]
|
2
|
[***]
|
[***]
|
[***]
|
3
|
[***]
|
[***]
|
[***]
|
4
|
[***]
|
[***]
|
[***]
|
5
|
[***]
|
[***]
|
[***]
|
6
|
[***]
|
[***]
|
[***]
|
7
|
[***]
|
[***]
|
[***]
|
8
|
[***]
|
[***]
|
[***]
|
9
|
[***]
|
[***]
|
[***]
|
10
|
[***]
|
[***]
|
[***]
|
11.
|
[***]
|
[***]
|
[***]
|
12.
|
[***]
|
[***]
|
[***]
|
13.
|
[***]
|
[***]
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
4-2
TerreStar
Satellite Chipset SOW
Table 4-2. Satellite Chipset [***] Project
Milestones
|
|||
No.
|
Milestone Activity | Purpose |
Date
|
13a
|
[***]
|
[***]
|
[***]
|
14
|
[***]
|
[***]
|
[***]
|
14a
|
[***]
|
[***]
|
[***]
|
15
|
[***]
|
[***]
|
[***]
|
15a
|
[***]
|
[***]
|
[***]
|
16
|
[***]
|
[***]
|
[***]
|
17
|
[***]
|
[***]
|
[***]
|
Table
4-3. Satellite Chipset [***] Project
Milestones
|
|||
No.
|
Miles
|
Purpose
|
Date
|
0
|
[***]
|
[***]
|
[***]
|
1.
|
[***]
|
[***]
|
[***]
|
2.
|
[***]
|
[***]
|
[***]
|
3
|
[***]
|
[***]
|
|
4
|
[***]
|
[***]
|
[***]
|
5
|
[***]
|
[***]
|
[***]
|
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
4-3
TerreStar
Satellite Chipset SOW
Table
4-3. Satellite Chipset [***] Project
Milestones
|
|||
No. |
Milestone
Activity
|
Purpose
|
Date
|
6
|
[***]
|
[***]
|
[***]
|
7
|
[***]
|
[***]
|
[***]
|
8
|
[***]
|
[***]
|
[***]
|
9
|
[***]
|
[***]
|
[***]
|
10
|
[***]
|
[***]
|
[***]
|
4.1 FULL
REVENUE SERVICE
The
Chipset/S-BSS [***] Operational Readiness Review shall be held prior to the
Start of Revenue Service (ref S-BSS SOW paragraph
3.1 ). The Key Milestone, Provisional Acceptance,
shall be not later than [***].
Use
or disclosure of the data contained on this sheet is subject to the restriction
on the title page.
4-4
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Exhibit
B2
Satellite Base Station
Subsystem (S-BSS) and Chipset
Functional
Requirements
TSN_SUB_2_TRD-Satellite
Chipset Functional Requirements
Version
5.1 April
27, 2007
Xxxxxx Network Systems, LLC | |||
00000
Xxxxxxxxxxx Xxxx
|
|||
Xxxxxxxxxx, Xxxxxxxx 00000 |
/s/
Xxxxxxx Xxxxxxx
|
TerreStar Networks Inc. | |||
One Discovery Place | |||
00000 Xxxxxx Xxxxx Xxxx, 0xx Xxxxx | |||
Xxxxxx, Xxxxxxxx 00000 |
/s/ Xxxx
Xxxxxx
|
TERRESTAR
PROPRIETARY
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
PROPRIETARY
NOTICE
This
document contains data and information proprietary to TerreStar Networks
Inc. This data is being furnished pursuant to the provisions of the
Contract between TerreStar Networks Inc. and Xxxxxx Network Systems, LLC
for the TerreStar Satellite Base Station Subsystem. Xxxxxx
Network Systems, LLC and TerreStar Networks Inc. shall have the right to
duplicate, use or disclose the data and information to the extent
specified in the Contract and herein.
|
Information
included in this Exhibit may contain technical data
controlled by the Export Administration Regulations ("EAR")
and/or the International Traffic in Arms Regulations
("ITAR"). This document has not been cleared for export or
transfer to a Foreign Person or foreign entity.
|
TERRESTAR
PROPRIETARY
ii
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
TABLE
OF CONTENTS
SECTION
|
PAGE
|
|||
1.0
INTRODUCTION
|
1-1 | |||
1.1
PURPOSE AND SCOPE
|
1-1 | |||
1.2
DOCUMENT HIERARCHY
|
1-1 | |||
1.3
DOCUMENT CONVENTIONS
|
1-2 | |||
1.4
DEFINITIONS
|
1-2 | |||
2.0
GMR-3G SATELLITE CHIPSET PLATFORM
|
2-1 | |||
2.1
OVERVIEW
|
2-1 | |||
2.2
SATELLITE BASEBAND [***] DEVELOPMENT [***]
|
2-2 | |||
2.2.1
[***] Development
|
2-2 | |||
2.2.2
[***] Development
|
2-3 | |||
3.0
SATELLITE BASEBAND [***] HARDWARE PLATFORM ([***])
|
3-1 | |||
3.1
ARCHITECTURE
|
3-1 | |||
3.2
REQUIREMENTS
|
3-2 | |||
3.2.1
Functional Requirements
|
3-2 | |||
3.2.1.1
Two Antenna Operation
|
3-4 | |||
3.2.2
Performance Requirements
|
3-4 | |||
3.2.2.1
Link Performance Requirements
|
3-4 | |||
3.2.2.2
RF Performance Requirements
|
3-6 | |||
3.2.3
Encryption
|
3-8 | |||
3.2.4
Power Savings Mode
|
3-8 | |||
3.2.5
Test Features
|
3-8 | |||
3.2.6
Interface Requirements
|
3-9 | |||
3.2.6.1
ADC Interface
|
3-9 | |||
3.2.6.2
DAC Interface
|
3-9 | |||
3.2.6.3
Serial Interface
|
3-10 | |||
3.2.6.4
I2C Interface
|
3-10 | |||
3.2.6.5
IF/RF Interface
|
3-10 | |||
3.2.6.6
Ethernet Interface
|
3-10 | |||
3.2.6.7
GPIO Interface
|
3-11 | |||
3.2.6.8
Debug Interface
|
3-11 | |||
3.2.6.9
Clock Interface
|
3-11 | |||
3.2.6.10
External Memory Interface
|
3-11 | |||
3.2.7
Physical & Environmental Requirements
|
3-12 | |||
3.2.8
Power Requirements
|
3-12 | |||
4.0
SATELLITE BASEBAND [***] HARDWARE PLATFORM FOR
[***]
|
4-1 | |||
4.1
[***] ARCHITECTURE
|
4-1 | |||
4.2
[***] REQUIREMENTS
|
4-2 | |||
4.2.1
Functional Requirements
|
4-2 | |||
4.2.2
Interface Requirements
|
4-2 | |||
4.2.3
Physical Requirements
|
4-3 |
TERRESTAR
PROPRIETARY
iii
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.0 SATELLITE
BASEBAND SOFTWARE PLATFORM
|
5-1 | |||
5.1
OVERVIEW
|
5-1 | |||
5.2
ARCHITECTURE
|
5-1 | |||
5.3
SATELLITE BASEBAND SOFTWARE PLATFORM REQUIREMENTS
|
5-2 | |||
5.3.1
Access Stratum Functional Requirements
|
5-2 | |||
5.3.2
DSP/PHY Functional Requirements
|
5-3 | |||
5.3.3
Services
|
5-3 | |||
5.3.3.1
VoIP
|
5-4 | |||
5.3.3.2
Emergency Voice Calling
|
5-4 | |||
5.3.3.3
IP Multicast and Push-to-Talk Voice
|
5-4 | |||
5.3.3.4
Data Services
|
5-5 | |||
5.3.3.5
Video Services
|
5-5 | |||
5.3.3.6
Multimedia
|
5-5 | |||
5.3.4
Security
|
5-5 | |||
5.3.5
Handoff
|
5-6 | |||
5.3.6
Power Control
|
5-6 | |||
5.3.7
Hybrid ARQ
|
5-6 | |||
5.3.8
Single Antenna Interference Cancellation
|
5-6 | |||
5.3.9
Power Management
|
5-7 | |||
5.3.10
Management and Diagnostic Features
|
5-7 | |||
5.3.11
Operating System Requirements
|
5-7 | |||
5.3.12
Processing Requirements
|
5-7 | |||
5.3.13
Memory Requirements
|
5-7 | |||
5.3.14
Interface Requirements
|
5-8 | |||
5.4
PERFORMANCE ENHANCING PROXY (PEP)
|
5-8 | |||
5.5
ATC PROCESSOR REQUIREMENTS (CFE)
|
5-8 | |||
6.0
SCHEDULE OF FEATURE RELEASES
|
6-1 | |||
7.0
ACRONYMS AND ABBREVIATIONS
|
7-1 |
TERRESTAR
PROPRIETARY
iv
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
LIST
OF FIGURES
FIGURE
|
PAGE
|
|||
Figure
2-1. GMR-3G Satellite Chipset Platform
Architecture
|
2-1 | |||
Figure
2-2. GMR-3G Satellite Baseband [***] Solution application
for [***]
|
2-3 | |||
Figure 2-3. GMR-3G
Satellite Baseband [***] Application for [***]
|
2-4 | |||
Figure
3-1. Satellite Baseband [***] Architecture for
[***]
|
3-2 | |||
Figure
4-1. Discrete Satellite Baseband Solution Architecture
for [***]
|
4-1 | |||
Figure
5-1. UMTS/GMR-3G Protocol Stack
|
5-2 |
TERRESTAR
PROPRIETARY
v
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
LIST
OF TABLES
TABLE
|
PAGE
|
|||
Table 1-1. Document
Hierarchy
|
1-1 | |||
Table 1-2. Requirement
Specification Table Format
|
1-2 | |||
Table
3-1. Functional Requirements
|
3-2 | |||
Table
3-2. Two Antenna Operation
|
3-4 | |||
Table
3-3. Transmit Modulation, Coding, and Information
Rates
|
3-4 | |||
Table
3-4. Receive Modulation, Coding, and Information
Rates
|
3-5 | |||
Table
3-5. Receive Es/No (Modem to Modem)
|
3-6 | |||
Table
3-6. RF Performance Requirements
|
3-7 | |||
Table
3-7. Encryption
|
3-8 | |||
Table
3-8. Power Savings Mode
|
3-8 | |||
Table
3-9. Test Features
|
3-8 | |||
Table
3-10. ADC Interface
|
3-9 | |||
Table
3-11. DAC Interface
|
3-9 | |||
Table
3-12. Serial Interface
|
3-10 | |||
Table
3-13. I2C Interface
|
3-10 | |||
Table
3-14. IF/RF Interface
|
3-10 | |||
Table
3-15. Ethernet Interface
|
3-10 | |||
Table
3-16. GPIO Interface
|
3-11 | |||
Table
3-17. Debug Interface
|
3-11 | |||
Table
3-18. Clock Interface
|
3-11 | |||
Table
3-19. External Memory Interface
|
3-11 | |||
Table
3-20. Physical & Environmental
Requirements
|
3-12 | |||
Table
3-21. Power Requirements
|
3-12 | |||
Table
4-1. [***] Exceptions
|
4-2 | |||
Table
4-2. Interface Requirements
|
4-2 | |||
Table
5-1. Access Stratum Functional
Requirements
|
5-2 | |||
Table
5-2. DSP/PHY Functional Requirements
|
5-3 | |||
Table
5-3. VoIP
|
5-4 | |||
Table
5-4. Emergency Voice Calling
|
5-4 | |||
Table
5-5. IP Multicast and Push-to-Talk Voice
|
5-4 | |||
Table
5-6. Data Services
|
5-5 | |||
Table
5-7. Video Services
|
5-5 | |||
Table
5-8. Multimedia
|
5-5 | |||
Table
5-9. Security
|
5-5 | |||
Table
5-10. Handoff
|
5-6 | |||
Table
5-11. Power Control
|
5-6 | |||
Table
5-12. Hybrid ARQ
|
5-6 | |||
Table
5-13. Single Antenna Interference
Cancellation
|
5-6 | |||
Table
5-14. Power Management
|
5-7 | |||
Table
5-15. Management and Diagnostic Features
|
5-7 | |||
Table
5-16. Operating System Requirements
|
5-7 | |||
Table
5-17. Memory Requirements
|
5-7 | |||
Table
5-18. Interface Requirements
|
5-8 | |||
Table
5-19. PEP Requirements
|
5-8 | |||
Table
5-20. Imposed Requirements for the CFE ATC Processor and
NAS
|
5-9 |
TERRESTAR
PROPRIETARY
vi
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
1.0 INTRODUCTION
1.1 PURPOSE
AND SCOPE
The
document is the technical specification for the GMR-3G Satellite Chipset
Platform supporting the operation of terminals over the satellite portion of the
TerreStar 3G networks.
Xxxxxx is
responsible for delivering the Satellite Baseband solution and the GMR-3G
software. The Satellite Baseband hardware is being developed in
[***]. [***]. This document provides the requirements for
[***] hardware platform and the associated software.
Section
2.0 provides an overview of the architecture for the GMR-3G Satellite Chipset
Platform. Section 3.0 details the [***] architecture and requirements
while Section 4.0 provides the requirements for the
[***]. Section 5.0 provides the details of the software
components that Xxxxxx offers to develop to support satellite operation for
TerreStar terminals.
The
assumption in this document is that Xxxxxx will supply the [***] to a
Terrestar-Selected vendor [***].
1.2 DOCUMENT
HIERARCHY
Table 1-1. Document
Hierarchy
|
||
No.
|
Document
|
Content
|
1.
|
Contract
|
Terms
and Conditions
|
2.
|
Exhibit
A
Exhibit
A2
|
Statement
of Work, S-BSS
Statement
of Work, Chipset Platform
|
3.
|
Exhibit
B
Exhibit
B2
|
S-BSS
Technical Specification
GMR-3G
Satellite Chipset Platform Technical Specification
|
4.
|
Exhibit
C
Exhibit
C2
|
Price
Schedule and Payment Milestones
Chipset
Platform Price Schedule and Payment Milestones
|
5.
|
Exhibit
D
Exhibit
D2
|
Options
Chipset
Platform
Options
|
TERRESTAR
PROPRIETARY
1-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
1.3 DOCUMENT
CONVENTIONS
The
meaning of the following terms is appropriate throughout this Technical
specification document:
Shall
|
Represents
a mandatory requirement that must be implemented in full by the Contractor
or Customer as noted.
|
Should
|
Represents
a desirable, but not legally required, act, or omission, whose
implementation (in full or in part) is considered advantageous to the
service.
|
Shall
not
|
Represents
a requirement that will not under any circumstances be implemented by the
defined party.
|
The
requirement numbers shall comprise the
specification section number from the table, concatenated with the reference
number from the table, for example, 2.1.1 or 2.1.3 in the Table 1-2
example.
Parameters
that are in square brackets are subject to change. The contractor
shall propose final
numbers at C-PDR.
Table 1-2. Requirement
Specification Table Format
|
||
Section
|
Reference
|
Requirement
|
X.X
(e.g.,
2.1)
|
1
|
The
GMR-3G Satellite Chipset Platform shall
…
|
2
|
The
GMR-3G Satellite Chipset Platform shall
…
|
|
3
|
The
GMR-3G Satellite Chipset Platform shall
…
|
1.4 DEFINITIONS
ATC Baseband
Processor
[***].
SAT Baseband
Processor
[***].
TERRESTAR
PROPRIETARY
1-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
2.0 GMR-3G
SATELLITE CHIPSET PLATFORM
2.1 OVERVIEW
The
GMR-3G Satellite chipset platform consists of a Xxxxxx supplied [***] hardware
and Xxxxxx supplied [***] software. The GMR-3G Satellite chipset platform
[***].
It is
assumed that the GMR-3G Satellite Chipset Platform hosts [***].
The
operational concept of the GMR-3G Satellite Chipset Platform is to [***]
functions operating under the control and supervision of the
[***]. Overall terminal operation, application processing, voice and
or video coding, terrestrial communications (UMTS or GSM) and user interface
functions are performed by the [***].
The RF
Components: [***]. A high-level block diagram of the Satellite
Chipset platform as used in a terminal is shown in Figure 2-1.
[***]
Figure
2-1. GMR-3G Satellite Chipset Platform
Architecture
TERRESTAR
PROPRIETARY
2-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
2.2 SATELLITE
BASEBAND [***] DEVELOPMENT PHASES
The
Satellite Chipset Platform will be developed [***].
2.2.1 [***]
Development
[***]
[***]
[***]
TERRESTAR
PROPRIETARY
2-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
Figure
2-2. GMR-3G Satellite Baseband Discrete Solution application
for [***]
2.2.2 [***]
Development
[***]
[***]
TERRESTAR
PROPRIETARY
2-3
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
Figure 2-3. GMR-3G
Satellite Baseband [***] Application for [***]
TERRESTAR
PROPRIETARY
2-4
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.0 SATELLITE
BASEBAND [***] HARDWARE PLATFORM ([***])
3.1 ARCHITECTURE
[***]
[***]
[***]
[***]
[***]
[***]
[***]
[***]
[***]
TERRESTAR
PROPRIETARY
3-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
Figure
3-1. Satellite Baseband [***] Architecture for
[***]
3.2 REQUIREMENTS
3.2.1 Functional
Requirements
Table
3-1. Functional Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
3-1. Functional Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-3
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.1.1 Two
Antenna Operation
Table
3-2. Two Antenna Operation
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.2 Performance
Requirements
3.2.2.1 Link
Performance Requirements
[***]
Table
3-3. Transmit Modulation, Coding, and Information
Rates
|
||||||
Reference
|
Modulation
|
Approx.
Effective
Code
Rate
|
BW
(KHz)
|
Symbol
Rate
|
Approx.
Net
Payload Bit
Rate
(Kb/s)
|
Gross
Bit
Rate
(Kb/s)
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-4
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
Table
3-4. Receive Modulation, Coding, and Information
Rates
|
||||||
Reference
|
Modulation
|
Approx.
Effective
Code
Rate
|
BW
(KHz)
|
Symbol
Rate
|
Approx.
Net
Payload Bit
Rate
(Kb/s)
|
Gross
Bit
Rate
(Kb/s)
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
[***]
TERRESTAR
PROPRIETARY
3-5
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
3-5. Receive Es/No (Modem to Modem)
[***]
|
||||||
Reference
|
Modulation
|
FEC
|
Approx
Code Rate
|
Symbol
Rate (KS/s)
|
Required
Es/No (dB)
|
BER/FER
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|||||
[***]
|
[***]
|
3.2.2.2 RF
Performance Requirements
[***]
Table
3-6. RF Performance Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-6
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
3-6. RF Performance Requirements
|
||
Section
|
Reference
|
Requirement
|
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-7
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.3 Encryption
Table
3-7. Encryption
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
3.2.4 Power
Savings Mode
Table
3-8. Power Savings Mode
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.5 Test
Features
Table
3-9. Test Features
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
||
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
|
[***]
|
TERRESTAR
PROPRIETARY
3-8
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.6 Interface
Requirements
3.2.6.1 ADC
Interface
Table
3-10. ADC Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.6.2 DAC
Interface
Table
3-11. DAC Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-9
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.6.3 Serial
Interface
Table
3-12. Serial Interface
|
|||
Section
|
Reference
|
Requirement
|
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
||
[***]
|
[***]
|
3.2.6.4 I2C
Interface
Table
3-13. I2C Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
3.2.6.5 IF/RF
Interface
Table
3-14. IF/RF Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.6.6 Ethernet
Interface
Table
3-15. Ethernet Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-10
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.6.7 GPIO
Interface
Table
3-16. GPIO Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
3.2.6.8 Debug
Interface
Table
3-17. Debug Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
3.2.6.9 Clock
Interface
Table
3-18. Clock Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.6.10 External
Memory Interface
Table
3-19. External Memory Interface
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-11
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
3.2.7 Physical
& Environmental Requirements
Table
3-20. Physical & Environmental
Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
3.2.8 Power
Requirements
Table
3-21. Power Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
3-12
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
4.0 SATELLITE
BASEBAND [***]
HARDWARE
PLATFORM [***]
4.1 [***]
ARCHITECTURE
[***]
[***]
[***]
[***]
[***].
[***]
[***]
Figure
4-1. [***] Satellite Baseband Solution Architecture for
[***]
[***]
TERRESTAR
PROPRIETARY
4-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
[***]
[***]
4.2 [***]
REQUIREMENTS
4.2.1 Functional
Requirements
The [***]
solution shall have the same functionality as described in Chapters 1, 2, 3 and
5 except as noted in Table 4-1 as exceptions.
Table
4-1. [***] Exceptions
|
||
Section
|
[***] Reference
Paragraph
|
Exception
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
4.2.2 Interface
Requirements
Table
4-2. Interface Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
4-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
4.2.3 Physical
Requirements
Table
4-3. Physical Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
4-3
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.0 SATELLITE
BASEBAND SOFTWARE PLATFORM
5.1 OVERVIEW
[***]
5.2 ARCHITECTURE
[***]
TERRESTAR
PROPRIETARY
5-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
[***]
[***]
Figure
5-1. UMTS/GMR-3G Protocol Stack
5.3 SATELLITE
BASEBAND SOFTWARE PLATFORM REQUIREMENTS
5.3.1 Access
Stratum Functional Requirements
Table
5-1. Access Stratum Functional
Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
5-1. Access Stratum Functional
Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.2 DSP/PHY
Functional Requirements
Table
5-2. DSP/PHY Functional Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.3 Services
[***]
TERRESTAR
PROPRIETARY
5-3
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.3.3.1 VoIP
[***]
Table
5-3. VoIP
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.3.2 Emergency
Voice Calling
[***]
Table
5-4. Emergency Voice Calling
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.3.3 IP
Multicast and Push-to-Talk Voice
Table
5-5. IP Multicast and Push-to-Talk
Voice
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-4
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
5-5. IP Multicast and Push-to-Talk
Voice
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
5.3.3.4 Data
Services
Table
5-6. Data Services
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.3.5 Video
Services
Table
5-7. Video Services
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.3.6 Multimedia
Table
5-8. Multimedia
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.4 Security
Table
5-9. Security
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-5
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.3.5 Handoff
Table
5-10. Handoff
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.6 Power
Control
Table
5-11. Power Control
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.7 Hybrid
ARQ
Table
5-12. Hybrid ARQ
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.8 Single
Antenna Interference Cancellation
Table
5-13. Single Antenna Interference
Cancellation
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-6
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.3.9 Power
Management
Table
5-14. Power Management
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
5.3.10 Management
and Diagnostic Features
Table
5-15. Management and Diagnostic
Features
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
5.3.11 Operating
System Requirements
Table
5-16. Operating System Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.12 Processing
Requirements
[***]
[***]
5.3.13 Memory
Requirements
Table
5-17. Memory Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-7
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Table
5-17. Memory Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.3.14 Interface
Requirements
Table
5-18. Interface Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
5.4 PERFORMANCE
ENHANCING PROXY (PEP)
[***]
Table
5-19. PEP Requirements
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-8
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
5.5 ATC
PROCESSOR REQUIREMENTS (CFE)
Table
5-20. Imposed Requirements for the CFE ATC Processor and
NAS
|
||
Section
|
Reference
|
Requirement
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
5-9
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
6.0 SCHEDULE
OF FEATURE RELEASES
Release
|
Feature
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
|
[***]
.
TERRESTAR
PROPRIETARY
6-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
7.0 ACRONYMS
AND ABBREVIATIONS
Acronym
|
Description
|
3G
|
The
wireless technology deployed in the W-CDMA/UMTS
network.
|
3GPP
|
Third-Generation
Partnership Project
|
ADC
|
Analog
to Digital Converter
|
API
|
Application
Programming Interface
|
ARM
|
Advanced
RISC Machine
|
ARQ
|
Automatic
Repeat reQuest
|
[***]
|
[***]
|
ATC
|
Ancillary
Terrestrial Component
|
[***]
|
[***]
|
BCCH
|
Broadcast
Control Channel
|
BER/FER
|
Bit
Error Rate/Frame Error Rate
|
BMC
|
Broadcast
Multicast Control
|
BP
|
Baseband
Processor
|
CMOS
|
Complementary
Metal Oxide Semiconductor
|
CPLD
|
Complex
Programmable Logic Device
|
DAC
|
Digital
to Analog Converter
|
[***]
|
[***]
|
[***]
|
[***]
|
EVM
|
Error
Vector Magnitude
|
FEC
|
Forward
Error Correction
|
FPGA
|
Field
Programmable Gate Array
|
TERRESTAR
PROPRIETARY
7-1
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Acronym | Description |
FTP
|
File
Transfer Protocol
|
GMM
|
GPRS
Mobility Management
|
GMMAS-SAP
|
GPRS
Mobility Management SAP
|
GMR
|
GEO
Mobile Radio
|
GMR-3G
|
GEO
Mobile Radio 3rd
Generation
|
GPIO
|
General
Purpose Input Output
|
GPRS
|
General
Packet Radio Service
|
GPS
|
Global
Positioning System
|
GSM
|
Global
System for Mobile Communications
|
GSMS
|
GPRS
Short Message Service
|
ICD
|
Interface
Control Document
|
IP
|
Internet
Protocol
|
LDPC
|
Low-Density
Parity-Check
|
MAC
|
Media
Access Control
|
[***]
|
[***]
|
MIMO
|
Multiple
Input Multiple Output
|
MIPS
|
Million
Instructions Per Second
|
MM
|
Mobility
Management
|
MMI
|
Man
Machine Interface
|
MSS
|
Mobile
Satellite Service
|
NAS
|
Non-Access
Stratum
|
NVRAM
|
Non-Volatile
Random Access Memory
|
[***]
|
[***]
|
TERRESTAR
PROPRIETARY
7-2
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Acronym | Description |
[***]
|
[***]
|
PA
|
Power
Amplifier
|
PDCP
|
Packet
Data Convergence Protocol
|
C-PDR
|
Chipset
Preliminary Design Review
|
PEP
|
Performance
Enhancement Proxy
|
PHY
|
Physical
Layer
|
PLL
|
Phase
Lock Loop
|
PTT
|
Push
to Talk
|
QoS
|
Quality
of Service
|
QPSK
|
Quadrature
Phase-Shift Keying
|
[***]
|
[***]
|
RAB
|
Radio
Access Bearer
|
RABM
|
Radio
Access Bearer Management
|
RABMAS-SAP
|
Radio
Access Bearer Management SAP
|
RAM
|
Random
Access Memory
|
RAN
|
Radio
Access Network
|
RF
|
Radio
Frequency
|
RLC
|
Radio
Link Control
|
RMII
|
Reduced
Media Independent
|
RRC
|
Radio
Resource Controller
|
RSSI
|
Received
Signal Strength Indication
|
RTOS
|
Real
Time Operating System
|
RX
ADC
|
Receiver
Analog to Digital
Converter
|
TERRESTAR
PROPRIETARY
7-3
TERRESTAR
CHIPSET FUNCTIONAL REQUIREMENTS
Acronym | Description |
SAP
|
Service
Access Point
|
SAT
|
Satellite
|
S-BSS
|
Satellite
Base Station Subsystem
|
SM
|
Session
Management
|
SoC
|
System-on-Chip
|
SPI
|
Serial
Peripheral Interface
|
SS
|
Supplementary
Services
|
TBD
|
To
Be Determined
|
TX
DAC
|
Transmitter
Digital to Analog Converter
|
UART
|
Universal
Asynchronous Receiver Transmitter
|
UE
|
User
Equipment
|
UE
SW
|
User
Equipment Software
|
UMTS
|
Universal
Mobile Telecommunications System
|
UMTS
NAS
|
UMTS
Non-Access Stratum
|
USB
|
Universal
Serial Bus
|
USIM
|
Universal
Subscriber Identity Module
|
VDD
|
Voltage
dd
|
VoIP
|
Voice
over
IP
|
TERRESTAR
PROPRIETARY
7-4
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
Exhibit
C2
TerreStar
Chipset
Price
and Payment Milestone Schedule
Version
2.6 May
2, 2007
Xxxxxx Network Systems, LLC | |||
00000
Xxxxxxxxxxx Xxxx
|
|||
Xxxxxxxxxx, Xxxxxxxx 00000 |
/s/
Xxxxxxx Xxxxxxx
|
TerreStar Networks Inc. | |||
One Discovery Place | |||
00000 Xxxxxx Xxxxx Xxxx, 0xx Xxxxx | |||
Xxxxxx, Xxxxxxxx 00000 |
/s/ Xxxx
Xxxxxx
|
This
document contains data and information proprietary to TerreStar Networks
Inc. and Xxxxxx Network Systems, LLC. This data is being
furnished pursuant to the provisions of the Contract between TerreStar
Networks Inc. and Xxxxxx Network Systems, LLC for the TerreStar Satellite
Base Station Subsystem. Xxxxxx Network Systems, LLC and
TerreStar Networks Inc. shall have the right to duplicate, use or disclose
the data and information to the extent specified in the Contract and
herein.
|
Information
included in this Exhibit may contain technical data
controlled by the Export Administration Regulations ("EAR") and/or
the International Traffic in Arms Regulations ("ITAR"). This
document has not been cleared for export or transfer to a Foreign
Person or foreign entity.
|
Page 1 of
6
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
TABLE
OF CONTENTS
SECTION
|
PAGE
|
|||
1.1
PURPOSE AND SCOPE
|
4 | |||
1.2
DOCUMENT HIERARCHY
|
4 | |||
2.0
PRICE SCHEDULE
|
5 | |||
2.1
CHIPSET BASELINE PRICE
|
5 | |||
2.2
CHIPSET OPTION PRICES
|
5 | |||
3.0
CHIPSET PAYMENT PLAN
|
6 |
Page 2 of
6
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
LIST
OF TABLES
TABLE
|
PAGE
|
|||
Table 1-1. Document
Hierarchy
|
4 |
Page 3 of
6
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
1.1 PURPOSE
AND SCOPE
This
Exhibit covers the Price Schedule and Payment Plan for the work that will be
performed by Xxxxxx Network Systems, LLC (the Contractor) for the design,
development, fabrication, implementation, integration, delivery, performance
verification, and testing of [***] for the TerreStar Chipset.
1.2 DOCUMENT
HIERARCHY
Table 1-1. Document
Hierarchy
|
||
No.
|
Document
|
Content
|
1.
|
Contract
|
Terms
and Conditions
|
2.
|
Exhibit
A
|
S-BSS
Statement of Work
|
3
|
Exhibit
A2
|
Chipset
Statement of Work
|
4.
|
Exhibit
B
|
S-BSS
Technical Specifications
|
5.
|
Exhibit
B2
|
Chipset
Technical Specifications
|
6.
|
Exhibit
C
|
S-BSS
Price Schedule
|
7.
|
Exhibit
C2
|
Chipset
Price Schedule
|
8.
|
Exhibit
D
|
S-BSS
Options
|
9.
|
Exhibit
D2
|
Chipset
Options
|
Page 4 of
6
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
2.0 PRICE
SCHEDULE
2.1 CHIPSET
BASELINE PRICE
Item
|
Description
|
Price
|
1
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
||
[***]
|
||
[***]
|
[***]
|
|
[***]
|
||
[***]
|
||
[***]
|
[***]
|
|
[***]
|
||
2
|
[***]
|
[***]
|
[***]
|
[***]
|
|
[***]
|
||
[***]
|
||
[***]
|
||
[***]
|
[***]
|
|
[***]
|
||
[***]
|
||
[***]
|
||
[***]
|
||
[***]
|
||
[***]
|
[***]
|
|
[***]
|
||
[***]
|
||
3
|
[***]
|
[***]
|
TOTAL
|
$ [***]
|
2.2 CHIPSET
OPTION PRICES
Item
|
Description
|
Price
|
1
|
[***]
|
[***]
|
[***]
|
||
[***]
|
Page 5 of
6
TERRESTAR
CHIPSET PAYMENT MILESTONE SCHEDULE
3.0 CHIPSET
PAYMENT PLAN
Number
|
Payment
Milestone
|
Percentage
of
Chipset
Amendment
Value
|
Date
|
1
|
[***]
|
[***]
|
[***]
|
2
|
[***]
|
[***]
|
[***]
|
2a
|
[***]
|
[***]
|
[***]
|
3
|
[***]
|
[***]
|
[***]
|
4
|
[***]
|
[***]
|
[***]
|
5
|
[***]
|
[***]
|
[***]
|
5a
|
[***]
|
[***]
|
[***]
|
6
|
[***]
|
[***]
|
[***]
|
7
|
[***]
|
[***]
|
[***]
|
8
|
[***]
|
[***]
|
[***]
|
9
|
[***]
|
[***]
|
[***]
|
10
|
[***]
|
[***]
|
[***]
|
11
|
[***]
|
[***]
|
[***]
|
12
|
[***]
|
[***]
|
[***]
|
13
|
[***]
|
[***]
|
[***]
|
14
|
[***]
|
[***]
|
[***]
|
15
|
[***]
|
[***]
|
[***]
|
16
|
[***]
|
[***]
|
[***]
|
17
|
[***]
|
[***]
|
[***]
|
18
|
[***]
|
[***]
|
[***]
|
19
|
[***]
|
[***]
|
[***]
|
20
|
[***]
|
[***]
|
[***]
|
Total
|
100.00%
|
Page 6 of
6
TERRESTAR
CHIPSET OPTIONS
Exhibit
D2
TerreStar
Satellite Base Station Subsystem
Chipset
Options
Vs
1.2
|
May
2, 2007
|
Xxxxxx
Network Systems, LLC
|
|
00000
Xxxxxxxxxxx Xxxx
|
|
Xxxxxxxxxx,
Xxxxxxxx 00000
|
/s/
Xxxxxxx Xxxxxxx
|
TerreStar
Networks Inc.
|
|
One
Discovery Place
|
|
00000
Xxxxxx Xxxxx Xxxx, 0xx Xxxxx
|
|
Xxxxxx,
Xxxxxxxx 00000
|
/s/
Xxxx
Xxxxxx
|
This
document contains data and information proprietary to TerreStar Networks
Inc. and Xxxxxx Network Systems, LLC. This data is being
furnished pursuant to the provisions of the Contract between TerreStar
Networks Inc. and Xxxxxx Network Systems, LLC for the TerreStar Satellite
Base Station Subsystem. Xxxxxx Network Systems, LLC and
TerreStar Networks Inc. shall have the right to duplicate, use or disclose
the data and information to the extent specified in the Contract and
herein.
|
Information
included in this Exhibit may contain technical data
controlled by the Export Administration Regulations ("EAR") and/or
the International Traffic in Arms Regulations ("ITAR"). This
document has not been cleared for export or transfer to a Foreign
Person or foreign entity.
|
Page 1 of
6
TERRESTAR
CHIPSET OPTIONS
TABLE
OF CONTENTS
SECTION
|
PAGE
|
1.0
INTRODUCTION
|
4
|
1.1
PURPOSE AND SCOPE
|
4
|
1.2
REFERENCE DOCUMENTS
|
4
|
2.0
OPTIONS
|
5
|
2.1
GENERAL TERMS FOR OPTIONS
|
5
|
2.2
LIST OF OPTIONS
|
5
|
Page 2 of
6
TERRESTAR
CHIPSET OPTIONS
TABLE | PAGE |
Table 1-1. Document
Hierarchy
|
4
|
Page 3 of
6
TERRESTAR
CHIPSET OPTIONS
1.1 PURPOSE
AND SCOPE
This
document is Exhibit D2 and defines the Options that can be procured by the
Customer under the Chipset Amendment.
1.2 REFERENCE
DOCUMENTS
Table 1-1. Document
Hierarchy
|
||
No.
|
Document
|
Content
|
1.
|
Contract
|
Terms
and Conditions
|
2.
|
Exhibit
A
|
S-BSS
Statement of Work
|
3
|
Exhibit
A2
|
Chipset
Statement of Work
|
4.
|
Exhibit
B
|
S-BSS
Technical Specifications
|
5.
|
Exhibit
B2
|
Chipset
Technical Specifications
|
6.
|
Exhibit
C
|
S-BSS
Price Schedule
|
7.
|
Exhibit
C2
|
Chipset
Price Schedule
|
8.
|
Exhibit
D
|
S-BSS
Options
|
9.
|
Exhibit
D2
|
Chipset
Options
|
Page 4 of
6
TERRESTAR
CHIPSET OPTIONS
2.1 GENERAL
TERMS FOR OPTIONS
1.
The
Customer may exercise any of the options described in Subsection 2.2 below
(the “Options”) at any time before the date specified in the relevant
Option. The exercise of the Option shall be effective and irrevocable
upon delivery by Customer to Contractor of a written notice referencing such
Option and stating that the Customer is exercising that
Option. Subject to the foregoing, the Customer may exercise as many
of the Options listed in Subsection 2.2 as it may elect.
2.2 LIST
OF OPTIONS
[***]
Page 5 of
6
TERRESTAR
CHIPSET OPTIONS
Page 6 of 6